FORM1 [seeRegulation3] ARCHITECT'SCERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 16.062017 To The Flagship Infrastructure Private Limited Cts No.988, 101, Somnath, Ram Mandir Road, Vile Parle (E),Near Tilak Mandir, Mumbai- 400057, Maharashtra, , Subject: Certificate of Percentage of Completion of Construction Work of The LoftsNo. ofBuilding(s)/ -Wing(s) of the - Phase of the Project Blue Ridge - THE LOFTS [Applied] situated on the Plot bearing C.N. No/CTS No./Survey no./Final Plotno Survey No.119 (P) to 125+154(P) to 160+160/2 to 171+173, Plot No.1 demarcated by its boundaries (latitude-18 °58’17’’4’’and longitude 73°73’53’’61’’of the end points) 30 meter Road tothe North Symbiosis Institute of International Business to the South Internal Township Road to the East Symbiosis Institute of International Business to the West of Division Pune village Hinjawadi Taluka Mulshi District Pune PIN 411057 admeasuring 7926.75 sq.mts. out of Blue ridge project D land area being developed by Flagship Infrastructure Private Limited. Blue Ridge Project D land is all that portion of land bearing User Zone R1 admeasuring about 46702.22 out of survey no Survey No.119 (P) to 125+154(P) to 160+160/2 to 171+173, Plot No.1 carved out of the total township land. Sir, I/ We ANIRUDDHA VAIDYA & ASSOCIATES have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of the The Lofts Building(s) / - Wing(s) of the - Phase of the Project, situated on the plot bearing C.N. No/CTS No./Survey no./ Final Plot no Survey No.119 (P) to 125+154(P) to 160+160/2 to 171+173, Plot No.1 of Division Pune village Hinjawadi taluka Mulshi District Pune PIN 411057 admeasuring 7926.75sq.mts. area being developed by Flagship Infrastructure Private Limited. 1. Following technical professionals are appointed by Owner/ Promoter:- (i) Shri as RadhikaAniruddha VaidyaL.S./Architect ; (ii) Shri U.M Joshi (j+w consultant)as Structural Consultant (iii) ShriKetanDantaleas MEP Consultant (iv) ShriAjay Bhujbal asSite Supervisor Based on Site Inspection, with respect to each of the Building/Wing of the afore said Real Estate Project ,I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number under Applied MahaRERAis as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Blue Ridge - THE LOFTS(to be prepared separately for each Building/Wing of the Project) Sr.No Tasks /Activity Percentage Ofwork done 1 Excavation 100% 2 02 number of basement (s) and Plinth 25% 3 number of Podiums (N/A) 0% 4 Stilt Floor (RCC + Finishing) 0% 5 32 number of Slabs of Super Structure 0% 6 Internal walls, Internal Plaster, 0% Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, 0% elevation , completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting 0% Fittings And Equipment as per CFONOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate Internal & External Development Works in Respect of the entire Registered Phase S.No Common areas Proposed Percentage of Details And Facilities, (Yes/No) Work done Amenities 1. Internal Roads & Yes 80% Footpath only Foothpaths 2. Water Supply Yes 80% 3. Sewarage Yes 80% No septic tank (chamber, lines, Septic Tank , STP) 4. Storm Water Yes 80% Drains 5. Landscaping & Yes 70% - Tree Planting 6. Street Lighting Yes 80% - 7. Community No 0 N.A Buildings 8. Treatment and Yes 70% Disposal of sewage and sullage water 9. Solid Waste Yes 90% Management & Disposal 10. Water Yes 70% conservation, Rain water harvesting