KIMAYA ASSOCIATES t \.. Annerure A TORM I Isee Regulation 3l ARCHITECT'S CERTIFICATT (To be submitted at the time of registration of Ontoint Proiect and for wlthdrawal of Money from Designated Account) Oete:OZlOll2o25 To, M/s A€IOUZ CORRP LLP. Gat no. 129 & 130(P), Chikhali, Taluka: Haveli District: Pune - 411062 Subiect : Certificate of Percentage of completion of Construction Work of 'VSG LEGACY Ot{E- Gat no. 129 130 P lch ikh a li Taluka: Haveli District: Pune - t 062 having Mah.r RERA Registration Number----------.'- {Only Applicable after pro.iect Regi5tration ) beinil developed by M/s AEIOUZ CORRP LLP. Sir, l/We Kimaya Associates have undertaken assignment as Archilc'ct /Licur:ed 5urveyor irf certifying percentage of Completion of Construction Work of ""VSG LEGACY ONE " " ,G3!-09, iz9 e tlO plChikhali, raluka: Haveli Distrlct: Pune - 4U062 having Maha RIRA Registraticn Number ----*-(Only Applicable after project Registratron, berng developed by M/s AEIOUZ CORRP LLP. Based on Site lnspection, with respect to Layout/ each of the BuilrlingArVing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of vrork done for each of the building/Wing of the Real Estate Proiect under Maha RERA rs as per Table A herein below. The percentage of the work executed with respect to each of the activity of thc entire phase is detailed in Table B. A La, 19 ortln lht lir 8rr, ln l6t,tJ f-4 o * 0.{r Crd. * lltrfrc{ Prrl. al! tI hrnr ' ..or t) Oltrrr ' ; , 95\75117 rO7 80Er1!!r': I I TA8I.E.A Layout/Buildin8,/Wing Number no. --- (to be prepared separately ior each Layout/Building/Win8 of the Proiect) Sr. Tasks / Activity Percentage of Actual Worl Nc (2) Done ru (As on date of the Certificate) (3) i Fxcavation 0% 2. Easements Parking (if any) 0% 3 Podiums (if any) lrua 4 Plinth 00,/n 5. Stilt Floor 0% 6. Slabs of Supcr Structtrre 0 1 lnternal walls, lnternal Plaster, Floorings, Doors 0"/, and windows wrthin Flats/Premises 8. Sanitary tittings within the flat/premises 9 Staircases, lrfts Wells and Lobbies at each Floor 0% level Overhead and Underground Water Tanks lC. External plumbing and external plaster, el completion of terraces with waterproofing of the Building,/Wing- 1i Installation of Lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFT NOC, Electrical fittings, mechanicai equipment, complianco to condrtions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall . and all other requirernents as may tle required to complete pro,ect as per specifications in agreement of 5ale. Any other activities. _l tr \\* 213 .alr 6!s TABTE-B Common Areas (lnternal and External Developmenl Works) in respect of the Registered Phase / Proiect Number Sr. Common art'as and Proposed Percentage of Det.ils No. facilities {Yes /No} Actual Work (5) (1) (2) (3) Done (As on date of the Certificat e) (4) 1. lnternal Roads &Y Foo tpaths _ 2. ater Supply o% 3 Sewerage (Chamber, lines, Oo,'o Septic Tank, STP). t. Storm Water Drains o% 5. Landscaping & Tree'Y o% Planting 6 Str eet LightinS 0% . 7. Community Buildrngs o% 8 Treatment and disposal of 09; sewaBe and sullage water. 9. Solid Waste management Y 09,', & Disposal 10. Water conservation / Rain Y o% water harvesting 11. Energy management o91" t2. Fire protection and fire 0% safety r€q uirements l- - 13 r roo m, sub- Y o% ng st ation. Thanl