Sunil H.Patel CONSULTING CIV]I- ENGINEER, l,Prayag,Dhongade mala, Near Raj laxmi Hall,Datta Mandir Road,Nashik Road, Nashik-4221 0l . Date-2711 1 12018 FORM-2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of ongoing Project and for withdrawal of Money from Designated Account- Project wise) To, M.K. BUILDERS, Through-Mr. Omprakash Yadav Shop- No.08,Raj lakshmi Society, Deshmukh Bhavan Near Durgamata Mandir,Jali Road, Nashik Rd Nashik- 4221 0l Subject: certificate of cost Incurred for Development of Residential Building of the Project .RUTURAJ Appt " apartment situated on the Plot bearing s.No.-91l2,final Plot No. - ll demarcated by its boundaries (latitude and longitude of the endpoints) Adjoining 9-fi) Mt.RoadtotheNorth,Adjoiningg.00Mt.RoadtotheSouth,Adjoining18.00MtD.P road to the East, Adjoining Plot No. 10 to the west, of Division Nshik, Village-Panchak shiwar, Taluka-Nashik, District-Nashih PIN 422 008, admeasuring 426.60 sq.mts. alea being developed by, M.K Builders Propriter-Mr' Omprakash Yadav' Sir. IsunilPatelhaveundertakenassignmentofcertifyingEstimatedCostfortheSubjectReal Estate Project proposedto be registered under MahaRERA' being One Building the "RUTURAJ Appt" Building situated on the plot bearing S'No'- 9ll2'final Plot No' - ll ' of Division Nshik' Village-Panchakshiwar.Taluka.NashikDistricl-Nashik.PIN422008.admeasuring426.60 Yadav' sq.mtr area being developed by M.K Builders Propriter- Mr' Omprakash 1. Following technical professionals are appointed by Owner / Promoter :- (i) Mr.Kunal N. Sanyashiv As Architect (ii) Mr.Sunil Patel As Structural Consultant (iii)Mr.Sandip fadhav as Quantity Surveyor + 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certifrcate, of the Civil, MEP and Allied works, of the Building of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Mr.Sandip Jadhav quantity Surveyor* appointed by Developer/Engineer, and the assumption ofthe cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building of the aforesaid project under reference as Rs 1,15,25,600/- The estimated Total Cost of project is with reference to the civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building from the Nasik Municipal corporation, Nasik, Maharashtra being the Planning Authority under whose jurisdiction the aforesaid project is being irnplemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 4924,500/-(Total of Table A and B) The amount of Estimated cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of completion of the civil, MEP and Allied works of the Building(s) of i the subject project to obtain Occupation Certificate Completion Certificate from Nasik MunicipalCorporation,Nasik,MaharashtrabeingtheplanningAuthorityisestimatedat Rs 66,01,100/- ( Total ofTable A and B)' Proiect as 6. I certifu that the cost of the civil, MEP and allied work for the aforesaid completed on the date of this certificate is as given in Table A and B below : BUILDING : "RUTURAJ Appt" Table A Sr No Particulars Amounts Total Estimated cost ofthe building/wing as on 27-l I -201 8 date of l Resistration is l,l 1,20,300 Cost incurred as on 27-l I -2018 2 48,83,970 (based on the Estimated cost ) 3 Work done in Percentage (as Percentage ofthe estimated cost ) 43.92% Balance Cost to be Incurred 4 62,36,330 (Based on Estimated Cost) Incurred on Additional /Extra Items as on 21-11-2018 not included in 5 NIL the Estimated Cost (Annexure A) Table B Sr No Particulars Amounts Total Estimated cost of the Intemal and External Development Works I on including amenities and Facilities in the layout as 2'l-11-201& 4,05,300 date of Resistration is Cost incured as on 27-l l-2018 40,530 2 (based on the Estimated cost ) 3 Work done in Percentage (as Percentage ofthe estimated cost ) 1IYo Balance Cost to be lncurred 3,64,770 4 (Based on Estimated Cost) Cost Incurred on Additional /Extra ltems as on 27-l l-2018 not included NIL 5 in the Estimated Cost (Annexure A) 1) STRUCTUML CONSUTTANT NAME- MT'SUNIL H' PATEL. 2) PAN CARD - BHWPP6102J 3)AADHAR CARD -7796227 4t369 4)CONTACT NO - 9823059201 YOUR,S FAITHFU LLY ' Reg.No.-l35 ( N.M.C.)