FORM-2A ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE To, KBC GLOBAL LIMITED 2nd floor, Gulmohar status, Above Business Bank, Samarth Nagar, Nashik-422005 Quality Assurance Certificate (Certificate No-for the Quarter Ending 30.09.2024) Subject: Certificate for quality of materials used and quality of Construction and workmanship for the Work of 1 Buildings of the project Hari Sanskruti Phase I having MahaRERA Registration Number: P51600001194 being developed by KBC Global Limited. j I Sir, J I, Mr. Pavan Adke have undertaken an assignment of supervision of this real estate project. OUR RESPONSIBILITY I am responsible for carrying out the work in accordance with that with development permission and as per the approved plan and submit certificate of supervision of work and to carry out material testing in-situ or in authorised laboratory and to ensure quality of work & workmanship as per prescribed specifications, & as per NBC and/or other relevant code of practice. [1] INPUT MATERIALS, FIXTURES & FITTINGS I hereby certify that all Construction material, Fixtures and Fittings with regard to the flooring, Electrical, Sanitary Fittings, etc and amenities to be provided by the Promoter in the said project, building and the Apartment as are as per specifications mentioned in Annexure 'E', of Agreement to Sale. For those items, where no specification have been mentioned in Agreement of Sale, the Materials, Fixtures and Fittings used conform to the relevant BIS Standard/ IS/ National Building Codes or as per Industry Standards. [2] WORKMANSHIP 1 out unde r our supe rvisi on. I furth er here by certi fy that the work has been carri ed th facto ry and up to the mark and the work has certify at work man ship and qual ity is satis s of devi ation as per relev ant code of been acce ptab le with in the perm issib le limit pract ice. I [3] STRUCTURAL ENGINEER Mr. Sanj eev Patel havi ng Licenses no Prom oter s has enga ged struc tural engi neer Complex, near Dwarka Hotel, Nashik- 924889 date d 06.01.2021 havi ng office at Navr ang 422011, cell no 9823 1915 90. ct has been done unde r his supervision. The struc tural desig n of build ings in this Proje been done as per IS 1026 2:20 09 or as per The form work and conc rete mix desig n has checks and certificates for STABILITY othe r relev ant code s as appli cable . His periodic and SAFETY have been kept on record. [5] PRESERVATION OF RECORDS prop erly kept in the presc ribed Reco rd of all test resu lts of this Project have been Defect Liability Period or for the perio d as form at and will be pres erve d at least up to the requ ired by any othe r prov ision of Law. or any othe r item of work which were not Plea se spec ify devi ation in qual ity of mate rials in Agreement of Sale. conf ormi ng to the specifications as ment ione d Yours faithfully, Sign ature of Engineer (Site Supervisor) Name: Mr. Pavan Adke Qualification: License No (if any): MobiJe No: 9860 8208 23 Place: Nashik Sign atur Name: N e al Karda Date: