SHRIDHAR PUJARI Consulting Civil Engineer l\'1ail Id: shridharpujari1967@gn1aiLcon1 FORM-2 ENGINEER'S CERTIFICATE Date: 30/09/2024 To KBC Global Limited 2nd floor, Gulmohar status, Above Business Bank, Samarth Nagar, Nashik-422005. Subject: Certificate of Cost Incurred for Development of Work of 2 Buildings (Building E, Building D) of the Project Hari Sanskruti Phase I having MAHARERA Registration Number: P51600001194 being developed by KBC Global Limited. Sir, 1. I Mr. Shridhar Pujari have undertaken assignment of Certifying Estimated Cost Hari Sanskruti Phase I having MAHARERA Registration Number: P51600001194 (Only applicable after Project Registration) being developed by KBC Global Limited. 2. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate completion of internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Developers / Consultants. The Schedule of Items & Quantity required for the entire work as calculated by Shridhar Pujari Quantity Surveyor* appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site Inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under reference at Rs. 28,11,14,503 /- (Total of Table A & B) at the time of Registration. The estimated Total Cost of Project is with reference to the Civil, MEP & Allied Works SHRIDHAR PUJARI Consu lting Civil Engin eer l\1ail Id: shridharpujari1967@gn1aiL001n externa l works, comple tion of the apartm ents & propor tionate comple tion of interna l & the purpos e of as per the specifi cations mentio ned in the Agreem ent of Sale & for g(s) / Wing(s) obtaini ng Occupa tion Certifi cate/ Comple tion Certificate for the Buildin ity under / Layout / Plotted Develo pment from the NMC being the Plannin g Author whose jurisdi ction the aforesa id Project is being implem ented. /- (Total of Table 4. The Estima ted Cost incurre d till date is calcula tes to Rs. 24,94, 31,450 basis of input A & B). The Amoun t of Estima ted Cost Incurre d is calcula ted on the materi als / service s used & unit cost of these items. comple tion of 5. The Balanc e Cost of comple tion of the Civil, MEP & Allied Works for as per Apartm ents & propor tionate comple tion of interna l & externa l works, estimat ed at specifi cations mentio ned in Agreem ent of Sale, of the aforesa id Project is Rs. 3,16,8 3,053 /-. (Total of Table A & B). & propor tionate 6. I Certify that the cost of Civil, MEP & Allied Work for apartm ents of Sale, of interna l & externa l works, as per the specifications mentio ned in Agreem ent in Table A & the aforesa id Project as comple ted on the date of this certificate is as given B below: TABLE -A BUILDING E Particulars Amoun t (in Rs.) S. No. 1. Total Estimat ed Cost of Buildin g/ Wing/ Layout / Rs.14,05,57,251/- Plotted Develop ment as on date of Registra tion is 2. Cost incurred as on date of Certificate Rs.12,51, 74,198/ - 3. Work Done in Percentage (as Percentage of Estimated 89% Cost) 4. Balance Cost to be incurred ** ((based on Estimated Rs.1,53,83,053/- Cost) 5. Cost incurre d on Additional / Extra Items not included Nil in the Estimat ed Cost (Table-C) SHRIDHAR PUJARI Consulting Civil Engineer Mail Id: shridharpuja1il 967@g1nailcom TABLE-A BUILDING D S. No. Particulars Amount (in Rs.) 1. Total Estimated Cost of Building/ Wing/ Layout/ Rs.14,05,57,251/- Plotted Development as on date of Registration is 2. Cost incurred as on date of Certificate Rs.12,42,57,251/- 3. Work Done in Percentage (as Percentage of 88.4% Estimated Cost) 4. Balance Cost to be incurred ** ((based on Estimated Rs.1,63,00,000 /- Cost) 5. Cost incurred on Additional / Extra Items not Nil included in the Estimated Cost (Table-C) TABLE-B Internal & External Development Works in respect of Registered Phase S. No. Particulars Amount in Rs. 1. Total Estimated Cost of Internal & External Rs.1,96,78,015/- Development Works including amenities & facilities in the La out as on date of Re istration is 2. 3. Cost incurred as on date of Certificate Work Done in Percentage (as Percentage of Rs.75,78,015 - 38.5% I Estimated Cost 4. Balance Cost to be incurred ** ((based on Estimated Rs.1,21,00,000 /- Cost 5. Cost incurred on Additional / Extra Items not Nil included in the Estimated Cost Table-C Yours faithfully, Signature & Name (IN BLO ETTERS) with Stamp of Engineer: MR. SHRIDHAR PUJARI Signa Name: Date: I L_