FORM1 [seeRegulation3] ARCHITECT'S CERTIFICATE (To be submitted atthe time ofRegistration of Ongoing Projectandfor withdrawal ofMoney from Designated Account) Date: 15.06.2017 To FLAGSHIP INFRASTRUCTURE,PVT.LTD, HINJAWADI,MULSHI,PUNE Subject:Certificate of Percentage ofCompletion of Construction Work of 2 nos. of building(s)/wingsBlue Ridge Project C Land T-18,19Wing(s) --- Wing(s) of the Phaseof the Project[MahaRERARegistration Number] situated on the Plot bearing S.NO. 119 (P) to 125+154(P) to 160+160/2 to 171+173, As per Sanction drawing demarcated by its boundaries (latitude-180 34'31.69" and longitude - 730 44'32.69" of the end points)BlueRidge Golf Courseto the North,Blue Ridge Internal road to the South,Blue Ridge Internal road to the East & Tower 20,21to the West of Division PUNE Village- HinjewadiTaluka- Mulshi District- Pune PIN 411057 admeasuring 7228sq.mts. out of Blue ridge project C land area being developed byFlagship Infrastructure Private Limited. Blue Ridge Project C land is all that portion of land bearing User Zone R2 admeasuring about 130750 out of survey no Survey No.119 (P) to 125+154(P) to 160+160/2 to 171+173, Plot No.1 carved out of the total township land. Sir, I ANIRUDDHA VAIDYA & ASSOCIATES ARCHITECTS have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of Blue Ridge Project C Land T-18,19Wing(s) of the Phase of the Project, situated on the Plot bearing S.NO. 121,122 & 123 as per sanction drawing Of Division –PUNE, Village –HINJAWADI, Taluka– MULSHI, District –Pune, PIN –411057. Admeasuring7228 sq.mts. area being developed by F L A G S H I P INFRASTRUCTURE,PVT.LTD. 1. Followingtechnical professionalsare appointedby Owner/ Promoter:- (i) Smt. RADHIKA ANIRUDDHA VAIDYA as L.S. /Architect; (ii) Shri. U.M.JOSHI as Structural Consultant (iii) Shri. KETAN DANTALE as MEP Consultant (iv) Shir- RAJA GAGNE as Site Supervisor. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project ,I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number under Maha RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Blue Ridge Project C Land T-18 (to be prepared separately for each Building/Wing of the Project) Sr. Tasks /Activity Percentage No Ofwork done 1 Excavation 100% 2 2 number of Basements and Plinth 85% 3 0 number of Podiums 0% 4 Stilt Floor 0% 5 31 number of Slabs of Super Structure 100% 6 Internal walls,Internal Plaster, Floorings within Flats/Premises, 65% Doors andWindows toeachofthe Flat/Premises 7 SanitaryFittings withinthe Flat/Premises, Electrical Fittings within the 55 % Flat/Premises 8 Staircases,Lifts Wells andLobbies ateach Floorlevel 30% connectingStaircases andLifts, OverheadandUndergroundWater Tanks 9 The external plumbingandexternal plaster, 35% elevation,completionofterraceswithwaterproofingof the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting Fittings And Equipment 60% as per CFO, NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as maybe required to Obtain Occupation /Completion Certificate Table A Blue Ridge Project C Land T-19 (to be prepared separately for each Building / Wing of the Project) Sr.N Tasks /Activity Percentage o Ofwork done 1 Excavation 100% 2 2 number of Basements and Plinth (rcc+finishing) 90% 3 0 number of Podiums 0% 4 Stilt Floor 0% 5 31 number of Slabs of Super Structure 100% 6 Internal walls,Internal Plaster, Floorings within 60% Flats/Premises, Doors andWindows toeachofthe Flat/Premises 7 SanitaryFittings withinthe Flat/Premises, Electrical 55 % Fittings within the Flat/Premises 8 Staircases,Lifts Wells andLobbies ateach Floorlevel 35% connectingStaircases andLifts, OverheadandUndergroundWater Tanks 9 The external plumbingandexternal plaster, 40% elevation,completionofterraceswithwaterproofingof the Building/Wing 10Installation of lifts, water pumps, Fire Fighting Fittings And 60% Equipment as per CFO, NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate