FORM 3 (See Regulation 3) Project Name: Mahindra Bloomdale 4B Maha RERA Registration Number - P50500020254 Table A - Estimated Cost of the Project (as on 31st Mar 2023) Sr. No. Particulars Estimated Cost (1) (2) (3) 1 i. Land Cost (a) Value of the land as ascertained from the Annual Statement of Rates (ASR). 4,92,95,557 (b) Estimated Amount of Premium payable to obtain development rights, FSI, additional 3,06,87,756 FSI, fungible area, and any other incentive/concession in deficiency under DCR from Local Authority or State Government Administration or any Statutory Authority. (c) Estimated Acquisition cost of TDR (if any). - (d) Estimated Amounts Payable to State Government/UT Administration or competent 9,28,108 authority , or any other statutory authority of the State or Central Government, towards stamp duty, transfer charges. registration fees etc; and (e) Estimated Land Premium payable as per annual statement of rates (ASR) for - redevelopment of land owned by public authorities. (f) Under Rehabilitation scheme : - i. Estimated construction cost of rehab building including site development and - infrastructure for the same as certified by Engineer. ii. Estimated Cost towards clearance of land of all or any encumbrances including cost of - removal of legal/illegal occupants, cost for providing temporary transit accommodation or rent in lieu of Transit Accommodation, overhead cost, amounts payable to slum dwellers, tenants, apartment owners, or appropriate authority or government or concessionaire which are not refundable and so on. iii. Estimated Cost of ASR linked premium, fees, charges and security deposits or - maintenance deposit, or any amount whatsoever payable to any authorities towards and in project of rehabilitation. iv. Any other cost including interest estimated on the borrowing done specifically for - construction of rehabilitation component Sub - Total of Land Cost: 8,09,11,422 ii. Development Cost/Cost of Construction of Building (a) Estimated Cost of Construction as certified by Engineer (As per engineer certificate 44,26,14,138 dated 10.04.2023) (b) Cost incurred on additional items not included in - estimated cost (As per engineer certificate) (c) Estimated Expenditure for development of entire project excluding cost of 3,05,71,846 construction as per (i) above, i.e. salaries, consultants fees, site overheads, development works, cost of service (including water, electricity, sewerage, drainage, layout roads etc.), absorbed cost(attributable to this project) of machineries and equipment including its hire and maintenance costs, consumables etc. (d) Estimated Taxes, cess, fees, charges, premiums, interest etc. payable to any Statutory Authority. (e) Interest payable to financial institutions, scheduled banks, non-banking financial 15,09,20,342 institution (NBFC) or money lenders on construction funding or money borrowed for construction. Sub-total of Development Cost : 62,41,06,326 Total Cost of the Project (Estimated) 70,50,17,747 Table B - Actual Cost Incurred (as on 31 Mar 2023) Amount (Rs.) Sr. No. Particulars Incurred Cost (1) (2) (3) 1 i. Land Cost (a) Value of the land as ascertained from the Annual Statement of Rates 4,92,95,557 (ASR). (b) Incurred expenditure on Premium payable to obtain development rights, 3,02,04,175 FSI, additional FSI, fungible area, and any other incentive/concession in deficiency under DCR from Local Authority or State Government Administration