PROFORMA -B 9 /35 CONTENTS OF SHEET W. CH 5TH PODIUM FLOOR PLAN, LINE AREA DIAGRAM & AREA CALCULATION. 1.85 AJJA 2.9 0 1 BED 2 MT. R 3.65 OOM 1.8 2.90 0.45 5 X 4.2 A E 1.08 8 M.B ED 3.65 ROOM X 5.5 50% 300X75MM AL BEAM VO & 50% ID CHAJ JA TOIL 8 TOILET- LINE AREA DIAGRAM S.S. ET AJJA 1.53 FINS MS RAILING X 2.45 1.63 MT. W. CH (FOR WING-1& 6) X 1.7 2 1.93 SCALE - 1:200 B MS RAILING 0.75M T WID X 1.5 3 1.63 X 0.9 0 W.I.W 1.53 . 0.45 E PL X 3.05 S X 0.15 ANTE 1.65 S R BE D DE 7.48 CK TOIL E 1.83 T S S X 1.6 LIVIN G/ D X 2.75 JA CHAJ 50% 31 S 8 VO & 50% ID RO INING BEAM TOILET BUILT UP AREA CALCULATION 32 2.00 S.S.0.12 7.48 OM TW S 30 33 S X 5.4 1 2.90 X 1.85 X 1 NO = 5.37 SQ.MT. TW 50 34 S 8 BED R 4.08 OOM . CH TW TW 49 29 35 S X 3.6 AJJA S T. W 48 5 2 1.85 X 2.90 X 1 NO = 5.37 SQ.MT. TW TW 46 47 B B 36 37 0.45 M B B 1.83 TW 45 BEAM 50% VO 50% ID & TW 31 38 W.C . TOTAL ADDITION = 10.74 SQ.MT. X B TOILE S.S. JA 1.53 TOIL TW 44 CHAJ TOIL X 1.83 ET 1.55 T-04 TW 43 32 X 1.2 2 1.53 ET 1.53 X 2.45 B 50% AJJA B X 2.45 42 30 33 VO 50% ID & BEAM 6.60 SQ.MT. B TW CH DRIVER TOILET (B) = AJJA TOILE S.S. 41 B 1.55 T-04 TW T. W 1.08 TOTAL TOILET (A-B) = 4.14 SQ.MT. TW 40 34 X 1.2 2 . CH BED PAS S KITC 5.33 AGE 2.75 HEN MS RAILING TW TW 38 39 29 35 B BEAM 0.45 M R 3.35 OOM X 1.5 X 3.6 B X 4.2 3 5 @M TW 37 ID-L ANDI UTIL TW TW 36 36 NG LEVE L 8 2.23 ITY X 1.45 35 FRD TW TW 33 34 37 FOY 2.58 ER 1.00 1.93 X S FRD 0.75MT W TW TW VOID 38 X 1.20 STO IDE PLAN 32 50% CHAJ 1.98 RE S 31 50% TER BED TW VOID JA W.C 0.98 . S.S. TW 30 LIF 3 X X 1.5 2.30 T TW 29 50% & 1.83 S ANTER BED TW 3 ID & 28 S.S. TW S MT WIDE PL X 2.8 50% 27 19 0.75 TW TW TW 25 26 0 VO 0.45 MT. WID S E CH 20 TW 24 EVA FIRE 40 X AJJA 50% S TW 0.30 VO TW TW 22 23 CHAJ CU A BEAM 2. 50% ID & 21 S JA S.S. TW TW TW 21 0 T LIF ION @M ID-L S ANDI TW TW TW TW TW TW TW TW 19 20 50% LIFT 2.78 T NG 22 TW TW 39 VO SMO LEVE TW TW TW S S 17 18 50% ID & CHE KE L X 2.48 BED S X 2.8 23 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 VOID B S.S. 2.30 LOB K 2.78 BY C 0.45 W. C MT. HAJJ R 3.83 OOM 18 24 347 X 2.30 A MS R X 3.3 TOIL B 25 B 5 2.45 ET AI 26 346 39 FRD 1.00 LING MT H X 1.53 27 LOBB 2.01 M.B B B S 28 348 S Y T ED E CH E B B SERV 9.85 X 2.5 2 ELE 2.00 0.28 50% 0.45 MT. 1.00 3.65 ROOM X 4.5 AJJA 17 B 19 B B 345 B IC 4.45 E LIFT 2.00 VO 50% ID & W. CHA 1.20 AC 0.6 M UNITS-2 1.00 CHAJ JA TOIL E 0.90 1.10 X 1. 78 8 WID B X 1. 