FORM-2A lsee MahaRERA order No._] ENGINEER,S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certif icate) (To be submitted at end of the financial year) Date - O7 /1.0/2O2s To, The AEIOUZ CORRP ttP Office 101 to 109 Laxmi complex, lst Floor, Mumbai Pune Road, Chinchwad, Pune 411019 Quality Assurance Certificate (Project Registration No. P5210q)79035 for the Year Ending 2024 - 2025 ) Subject: Certificate for quality of materials used and quality of Construction and workmanship for the work of VSG Legacy One having MahaRERA Registration Number P521m07!rc36 being developed by AEIOUZ CORRP tLP Sir, lAVe Nikhil Shankar Adhav have undertaken an assignment of supervision of this real estate project. Our Responsibility. To carry out the work in accordance with the development permission and as per the approved plan and submit certificate of supervision of work and to carry out material testing in-situ or in the authorized laboratory as per prevailing and applicable standards and to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and or other relevant code of practice. The details of the quality are as follows: 1. Structural Design, Stability and Testing Sr. Parameters Yes No Remarks No L. Whether soil investigations of the site has Yes been conducted before the structural design and soil parameters have been accounted for in the structural design/ drawings? 2 Whether Structural Engineer has been Yes Name: STRUDCOM appointed for the Project? Consultant Pvt Ltd License No: PCMClSfElOLaOl2023 Mobile: +91 9011459838 Email: info@strudcom.com 3. Whether the lnspection Registers, Site Yes order book and Quality control Test registers are maintained at the site properly and endorsed by the Engineer-in- charge? 4. Whether testing facilities to check quality No of material is available at site? 5. whether the statuary provisions for Yes disaster resistance / earthquake resistant design have been incorporated, Specially in case of multi-storeyed Construction? 6 Has suitable cognizance been taken on NA demarcated flood lines and appropriate precautions taken for protecting the site from flooding considering local flooding issues? 2. lnput Materials Sr. Patameters Yes No Remarks No 1. Whether the following Building Materials confirm to relevant lS/ BS/NBC code, or as per industry standards. lf yes, provide details: (a) Cement, concrete and Coarse Yes Casting & Testing Aggregate carried out as per lS 516-1959(Reaffirmed 1999 (b) Steel and its alloys Yes Specified limit as per lS:1786- R.A.2018) (c) Electrical wire, fi ttings and accessories Work Not Started d) Plumbi and Sanitary Fittin wJrk ruot started 2 Whether regular tests of materials and Yes Durocrete Engineering construction Products are bei done from Services pvt hd accredited labs also? lf yes, details of such labs 3. whether manufacturer test certificate for Yes cement, steel, pipes etc. have been obtained with supply and records are being maintained? 4 Whether Suitable water ls being used for Yes i. Boanrell, PCMC construction Connection i. What is the source of water ii. Tested and ii. Has water been tested and approved by aPProved Engineer-in-charge before construction iii. Has water been tested subsequently as per Requirement 3. Quality of Workmanship Sr. Parameters Yes No Remarks No 1. Whether works of all the electrical writing / Yes connections / lift installation / other electrical installations have been carried out under authorized / registered electrical engineer and its records has been maintained. 2 Whether all related works of plumbing & sanitary work Not including installation of water supply systems, Started drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized / registered plumbers / sanitary contractors and its records has been maintained. 3 Whether all the work is being carried out under Yes supervision of experienced and skilled professional. Further, workmanship and quality is satisfactory and up to the mark and the work has been acceptable within the permissible limits of deviations as per relevant code of practice. 4. whether remedial measures are undertaken to Yes prevent Dampness & Leakages? lf yes, provide deta ils 5. whether safety precautions are during Yes construction activities for workers? 4. Miscellaneous Sr. Parameters Yes No Remarks No 1. Whether third party quality inspection is being Yes Cube Tested by carried out on site during / after completion of the External Lab, works. lf s, rovide details Cond NDT 2 Whether anti-termite treatment has been Yes undertaken for the soil? 3 Whether fire-fighting arrangements has been Yes undertaken under supervision of fire consultant? 4 Whether proper signages have been installed on Yes site / completed building as per requirement. 5. Whether precautions are undertaken to avoid air Yes Providing green net pollution during construction? Please specify. and sprinkling water Whether records of all test reports / results have Yes 5. been properly kept in the prescribed formats to be available at site for viewing by allottees and to be handed over to the association of allottees 7 Whether all relevant records including sanctioned Yes Building plans, utility drawings, Various test reports / results have been properly kept in the prescribed formats to be handed over to the association of allottees 8 Any innovative / cost effective / green technology Yes lnnovative /cost has been used for improving Quality / Energy effective efficiency. Yours Faithfully, Signature of Engineer Name: Nikhil Shankar Adhav Qualification: BE Civil License No. : Phone No: 9822096957 Place: Pune Agreed and accepted by @ 5ig ter Name: Mr. JIGAR Date:07110