or any Statutory Authority. (c) Incurred expenditure for Acquisition cost of TDR (if any). - (d) Amounts Paid to State Government/UT Administration or competent 9,28,108 authority , or any other statutory authority of the State or Central Government, towards stamp duty, transfer charges. registration fees etc; and (e) Land Premium paid for redevelopment of land owned by public - authorities. (f) Under Rehabilitation scheme : - i. Incurred expenditure for construction of rehabilitation building. Minimum - of (a) or (b) to be considered (a) Cost incurred for construction of rehab building including site - development and infrastructure for the same as certified by Engineer. (b) Incurred Expenditure for construction of rehab building as per the books - of accounts as verified by the CA. ii. Incurred Expenditure for clearance of land of all or any encumbrances - including cost of removal of legal/illegal occupants, cost for providing temporary transit accommodation or rent in lieu of Transit Accommodation, overhead cost, amounts payable to slum dwellers, tenants, apartment owners, or appropriate authority or government or concessionaire which are not refundable and so on. iii. Incurred Expenditure toward ASR linked premium, fees, charges and - security deposits or maintenance deposit, or any amount whatsoever payable to any authorities towards and in project of rehabilitation. iv. Any other cost including interest estimated on the borrowing done - specifically for construction of rehabilitation component Sub - Total of Land Cost: 8,04,27,840 2 Development Cost/Cost of Construction (i). Expenditure for construction of minimum of (a) or (b) to be considered 36,85,13,491 (a) Construction cost incurred including site development and infrastructure 36,85,13,491 for the same as certified by Engineer.(Certificate dated 10.04.2023) (b) Actual Cost of construction incurred as Per the books of accounts as 36,85,13,491 verified by the CA (ii) Cost incurred on additional items not included in - estimated cost (As per engineer certificate) (iii) Incurred Expenditure for development of entire project excluding cost of 2,89,28,828 construction as per (i) above, i.e. salaries, consultants fees, site overheads, development works, cost of service (including water, electricity, sewerage, drainage, layout roads etc.), absorbed cost(attributable to this project) of machineries and equipment including its hire and maintenance costs, consumables etc. All costs incurred to complete the construction of the entire phase of the project registered. (iv) Incurred Expenditure towards Taxes, cess, fees, charges, premiums, - interest etc. payable to any Statutory Authority. (v) Incurred Expenditure towards Interest to financial institutions, 15,10,42,832 scheduled banks, non-banking financial institution (NBFC) or money lenders on construction funding or money borrowed for construction. Sub-total of Development Cost : 54,84,85,151 3 Total Cost of the Project (Actual incurred as on 31st MAr 23) 62,89,12,991 Proportion olthe Cost incurred on Land Cost and Construction 4 89.21% Cost to the total Estimated Cost (Table A). 