20 2.45 T BELOW JJA 05 X 2.8 S.S. A S 2.48 50% CHAJJA CHAJJ FOR AC 0.6 M UNITS- BELOW 1 X FOY B VOID CHAJJA FOR 1.53 MT. RAM 0 & 1.68 ER X 0.60 18 21 50% S.S. B 40 X 1.08 P UTIL TOIL 0.45 B B VOID 1.68 E 16 22 VOID W 1.58 .C. 1.53 Y IT 1.53 T X B X PASS 2.50 B B 1.85 CHAJ B 23 FHC UP X 1.07 3.68 AGE JA 50% VO G-1 W.C S 24 344 40 2.00 CHAJ JA 1.88 . 1.53 X X 1.05 50% ID & S.S. BEAM 17 25 26 S 148 S FRD LOB DN BED AJJA 2.60 BY STORE ROOM 15 27 28 150 AY X 8.8 STO 2.58 RE KITC R 3.35 OOM E CH B X 1.68 X 4.2 1.08 5 3.35 HEN B WIN FRD X 3.35 FRD 6M W X 2.45 7 MT. S ALL 343 16 STORE ROOM OR TS H S 41 LOBB 2.60 Y FRD WID / SP IDE D 0.45 14 B L B X 6.3 FRD 4 BAL 2 DN 2.00 FOY KET S 1.50 E 15 1.23 R FOY LIV ELV. FHC BAS & DINING UP RIVE VOID B 41 FRD X E 1.23 R S 1.50 SQUASH COURT 1.50 0.60 342 S 5 3.78 X 3.65 ING DE 13 1.50 1.20 W. CH MT. FRD 3.78 X 7.3 3 3.65 CK W 16.30 x 11.65 SERV 50% AJJA S B 1.50 0.60 1.50 3.30 VO & 50% ID S.S. 2.00 2.48 4.45 ICE L IFT X 1.53 STO 14 IVE 149 S X 2.8 2.58 RE D 12 WA 272 273 148 42 0.27 2.00 0 X 1.68 KITC BE B Y B 3.30 B ELV 3.35 HEN X 2.45 LIV & DINING STAMP AND DATE OF RECEIPT OF PLAN 1.99 LOBB ER S Y W 3.65 ING 13 9.85 1.58 .C. X 7.3 DR B UP ID 271 155 1.50 FHC X 2.5 2 X 1.07 3 DE 3.65 CK EP 274 LIFT B 11 WI B 1.08 X 1.53 LA B S B 275 UP B 50% JACHAJ UTIL X 3.35 276 X 2.8 50% IT B VO VOID 1.53 Y BEAM NT DE 1.51 0 50% ID & B @M 50% & S 12 VOID FRD 2.55 ID-L ANDI NG LEVE 2.30 S.S. S.S. 1.85 X JA B L CHAJ 1.87 EL 5M 6M E. LIFT LOBBY 1.20 W.C 1.88 . ELV. VOID 341 43 A FRD 1.56 X TW ELV. AC 10 BED 0.6 M UNITS- BELOW 2 FOR 1.53 MS RAILING 0.7 S B EL E. 0 1.5 1.87 0.93 0.93 1.56 B LIF 2.30 T 1.00 CHAJJ AC 0.6 M UNITS- BELOW 1 CHAJJ A FOR 50% VOID PASS AGE R 3.35 OOM WID E CH 340 3.68 X 4.2 B AJJA 1.00 & X 1.05 X 2.8 11 EL E. 0 2.0 FR D 1.56 LIFT LOBBY 2.68 2M WIDE PASSAGE 2.50 LIFT 2.05 43 0 MS R CHAJ JA 50% S.S. TOIL E 2.45 T 7 9 1.56 T LIFT 2.10 X S B UP 2.45 AI X 1.00 LING P. SHAF 2.05 1.53 MT. B ELE. 1.5 0 2.10 X VOID 339 44 B MT H T FOY 1.68 ER X 0.60 0.45 FILE NO. 1.5 0.90 S 1 VOID X 1.08 TOIL 10 0.7 P. SHAFT 2.50 X 1. 05 1.68 E 1.53 T B ELV. BEAM X 5 FH C 270 LIFT 2.10 X 2.05 LIFT 2.45 VOID 338 44 49 @M ID-L ANDI 2.50 JA CHAJ 50% 8 1.5 0 2.10 X 2.05 S B PLAN NG LEVE 1.10 VOID & P-17708/2023/(124 AND OTHER)/R/S WARD/AKURLI-R/S B BED L X 1. 