FORM 1[see Regulation 31 ARCHITECT'S CERTIFICATE (To be submitted a t the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date : 7-01 AYG Realty Pvt Ltd, 1, Rajkamal, Opp University campus, Kalina, Mumbai - 4.00098 Subject: Certificate of Percentage of Completion of Construction Work of two No, of Buildings of the third Phase of the Project [MahaRERA Registration Number] situated on the Plot bearing Survey no. 5111 to 51/76, A, demarcated by its boundaries S. No. 5 2 , 1 7 0 , 5 1 & H. No. 2A to the North S. No. 147/8/5, S.N. 4 9 H. No. 016 to the South National Highway No.17 to the East S.No. 52/4,5,9,11& 1 2 & S.N. 147 H. No. 3 & 1 2 to the West of Division Konkan village Lonere Taluka Mangaon District Raigad PIN 4 0 2 1 0 4 admeasuring 2533.78 sq. mts. area being developed by AYG Realty Pvt Ltd Sir, I Preeti Joshi have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion cf Construction Worlc of the two No. of Buildings of the third Phase of the Project [MahaRERA Registration Number] situated on the Plot bearing Survey no. 5111 to 51/76, A, demarcated by its boundaries S. No. 52,170,51& H. No. 2A to the North S. No. 147/8/5, S.N. 49 H. No. 016 to the South National Highway No.17 to the East S.No. 52/4,5,9,11 & 12 & S N . 147 H. No. 3 & 1 2 to the West of Division Konlcan village Lonere Taluka Mangaon District Raigad PIN 402104 admeasuring 2533.78 sq. mts. area being developed by AYG Realty Pvt Ltd. 1. Following technical professionals are appointed by Owner / Promoter:- (i) M/s/Shri/Smt Preeti Joshi as L.S. / Architect; (ii) M/s /Shri / Smt Manohar Ahstawadhani as Structural Consultant (iv) M/s /Shri / Smt Harlsh Mehta as Site Engineer Based on Site Inspection, with respect to each of the BuildingIWing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Worlc done for each of the building/Wing of the Real Estate Project as registered vide number under Maha RERA i: as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A hilding Number C2 Sr. Tasks /Activity Percentage No. of work done 1 Excavation 100 2 1number of Plinth 100 3 1 0 number of Podiums - 4 Stilt Floor 100 5 5 number of Slabs of Super Structure 0 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, 0 Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings 0 within the FlatlPremises 8 Staircases, Lifts Wells and Lojbies at each Floor level connecting 0 Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, 0 completion of terraces with waterproofing of the Building/Wing, 10 Installation of lifts, water pumps, Fire Fighting Fittings and 0 Equipment as per CFO N O C Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing tc entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all otke: requirements as may be required to Obtain Occupation /Com?letion Certificate -- - -- Table B .. . . .. .. ... . . .. . . - .. - . . .. . . ..BuildingNumb.er.B3 .. . .. . . . . - Sr, Tasks /Activity Percentage No. of work done 1 Excavation 0 2 1number of Plinth 0 3 0 number of Podiums - 4 1 Stilt Floor 0 5 1 5 number of Slabs of Super Structure 0 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, 0 Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Prenises, Electrical Fittings 0 within the FlatlPremises 8 Staircases, Lifts Wells and Lobbies a t each Floor level connecting 0 Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, 0 completion of terraces with waterproofing of the Buildinglwing, 10 Installation of lifts, water pumps, Fire Fighting Fittings and 0 Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to 0 btain Occupation /Completion Certificate . .. . .. .... . TABLE-B. ... .. ... . . ... . . . . . .. . . . .. . .. .. . .. . .. .. . Internal & External Development Works in Respect of the entire Registered phase S. No. Common areas and Proposed Percentage of Details Facilities, Amenities (YesjNo) Work done 1. Internal Roads & Footpaths Yes 12mtr & 9mtr 0% road. 2. Water Supply Yes Works includes One underground water tank & 0% G.l.line from tank t o building's over head water tank. 3. Sewerage (chamber, lines, Yes 0% Septic Tank, STP) 4. Storm Water Drains Yes Works includes desposal of 0% sewage from septic tank to soupit. 5. Landscaping & Tree Planting Yes 0% 6. Street Lighting Yes 0% 7. Community Buildings Yes 0% 8. Treatment and disposal of Yes 0% sewage and sullage water 9. Solid Waste management & Yes 0% Disposal 10. Water conservation, Rain Yes 0% water harvesting 11. Energy management Yes 0% 12. Fire protection and fire safety Yes 0% requirements 13. Electrical meter room, sub- Yes 0% station, receiving station 14. Swimming Pool and Club Yes 0% house Yours ~ a i t h f u l l ~ , Rseti *maha S. ~oshi a d InteHor DaCnar PREETIJOSH1 (CN2000/26818) Signature & Name (IN BLOCK LETTERS) of L.S/ Architect (License NO .~~l22S?0l.2id.8!.8....]