5 Amount which can be withdrawn from the Designated Account 62,89,12,991 6 Less.: Amount Withdrawn till 31st Mar 23 from Designated Account 33,89,24,945 Net Amount Which Can be withdraw from the Designated bank Account 28,99,88,046 7 under this Certificate Table C- Statement for calculation of Receivables from the Sales of the Real Estate Project Sold Inventory Unit Consideraiion as per Carpet Area (in Balance Sr No Flat No Agreement/ Letter of Received Amount Sqmtr) Receivable (1) (2) Allotment (5) (3) (6) (4) 1 5A504 65.72 42,61,850 36,23,562 6,38,288 2 5A604 65.72 45,94,250 39,05,113 6,89,137 3 5A304 65.72 44,99,000 38,21,871 6,77,129 4 5A404 65.72 52,34,200 39,28,320 13,05,881 5 5C706 47.39 32,39,600 15,70,279 16,69,321 6 5A201 81.15 53,16,570 42,56,992 10,59,578 7 5A602 81.15 53,61,070 40,39,159 13,21,911 8 5D602 80.9 53,08,422 39,81,317 13,27,105 9 5A601 81.15 52,20,000 39,01,272 13,18,728 10 5B503 92.77 64,74,600 48,55,540 16,19,060 11 5D202 80.9 51,12,972 38,34,796 12,78,176 12 5A501 81.15 52,63,404 39,48,792 13,14,612 13 5A301 81.15 51,97,815 38,97,921 12,99,894 14 5A502 81.15 50,55,570 37,65,870 12,89,700 15 5A402 81.15 52,30,570 38,94,667 13,35,903 16 5D603 92.77 68,75,550 10,68,507 58,07,043 17 5C101 50.48 37,47,900 3,74,790 33,73,110 18 5C602 65.85 43,09,440 31,82,917 11,26,523 19 5B301 80.89 54,15,750 5,41,575 48,74,175 20 5D601 80.9 53,16,570 5,02,845 48,13,725 21 5B601 80.89 52,65,423 5,26,542 47,38,881 22 5C102 66.95 47,35,458 4,73,546 42,61,912 23 5C106 47.88 34,41,820 3,44,182 30,97,638 24 5D302 80.9 52,22,822 39,17,116 13,05,706 25 5B103 92.77 65,17,435 55,07,069 10,10,366 26 5A302 81.15 54,74,475 5,47,448 49,27,027 27 5B701 80.89 54,69,255 5,46,926 49,22,329 28 5D702 80.9 53,98,785 5,39,878 48,58,907 29 5D301 80.9 54,09,225 5,40,923 48,68,302 30 5C204 63.1 44,64,145 40,17,719 4,46,426 31 5C605 47.47 33,09,660 3,30,966 29,78,694 32 5C606 47.39 33,05,120 3,30,512 29,74,608 33 5B602 80.82 54,41,850 5,44,185 48,97,665 34 5A702 81.15 54,15,750 5,41,575 48,74,175 35 5B302 80.82 54,43,155 40,68,125 13,75,030 36 5D201 80.9 52,94,385 5,29,438 47,64,947 37 5D102 80.9 55,07,100 5,50,710 49,56,390 38 5A701 81.15 54,15,750 12,08,242 42,07,508 39 5C505 47.47 32,58,630 3,25,863 29,32,767 40 5C506 47.39 32,58,630 3,25,863 29,32,767 41 5B204 92.02 68,61,064 6,45,256 62,15,808 42 5B504 92.02 68,20,375 6,76,958 61,43,417 43 5B604 92.02 66,95,976 6,78,457 60,17,519 44 5C103 62.47 42,45,212 4,23,975 38,21,237 45 5C703 61.9 41,36,940 4,12,981 37,23,959 46 5D502 80.9 58,77,853 5,70,285 53,07,568 47 5D402 80.9 57,02,850 5,89,865 51,12,985 48 5C704 63.1 42,77,140 4,27,714 38,49,426 49 5C705 47.47 31,78,440 3,17,844 28,60,596 50 5C406 47.39 30,05,912 29,58,314 47,598 51 5D703 92.77 64,53,810 54,85,741 9,68,069 52 5A202 81.15 54,48,375 46,31,118 8,17,257 53 5A401 81.15 57,29,080 5,72,387 51,56,693 54 5C401 49.9 32,97,686 3,29,768 29,67,918 55 5C601 49.9 33,33,547 3,33,354 30,00,193 56 5C604 63.1 43,43,311 4,34,331 39,08,980 57 5C701 49.9 32,97,686 3,29,768 29,67,918 58 5B403 92.77 69,14,836 6,91,484 62,23,352 59 5B404 92.02 69,11,180 6,55,437 62,55,743 60 5D303 92.77 65,01,099 55,25,934 9,75,165 61 5A204 65.72 51,48,248 5,16,991 46,31,257 62 5B304 92.02 69,11,180 6,91,118 62,20,062 63 5B401 80.89 56,15,025 47,57,616 8,57,409 64 5B501 80.89 56,15,025 47,72,771 8,42,254 65 5C206 47.39 30,57,600 25,98,960 4,58,640 66 5C304 63.1 41,77,404 35,50,793 6,26,611 67 5A303 65.75 48,41,600 41,15,360 7,26,240 68 5C603 61.9 40,94,640 34,80,154 6,14,486 69 5D501 80.9 56,15,025 47,72,775 8,42,250 70 5D604 92.15 67,09,250 57,21,522 9,87,728 71 5A403 65.75 48,41,600 45,99,520 2,42,080 72 RH06 149.54 1,30,14,750 1,10,62,538 19,52,212 73 5A103 65.75 48,41,600 41,15,360 7,26,240 74 5A104 65.75 48,41,600 41,15,360 7,26,240 