.• .. II .1 .. ........ II ..... II .. .. ... K. P. Badgujar .... ............. """''''' ".1.." Consultants PVl. Ltd . "'S0900':2OOOl~~ ENGINEER'S CERTIFICATE Date: 27/7/2017 Kadam OevelopNs, Sr. No. 45/1/1, lane No.2, Vidya Nagar, Pimple Gurav - 411061 Subject: Certificate of cost Incurred for Development of SAIYOG for construction of A building situated on the plot bearing Sr. No. 45/1/1 demarcated by its boundaries (latitude 18 degree 5S'SO.3S"N and longitude 73degree 82'05.26"E of the end points) Adjoining Sr. NO. 833(P}, 831(P) to the north Road & Adjoining Sr. No. 840 & 84110 the south Adjoining Sr. No. 831(P) to the east Adjoining Sr. No. 839(P) to the west of Division Pune village Pimple gurav lalu~a Haveli District Pune PIN 411061 admeasuring 852.07 sq, mts. area being developed by Kadam Developers. Ref, RERII Registration Number _ Sir, I K. P. 6adgujar Consultants Pvt. Ltd. have undertaken assignment of certifying Estimated cost 10' the subject Real Estate project proposed to be registered under RERII, being II Building $AIYOG Building siluated on the plot bearing Sr. No. 4$/1/1 01 DiVision Pune village Pimple gurav taluka Haveli District Pune PIN 411061 admeasuring 852.07 sq. mts. are. being developed by Kadam Developers. I,Following technical professionals are appointed by owner/promoter:· (i) Mis S. K, Associates as L.S'/lIrchitecl; (ii) M/s A. J. Design as structural consultant (iiil M/s/Shri/smt as MEP Consultant(NA) (iv) Mis K. P. 6adgujar COMultants Pvt. as Qu~nlity Surveyor l.we I\;)ve en,mated the C05t 01 the complellon 10 OOtall' occupation cert,licale{COmpletlOn certif,cale 01 the civil, MEP and fIIhed works, 01 the building(sl of the project. Our estimated C05t calculations are based on the Drawings{plans made available to uS for th£> proj£>ct und£>r reference by the developer & consullants and the schedul£> of It£>ms and quantity $u(V£>yor YOlesh Kadam appomted by d£>velOp('r{Engin«,r. and the assumption of lhe C051 of material, labour ;lnd other inputs milde by develop('r. and the !>Ite inspe bUlldlng(s) 01 the ilforesaid projea undN reference as Rs. 1,9g.60,OOO{·. lhe estimated total cost of project is with reference to the C1vll,MEP and allied works required to be completed for th£> pu'~ 0/ obtaining OCCUpatIOn certifocate{completlQll certohcate for the purpose 01 obtalnins OCCUpatIOn certlhCilte{completion certificate lor the build,ng(s) from the Pimpri Chinchwad Municipal Corporation bemg the planning lIuthorlty under whose jurisdICtion the aforesaid project is being implemented. 4.The estimated C05t incurred till date IS calculated at Rs. 84,80,OOO{·.Thc amount of estimated C05t Incurred IS c.a1culated on the baS£' of amount of tOlal cst,mated C05I. S,The balance cost 01 completion 01 the ciVil, MEP ilnd allied works of the buildmg(s)of the subje