MAN!SH SHAH :cxrrrcl r Pi.r€cr tohtulrANl F.RM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE Date: O6.L2.2O25 To, M/s Geetaspans Realtors Rrt. Ltd. SH-02, A & B Commercial, Janki Heritage, 150 Feet Road, Near Reena Mehta College, Near Over Bridge, BhaYander (West), Dist- Thane MH- 401101. SubJect: Certiflcate of Percentage of Completion of Construction Work of ,.AnJani Shikhar" havlng MahaRERA Registratlon Number prrt' P$[8OOOS 476L being developed by M/s Geetaspans Realtors Ltd' Slr, I, Mr. Manish M. shah have undertaken assignment as Architect (AnJani of certifying Percentage of completion of construction work of the Shllrhar" Approved u/no P-893 1 I 2021 / (68 1 ) /R / C W ard I FP I 337 I 3/Amend dated o4.og.2o25 and Approved FCC u/no. P-893ll2}2llFgl)lRlc ward/FP/FCC/1/Amend dated og.lo.2o25 for building comprising of 2 level Basement + ground + 1st to 20th upper floors having MahaRERA Registration Number p51gooo5476l being developed by M/s Geetaspans Realtors hrt. Ltd. Based on site Inspection, with respect to Layout/ each of the Building/wing of this of the aforesaid Real Estate Project, I certify that as on the date of the certificate, the percentage of Work done for each of the building/Wing Real Estate Project under MahaRERA is as per Table A herein below' The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B' TABLE. A Project - "AnJani Shikhar" Percentage ofActual Tasks /ActivitY rrork done (21 (as on 30.09.2025) (3) Excavation {oo 066' | ff o.hdhmonirhogrnail'com p wtng . B, r rol, w.rrarn ldgo ll. wo.tGrn frprar. Highvoy. Borivcli lGait), Muttboi ' \+9l?2287o55997+9t22287ooocplR.No.:CA83ll6.66l|sINo.'27/\coP5995o*'.ory mir{i :: 2. Basements (if any) too% 3. Podiums (if any) NA 4. Plinth IOOo/o 5. Stilt part Ground Floor too% 6. Slabs of Super Structure 6Oo/o Internal walls, Internal Plaster, Floorings, 7. 4Oo/o Doors and Windows within Flat/Premises 8. Sanitary Fittings within Flat/Premises o% Staircases, Lift Wells and Lobbies at each 9. Floor Level, Overhead and Underground Water Oo/o Tanks External Plumbing and External Plaster, 10. Elevation, Completion of Terraces with Oo/o Waterproofing of the Building/Wing Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment, compliance to conditions of Environment/CRZ NOC, Finishing to Entrance 11. Lobby/s, Plinth Protection, Paving of Areas Oo/o appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in Agreement for Sale. Any other activities. TABLE. B common Areas (Internal & External Developments worksf in respect of the Registered phase/ proJect Number Propos Percentage of Sr.N Common Areas & ed Actual Work o. F'acilities (Yes/N Done Details (1) (2) (as on (s) of (3) 30.O9.2025) (41 1 Internal Roads & No Footpaths NA Yes Oo/o As per P Form 2. Water Supply from HE dept. before issue of q Q wi'g - B' I lol' wsriorn Edgo ll, wctlo.n Irprcar Hrghwoy, Borivulr {Eortf, r{umboi - 1oa(,66, I 13 orrhohnrooirh(4]9rnoil,