Annexure A FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at time of Registration of Ongoing Project and withdrawal of Money from Designated Account) Date: 02/02/2026 To, M/s Pune 410504 Subject: Certificate of Percentage of Completion of Construction Work of project “ICON TOWER” having Maha RERA Registration Number PR1260002501567 being developed by AYODHYA ASSOCIATES Sir, I Architect Mr. Kunal Sunil Chordiya undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of of project “ICON TOWER ” having MahaRERA Registration Number P52100050702 being developed by AYODHYA ASSOCIATES. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE –A Building – Divyata Park Rowhouse Sr. No. Tasks /Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100% 2 Basements NA 3 Podiums NA 4 Plinth 100% 5 Stilt Floor 100% 6 Slabs of Super Structure 10% Internal walls, Internal Plaster, Floorings, Doors and 7 00% Windows within the Flat/Premises 8 Sanitary Fittings within the Flat/Premises 00% Staircases, Lifts Wells and Lobbies at each Floor level 9 connecting Staircases and Lifts, Overhead and Underground 0% Water Tanks External plumbing and external plaster, elevation, 10 completion of terraces with waterproofing of the 0% Building/Wing, Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving 11 0% of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be requirements as may be required to complete project as per specifications in agreement of sale, Any other activities TABLE – B Common Areas (Internal & External Development Works) in Respect of the Registered Phase / Project Number Percentage of Actual Work Proposed Sr. No. Common areas and Facilities Done (As on Details (Yes/No) date of the Certificate) (1) (2) (3) (4) (5) Pavir tiles or 1 Internal Roads &Footpaths NA 0% Trimix concrete road 2 Water Supply Yes 80% water supply R.C.C. hume pipes Sewerage (chamber, lines, Septic 3 Yes 80% with masonry Tank ,STP) chambers R.C.C. hume pipes 4 Storm Water Drains NA 0% with masonry chambers 5 Landscaping & Tree Planting NA 0% Yes 6 Street Lighting NA 0% Yes 7 Community Buildings NA NA NA Treatment and disposal of sewage 8 NA NA NA and sullage water Solid Waste management & 9 NA NA NA Disposal As per Water conservation, Rain water 10 NA 0% requirement of harvesting Town Planning As per Town 11 Energy management NA 0% Planning norms As per Fire protection and fire safety 12 NA 0% requirement of requirements Town Planning Electrical meter room, sub- Separate Meter 13 NA 0% station, receiving station area 14 Others NA NA NA Yours Faithfully, AR.KUNAL SUNIL CHORDIYA (License No. CA/2019/113846) Agreed & accepted by: Promoter (Proprietor)