75 5A203 65.75 48,41,600 41,14,662 7,26,938 76 5A503 65.75 47,93,728 40,74,669 7,19,059 77 5A603 65.75 48,41,600 41,15,360 7,26,240 78 5A704 65.72 47,93,728 40,74,669 7,19,059 79 5B402 80.82 55,47,269 48,97,304 6,49,965 80 5B502 80.82 56,15,025 47,72,772 8,42,253 81 5C303 61.9 41,36,000 28,95,200 12,40,800 82 5C305 47.47 30,61,800 26,02,530 4,59,270 83 5C306 47.39 30,57,600 25,98,960 4,58,640 84 5C403 61.9 40,98,400 34,83,639 6,14,761 85 5C404 63.1 42,19,600 48,30,208 -6,10,608 86 5C504 63.1 42,19,600 35,86,658 6,32,942 87 5D103 92.77 67,78,800 57,61,981 10,16,819 88 5D701 80.9 56,15,025 47,80,807 8,34,218 89 RH01 149.44 1,25,92,650 1,13,33,385 12,59,265 90 5D503 92.77 66,39,304 56,43,722 9,95,582 91 5A101 81.15 54,92,875 46,68,944 8,23,931 92 5D401 80.9 55,34,239 47,04,104 8,30,135 93 5A703 65.75 47,17,568 40,09,933 7,07,635 94 5B702 80.82 55,08,179 46,81,953 8,26,226 95 5C502 65.85 44,22,000 39,79,800 4,42,200 96 5B202 80.82 56,15,025 50,44,005 5,71,020 97 5B303 92.77 66,43,660 59,79,294 6,64,366 98 5B603 92.77 67,09,000 60,38,100 6,70,900 99 5B703 92.77 69,31,750 6,93,174 62,38,576 100 5B704 92.02 64,83,720 58,27,105 6,56,615 101 5C203 61.9 40,53,280 30,74,500 9,78,780 102 5C205 47.47 29,77,965 26,80,168 2,97,797 103 5C301 49.9 31,48,520 28,33,668 3,14,852 104 5C402 65.85 43,55,670 39,19,880 4,35,790 105 5C405 47.47 29,77,965 26,80,168 2,97,797 106 5C501 49.9 31,72,554 28,55,299 3,17,255 107 5C503 61.9 40,53,280 29,99,276 10,54,004 108 5D203 92.77 67,04,600 60,34,140 6,70,460 109 5D403 92.77 67,04,600 60,34,140 6,70,460 110 5B104 92.02 67,34,300 60,60,870 6,73,430 111 5B201 80.89 52,90,180 47,61,162 5,29,018 112 5B203 92.77 67,00,654 60,30,640 6,70,014 113 5C105 47.47 30,61,800 27,55,620 3,06,180 114 5C201 49.9 32,04,600 28,84,140 3,20,460 115 5D504 92.15 67,38,750 60,64,875 6,73,875 116 5D704 92.15 67,38,750 60,64,875 6,73,875 117 RH03 149.44 1,28,84,603 1,15,96,142 12,88,460 118 RH04 149.44 1,28,52,945 1,15,67,650 12,85,295 119 5C104 63.1 42,14,210 37,92,789 4,21,421 120 5C302 65.85 43,82,805 39,44,524 4,38,281 121 5D404 92.15 67,38,750 60,65,246 6,73,504 122 RH05 149.44 1,30,14,750 1,17,13,260 13,01,490 123 RH02 149.44 1,30,14,750 1,13,74,872 16,39,878 124 5C202 65.85 44,27,528 32,05,816 12,21,712 125 5C702 65.85 44,49,889 40,04,900 4,44,989 126 5D101 80.9 56,80,175 51,12,157 5,68,018 127 5D104 92.15 67,38,750 59,07,375 8,31,375 128 5D204 92.15 66,90,739 58,08,316 8,82,423 129 5D304 92.15 66,90,739 58,39,306 8,51,433 130 5B101 80.89 57,88,499 52,09,649 5,78,850 131 5A102 81.15 55,94,587 50,35,128 5,59,459 132 5B102 80.82 56,88,500 5,68,851 51,19,649 Total - 10157.71 71,88,20,328 46,18,47,082 25,69,73,246 Unit consideration as per agreement/letter of allotment and amount received does not include pass through charges and indirect taxes Unsold Inventory Unit Consideration as per Carpet Area (in Sr No Flat No Ready Sqmtr) (1) (2) Reckoner Rate (3) (4) Total 0 - Unit Consideration as per ready reckoner rate is calculated as under: 1 Carpet area x ASR rate prescribed for the survey no or locality 2 ASR rate is prescribed for built up area. It is converted for carpet area by multiplying factor Table D- Comparison between Balance Cost and Receivables Sr. No. Particulars Amount (1) (2) (3) Estimated balance Cost to Complete the Real Estate Project 7,61,04,757 1 (Difference of Total Estimated Project cost less Cost incurred) Balance amount of receivables from sold apartments as per Table C of