May 27, 2023 [DESIGN CONCEPTS] Architectural Consultants, Engineers, Interior& Landscape Designer KulswaminiNiwas Dastagir Baba Road Lam Road, Deolali Camp Email -Vasudeopagare@ Gmail.Com Mob.8806282605 ARCHITECTS CERTIFICATE Date: 27/05/2023 To, Mr. Paras Rajesh Rohra, (Project: Royal Residency) Tirath Niwas, Block A-21, Room No 124 & 125, Near Dunichand Kalani College, Next to Sai Baba Mandir, Ulbas Nagar, Thane Subject: Certificate of Percentage of Completion of Construction Work of ROYAL RESIDENCY having MahaRERA Registration Number P51600018958 being Developed by PARAS RAJESH ROHRA. Sir, I_ MR. VASUDEO M. PAGARE_ have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of ROYAL RESIDENCY having MahaRERA Registration Number P51600018958 being Developed by PARAS RAJESH ROHRA. Based on the Site Inspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in TableB. May 27, 2023 [DESIGN CONCEPTS] Architectural Consultants, Engineers, Interior& Landscape Designer Kulswamini Niwas Dastagir Baba Road Lam Road, Deolali Camp Email -Vasudeopagare@ Gmail.Com Mob.8806282605 TABLE-A ROYAL RESIDENCY Tasks / Activity Percentage of Actual Work No. Done (Ason date of the Certificate) (1 (2 (3) 1. Excavation 100% 2 Basements (if any) NA 3. Podiums (if any) NA 4 Plinth 100% 5 Stilt Floor 100% 6 Slab of Super Structure 100% 7 Internal Walls, Internal Plaster, Floorings, 100% Doors, windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises 100% 9. Staircases, Wells & Lobbies at each Floor Level 100% Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, 100% Elevation, Completion of Terraces, with waterproofing of the Building / Wing 11. Water Pumps, Fire Fighting Fittings and 100% equipment as per CFO NOC, Electrical Fittings, Mechanical equipment, Compliance to conditions of Environment CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity 27/05/2023 Date: Rajesh Paras Rohra AgreedLicensefaithfully, Yours Signature 14. 13. 12. 11. 10. 9. 3. 2. VIGHNHAR No. GANESH Common 7 6 5 4. 1(1) S & (NMCB/R/2021/APL/00145) Number Receiving Station, Others accepted requirements Electrical Fire Harvesting Station Management EnergyWater Water DisposalSolid Treatment Sewage Community Buildings Drains Strom Water Sewerage Internal & Lighting Street (Chamber, Landscaping Septic Tank, Supply Water STP)Lines, Common Name Areas May Protection Waste (Option Architectural by: of Conservation and Roads Kulswamini 27, Meter Areas (Internal Email Land & 2023 Sullage Management & (2) to & & - Surveyor Disposal Tree & Vasudeopagare@ Consultants, Add Roomn, Fire Footpaths Facilities Niwas & [DESIGN more) Water Planting Safety External Dastagir / Sub- Architect Rain & of TABLE-B Engineers, NO NoNO No NoNo YES YES No YES YES YES CONCEPTS] No No Proposed Development Gmail.ComBaba (Yes / (3) NO) Road Arch; Interior& NA NA NANA NA Lam NA NANA 100%100% NA100%100%100% As Vasudeo No.-305400Pagare Reg. NMC Engg. M. Percentage Road, Mob.8806282605 Landscape on actualof Works) Supervisor dateWork Done Deolali (4) of in Designer Camp Certificate) respect Consuitant of SHREE NA NANA NA NA Completed Completed NA Completed Completed NANA Completed Details (5)