ANNEXURE A FORM-2А [See Regulation 3A.] ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at end of the Financial Year) Date: 03/08/2026 To, SAHEEL LANDMARKS PRIVATE LIMITED Office No. 210, V-18, Opp. Cummins India Campus, Balewadi, Pune 411045. Quality Assurance Certificate (Certificate No. for the year ending March 2026) Subject: Certificate for quality of materials used and quality of construction and workmanship for the work of "ITREND PALACIO” having MahaRERA Registration Number P52100055190, being developed by SAHEEL LANDMARKS PRIVATE LIMITED. Sir, I/ We Pradnya Rajendra Pingale have undertaken the assignment of supervision of this real estate project. Our Responsibility. To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and/ or other relevant code of practice. The details of the quality are as follows: 1. Structural Design, Stability and Testing Sr. Parameters Yes No Remarks No. 1. Whether soil investigations ofthe Yes site has been conducted before the structural design and soil parameters have been accounted for in the structural design/ drawings? 2. Whether Structural Engineer has Yes Name: been appointed for the project? Rajesh vasudev Mankani License No: PCMC/STE/0327/2026 Mobile: 98904 45869 E-Mail: Rajesh.mankani@designwerkz.in 2. Whether the inspection registers, Yes site order book and quality control test registers are maintained at the site properly and endorsed by the Engineer-in-Charge? 3. Whether testing facilities to check Yes quality of material is available at site? 4. Whether the statuary provisions Yes for disaster resistance/ earthquake resistant design have been incorporated, specially in case of multi-storeyed construction? 5. Has suitable cognizance been taken Yes on demarcated flood lines and appropriate precautions taken for protecting the site from flooding considering local flooding issues? 2. Input Materials Sr. Parameters Yes No Remarks No. 1. Whether the following building materials confirm to relevant IS/BS/NBC Code, or as per Industry Standards? If yes, provide details: (a) Cement, concrete and coarse Yes aggregate (b) Steel and its alloys Yes (c) Electrical wire, fittings and Yes accessories (d) Plumbing and sanitary fittings Yes 2. Whether regular tests of materials Yes Lab name- and construction products are being 1)NABL-Constrologix Lab done from accredited labs also? If yes, 2)NABL-Strongtech. details of such labs 3. Whether manufacturer test Yes certificate for cement, steel, pipes etc. have been obtained and whether supply records are being maintained? 4. Whether suitable water is being used Yes Source of water-By tanker for construction? (i) What is the source of water? (ii) Has water been tested and approved by Engineer-in-Charge before construction? (iii) Has water been tested subsequently as per requirement? 3. Quality of Workmanship Sr. Parameters Yes No Remarks No. 1. Whether works of all the electrical Yes wiring/connections/lift installation / other electrical installations have been carried out under authorized /registered electrical engineer and whether records of the same has been maintained? 2. Whether all related works of Yes plumbing & sanitary including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized /registered plumbers / sanitary contractors and whether records of the same has been maintained? 3. Whether all the work is being Yes carried out under supervision of experienced and skilled professional? Further, whether the workmanship and quality are satisfactory and up to the mark and the work is within the acceptable and permissible limits of deviations as per relevant Code of Practice? 4. Whether remedial measures are Yes undertaken to prevent dampness and leakages? If yes, provide details 5. Whether safety precautions are Yes undertaken during construction activities for all type of workers? 4. Miscellaneous Sr. Parameters Yes No Remarks No. 1. Whether third party quality Yes Third party Consultant firm inspection is being carried out on site name- Poqual solutions during/after completion of the works? If yes, provide details. 2. Whether anti-termite treatment Yes has been undertaken for the soil? 3. Whether fire-fighting arrangements Yes has been undertaken under supervision of fire consultant? 4. Whether proper signages have Yes been installed on site/completed building as per requirement? 5. Whether precautions are Yes 1) AQI Monitor undertaken to avoid air pollution 2) Anti-smog machine during construction? Please specify. 3) Green net provides 6. Whether records of all test reports Yes / results have been properly kept in the prescribed formats and whether the same are available at site for viewing by allottees and to be handed over to the association of allottees? 7. Whether all relevant records Yes including sanctioned building plans, utility drawings, various test reports / results have been properly kept in the prescribed formats to be handed over to the association of allottees? 8. Any innovative/ cost effective/ green Yes Solar PV technology has been used for improving quality/energy efficiency? Please specify Agreed and Accepted By: - For SAHEEL LANDMARKS PRIVATE LIMITED Yours Faithfully, anG Sael l ANDM Pingde SACHIN GARG ARKLS PUNPEs Signature of Engineer (Site Supervisor) Authorized Signatory Name: Mrs. Pradnya Rajendra Pingale S .* AHE LTD Date: 03/08/2026 Qualification: M.tech in Costruction Management License No.: PCMC/SE/0204/2026 Phone No.: 7058172809 Place: Pune