this 25,69,73,246 2 certificate (as certified by Chartered Accountant as verified from the records and books of Accounts) - 3 (i) Balance Unsold area (to be certified by Management and to be verified by CA from the records and books of accounts) - (ii) Estimated amount of sales proceeds in respect of unsold apartment (calculated as per ASR multiplied to unsold area as on the date of certificate, to by calculated and certified by CA) as per Table C to this certificate 4 Estimated receivables of ongoing project [Sum of 2 + 3(ii)] (To Be Filled for Ongoing Projects only) Amount to be deposited in Designated Account - 70% or 100% Not Applicable as this is not IF 4 is greater than 1, then 70% of the balance receivables of ongoing project 5 an ongoing project will be deposited in designated Account If 4 is lesser than 1, then 100%; of the balance receivables of ongoing project will be deposited in designated Account Table E- Designated Bank Account Details Bank Name: Kotak Mahindra Bank Ltd Sr. No. Particulars Bank Account No: 2513284687 Bank Account Name: MAHINDRA BLOOMDALE DEVELOPERS LTD-MAHINDRA BLOOMDALE 4B- RERA Actual Amount till Date (From start of bank account to till 31st Mar 2023) 1 Opening Balance - 2 Deposit 34,44,70,958 3 Withdrawals 33,89,24,945 4 Closing Balance 55,46,013 We hereby certify that required proportion of money, as specified in the act, collected from allottees of the project unit as indicated in Table C-has been deposited in Designated RERA Bank account, except 1 An amount of Rs.14,76,658 pertaining to other projects has been inadvertently deposited in RERA collection account. The company identifies such erroneous transfers from time to time and deposits it in the correct RERA Collection account. However, withdrawals made out of the amount deposited in this project pertaining to other projects is within the overall withdrawal limits of those projects. 2 An amount of Rs.3,03,896 pertaining to this project was deposited in other project's RERA collection accounts. The company identifies such erroneous transfers from time to time and deposits it in the correct RERA Collection account. However, the amount deposited in other projects along with the amount withdrawn is within the overall withdrawal limit of this project. We hereby certify that Mahindra Bloomdale Developers Limited has utilized the required proportion of money, as specified in the act, collected from allottees for this project only for land and construction of this project. Table F- Means of Finance Estimated* (At time of Registration) Proposed /Estimated as on 31st Actual as on 31st Mar 2023 Sr. No. Particulars (ln Rs.) (proposed and indicative) Mar 2023 (ln Rs.) (ln Rs.) 1 Own Fund 6,36,49,572 8,09,11,422 8,04,27,840 Total Borrowed Funds (Secured) - - - 2 - Drawdown availed till date Total Borrowed Funds (Unsecured) 26,73,89,268 53,90,01,220 20,95,60,206 3 - Drawdown availed till date 4 Customer Receipts used from Project 42,82,53,696 62,04,22,339 33,89,24,945 5 Total Funds for Project 75,92,92,536 1,24,03,34,981 62,89,12,991 Total Estimated and Acutal Cost ( As per 6 Table A and B) 52,62,37,072 70,50,17,747 62,89,12,991 Table G Any Comments/Observation of CA 1 Refer Annexure I to the Certificate. 2 FOR ABD & CO LLP Chartered Accountants Firm Registration No. W100145 Devdatta Mainkar Partner Membership No. 109795 Agreed & accepted by For Mahindra Bloomdale Developers Ltd Chief Project Officer 18th April 2023