FORM1 [seeRegulation3] ARCHITECT'SCERTIFICATE (To be submitted atthe time ofRegistration of Ongoing Projectandfor withdrawal ofMoney from Designated Account ) Date:26.04.2021 To M/S. PARANJAPE SCHEMES (CONSTRUCTION) LIMITED. Pune. Subject:Certificate of Percentage ofCompletion of Construction Work of 3Wing(s) of the Forest TrailsAthashri-B2(Sector R26-B2A, B2B, B2C) oftheProject[MahaRERARegistration Number P52100000029] situatedon the Sector No.R- 26,Survey No 16/1 and othersdemarcated by its boundaries Latitude18030'41"N , Longitude73044'02.76"E , By G4,G4 A,OS 13 tothe East, By part of G 61 andbeyond that 12.0 mtown ship road tothe West,by G 61 to the North,G 61 and portion of 12.0 m township roadtothe Southof Division-Pune, Village–MoujeBhugaon,Taluka–Mulshi,District-Pune 412115admeasuring 9913.274sq.mts.Areabeing developedbyM/S. PARANJAPE SCHEMES (CONSTRUCTION) LIMITED Sir, IRadhika A.VaidyahaveundertakenassignmentasArchitect/LicensedSurveyorof certifyingPercentage of Completion of ConstructionWork of 3 Wing(s) of theForest TrailsAthashri –B2(Sector R26- B2A, B2B, B2C)oftheProject [MahaRERARegistration NumberP52100000029] situatedon theSector No.R-26, Survey No 16/1 and othersdemarcated by its boundaries Latitude180 30'41"NLongitude73044'02.76"E , By G4,G4 A,OS 13 to the East, By part of G 61 andbeyond that 12.0 mtown ship road to the West, by G 61 to the North, G 61 and portion of 12.0 m township roadto the Southof Division - Pune Village - MoujeBhugaon,Taluka - Mulshi,District-Pune 412115admeasuring 10009.52sq.mts.Areabeing developedby M/S. PARANJAPE SCHEMES (CONSTRUCTION) LIMITED 1 1. Followingtechnicalprofessionalsareappointedby Owner/ Promoter:- (i) Ar. Radhika A. Vaidya asL.S. / Architect; (ii) JW consultants LLP asStructuralConsultant (iii)Aquamate consultants PVt.Ltd_asMEPConsultant (iv) Praveen DeshpandeasSiteSupervisor. BasedonSiteInspection,withrespecttoeachoftheBuilding/Wingoftheaforesaid RealEstateProject ,Icertify thatason thedateofthiscertificate, thePercentageof Workdoneforeachofthebuilding/WingoftheRealEstateProjectasregisteredvide number under MahaRERAis as per table A herein below. The percentageoftheworkexecutedwithrespecttoeachoftheactivityoftheentirephase is detailedinTable B. Table A Forest TrailsAthashri- B2(Sector R26-B2A) (tobepreparedseparately foreachBuilding/Wingof theProject) Sr.N Tasks /Activity Perce o ntage Ofwo rk done 1 Excavation 100 % 2 Plinth 90% 3 Number of Podiums 90% 4 Stilt Floor 90% 5 Number ofSlabs of Super Structure 61% 2 6 Internal walls,Internal Plaster, Floorings within 25% Flats/Premises, Doors andWindows toeachofthe Flat/Premises 7 SanitaryFittings withinthe Flat/Premises, Electrical Fittings within the 0% Flat/Premises 8 Staircases,Lifts Wells andLobbies ateach Floorlevel 0% connectingStaircases andLifts, OverheadandUndergroundWater Tanks 9 The external plumbingandexternal plaster, 0% elevation,completionofterraceswithwaterproofingof the Building/Wing 10 Installationof 0% lifts,waterpumps,FireFightingFittingAndEquipmentasperCFONOC,Elec tricalfittingsto Common Areas, electro, mechanical equipment, Compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, CompoundWall andallotherrequirementsasmaybe requiredto ObtainOccupation /Completion Certificate Table A Forest TrailsAthashri - B2(Sector R26-B2B) (to be prepared separately for each Building/Wing of the Project) Sr. No Tasks /Activity Percentage Of work done 1 Excavation 100% 2 Plinth 90% 3 Number of Podiums 90% 4 Stilt Floor 90% 5 Number ofSlabs of Super Structure 76% 3 6 Internal walls,Internal Plaster, 30% Floorings within Flats/Premises, Doors andWindows toeachofthe Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 5% connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, 5% elevation, completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting 0% Fitting And Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, CompoundWall andallotherrequirementsasmaybe requiredto ObtainOccupation /Completion Certificate Table A Forest TrailsAthashri - B2(Sector R26-B2C) (to be prepared separately for each Building/Wing of the Project) Sr. No Tasks /Activity Percentage Of work done 1 Excavation 100% 2 Plinth 80% 3 Number of Podiums 80% 4 Stilt Floor 85% 4 5 Number ofSlabs of Super Structure NA 6 Internal walls,Internal Plaster, 30% Floorings within Flats/Premises, Doors andWindows toeachofthe Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting 0% Fitting And Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, CompoundWall andallotherrequirementsasmaybe requiredto ObtainOccupation /Completion Certificate Internal&ExternalDevelopmentWorksinRespectoftheentireRegisteredPhas e S.No CommonareasandFacilities, Proposed Percentageof Details Amenities (Yes/No) Workdone 1. InternalRoads&Footpaths Yes 15% 2. WaterSupply Yes 90% 3. Sewerage(chamber,lines, Yes 0% SepticTank ,STP) 4. StormWaterDrains Yes 0% 5. Landscaping&TreePlanting Yes 0% 6. StreetLighting Yes 60% 7. CommunityBuildings NO - NA 8. Treatmentanddisposalof Yes 0% sewageand sullagewater 9. SolidWaste Yes 0% management& Disposal 10. Water conservation, Rain water Yes 0% harvesting 5 11. Energy management Yes 0% 12. Fireprotectionandfiresafety Yes 0% requirements 13. Electricalmeterroom,sub- Yes 10% station, receivingstation 14. Guest rooms Yes 20% 15. Card and Carrom Yes 0% 16. Physiotherapy room Yes 0% 17. Resident manager office Yes 0% 18. Multipurpose hall Yes 0% 19. Dining Yes 0% 20. Library Yes 0% 21. Space for doctor Yes 0% YoursFaithfully For Aniruddha Vaidya & Associates AR.RADHIKA VAIDYA L.S/ Architect License No CA/85/8968 6