T . W renes l\ - -"t -^\ lv I I Arcfritzcts {, inuriot dcsittuts S.No. 395i 1, Tigrania Comer, Behind Kandlan [4otors, Mumbai - Agra Highway, Dwarka, Nashik - 122 011. FORM-1 ARCHITECT CERTIFICATE Date:20/tLl?Ola To. M.K REALITIES, Mr.Avinash OmDrakash Yadav Flat No.B-3,Rajlakhmi Society, Deshmukh Bhavan Near Durgamata Mandir,Jali Road, Nashik Rd. Nashil- 422101 Subiect: certificate of Percentage of Completion of Construction Work ofARYA Appt " apartment situated on the Plot bearing S.llo.-$/{2)3,final Plot No. - 07 demarcated by its boundaries (latitude and longitude of the endpoints) Adjoining Plot.No.o1 to the North, Adioining Plot o.24 to the South, Adloining plot no.qt to the East, Adioining 7.50 lylt. Road, & Plot No.06 to the west, of Division Nshik, Village-Dasak shiwar, Taluka-Nashik, District-llashilq PIN 422 m8, admeasuring 418.75 sq.mts. area being developed by M.K REALITIES Propriter-Mr.Avinash Omprakash Yadav. Sir, | , Kunal N. Sanyashiv have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the ARYA Appt" Euilding situated on the plot bearing S.No.- 8l(2l3,tinal Plot No. - 07 , of Division Nshik Village-Dasak shiwar, Taluka-Nashik, District-Nashik, PIN 422008, admeasuring 418.75 sq.mtr area b€ing developed by M.K REALITIES Propriter- Mr.Avinash Omorakash Yadav- 1. Following technical professionals are appointed by Promoter:- (t) Mr. Kunal N.Sanyashiv As Architect; (rl) Mr. sunil H. Patel As Structural Consultant (iiil As Quantity Surveyor Based on Site Inspection, with respect to the Building of the aforesaid Project , I certify that as on the date of this certificate, the Percentage of Work done for the building Project as registered vtde number under MahaREM is as per table A herein below' The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table RI/S' Ge;resis crcr'itcats & lntc':cr deslii''..+15 ir:rine, Ashok H. Senghani 9421506633 ;ittv ashoks€nghani@gmail.com p.si'ril-cAi ioaT/ 1E4(5 TABLE.A Sr. No. Tasks /Activity Perc€ntage of work done (1) (21 (31 1. Exc:vation t0O/o 2. One number Plinth 70o}6 3. Number of Podiums N.A 4. Stilt Floor One lOVo 5. 4 numb€r of Slabs of Super Structure 2s% 6. Internal Walls, Intemal Plaster, Floorings within o% Flats, Doors and Windows to each ofthe Flat 7. Sanitary Fittings within the Flats, o% Electrical Fittings within the Flats. 8. Staircases, Lifts Wells and Lobbies at each Floor 50% level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9. The external plumbing and external plaster, o./" Elevation, completion of terraces with waterproofing of the Building. 10. lnstallation of lifts, water pumps, o% Electrical fittings to Common Areas, Finishing to the entrance lobby/s, plinth protection, paving of area as appurtenant to Building, Compound Wall and all other requirements as may be required to obtain the Occupation /Completion certifi cate. TABLE-B Internal and External Development Works in respect of the entire Registered Phase. S,No. Crmmon areas Proposed Percentage of Details and Facilitiet (Yes/No) Work done Amenities (1) (2) (3) {4) (s) 1. Internal Roads &Foot paths. No N.A N.A 2. Water Supply Yes o% 3. Sewarage (chamber, Yes 0% lines, Septic Tank). 4. Storm Water Drains 0% 5. Landscaping& Tree Planting. Yes 0v" 6. Street lighting No N.A N.A 7. Community Buildings No N.A N.A 8. Treatment and disposal No N.A N.A of sewage and sullage water- S.No, Common areas Proposed Percentage of Details andFacilities, (Yes/No) work done Amenities (1) (21 (31 (4) (sl 9. Solid waste N.A N.A management & disposal. 10. Water conservation, 2s% In Progress Rain water harvesting. 11. Energy management No N.A N.A 12. Fire protection and No N.A N.A fi re safety requirements 13. Electrical meter room, o% 14. Others (Option to Add more}. Yours Faithfully, *.n,,Y/,*'9'?'ti il?'** t\ r\ 1SA PAitNC, KUN.'.!-. ilo\{1j#ttt *E'"i: Aliildii."'i"