50% 300X75MM AL B 86 ELV. 45 TER 78 S.S. BEAM S R FH MS RA B 3.83 OOM P.SHAFT P.SHAFT P.SHAFT P.SHAFT C VOID B ILING FINS S 9 EL E. 6M 337 PER AS X 3.3 269 VOID DETA IL 5 M.B B TOIL S WI ED AJJA 7 154 336 2.45 ET X 1.53 3.65 ROOM DE S B B E CH S B 243 268 45 42 S BEAM ALUM 2.40 X 4.5 8 NOTE:- DR S MT. INIUM X 0.30 75 X FIN 0.45 8 B B IVE 335 46 B 30 50X1 MT. WID WID 1) ALL DIMENSIONS ARE IN METER. B 25 AL FIN E CH AJJA B S 6 WA 334 50% VOID 0.45 2) THIS PLAN IS DIGITALLY SIGNED AND PHYSICAL SIGN NOT REQUIRED 245 B 50% & CHAJ B 242 S.S. S JA Y 153 Y S 50 B 3) THIS CANCELS THE EARLIER APPROVAL ONLINE ISSUED UNDER NO P-17708/2023/(124 AND B 267 EWA S 333 7 244 B 246 B B 332 RIV 47 B 46 OTHER)/R/S WARD/AKURLI-R/S DATED -24.02.2025 5 B B S B IDE D S 266 152 B 331 6M W 51 4) THIS DRAWING SHALL BE READ IN CONJUNCTION WITH LETTER ISSUED UNDER NO 6 B PLAN B S B MS RA B TER 247 B 330 FHC 47 ILING P-17708/2023/(124 AND OTHER)/R/S WARD/AKURLI-R/S. ON EVEN DATED B AS B PER 48 B 151 DETA 4 300 B IL S B B 265 B B 328 329 147 B 5 Y 241 B 248 B 264 277 B 301 B 306 326 327 146 325 S 48 3 DR 52 S B BEAM B B FHC 0.12 S IVE B B 249 B 263 278 B 302 B S 4 WA 178 240 305 B B 324 PLAN FOR APPROVAL 2 B B B 250 B 279 B 303 B S AY 53 B S 3 DE B 5M 239 262 308 IVEW WI ME WI B B R 1.6 P SH EL E.5 DE 238 EX OW 251 B 280 B B 145 B 323 MS RA PER ILING AS PLAN TE 1 6M 5 X AF DR HA C US 261 304 DETA B IL B T 307 S EL B 5.7 T B AY DE D E.3 IVE 2 0 0.2 1.5 0 FH C WA 252 B 260 281 B 129 310 319 1.5 0 B IVEW R 54 ALUM SANTOSH B B 0.4 5 5M SE FR Y 237 S 322 B 75 X INIUM FIN Digitally signed by SANTOSH B RV UTTAMR UP ROHIT 50 Digitally signed by IC D UP X12 320 T. ES B B 0 300 UTTAMRAO RAUT B VC 5 LA 1.5 1.5 2.2 253 B 60 6M W W 282 A B FIN 0 ID E S DN 311 5 B ROHIT Date: 2025.08.18 16:25:50 1 B309 A 259 DE D CH 128 B I PANKAJKUMA Digitally signed by AJ +05'30' B S SURESHCHA SURESHCHANDRA M 177 AO RAUT 1.5 236 B 2.2 DN JA .B 5 6M R 4.2 ED 0 B PANKAJKUMAR 1.6 55 B T 283 0.4 1.2 OILE 7 x RO UP CL 254 B B 5M 2 X T-1 5 S 3.2 OM 312 WI FR 49 R LILACHAND LILACHAND JADHAV NDRA SONAR 1.5 D L UB CH T. 258 5 127 B FO AJJ W 0 0.6 UN R A A T B 1.2 OILE IT C DE M S- ID 176 BEL 1 2.5 IFT 6M W 61 E OW 2 X T-2 FH 235 CH B B B Date: 2025.08.14 Date: 2025.08.18 FO AJJ 1.5 B C CH 0.6 UNITR A A 5 130 1.6 JADHAV CL B BE T M S- C DR B SONAR AJ 1.5 OIL BEL 2 0X 255 284 5 I 3.6 DR OW JA 5 x OO 2 x ET 2.1 L UB 87 313 EL V 17:39:47 +05'30' 14:09:57 +05'30' 2.5 S IVE . B B 1.0 0 3.0 M 2.5 IFT 0 0.8 0 X 175 EL 122 234 B 5 CH S AJJ 131 WA V. 56 B 3 0X B A EL 1.2 DEC PA 1.0 SS T 1.5 OIL 2.1 E. 256 S 285 314 Y 321 62 50 B B 0 87 S B 7x K . B B 1.5 0 x B179 3.2 2 x ET 1.0 7 EL 0 2.4 0 174 E. 233 B 132 S.E.(B.P)R-2 A.E.(B.P) R- S E.E.(B.P.)WS-II 'R-1' 5 BE B CH 1.0 AM 286 AJJ T S 0 SHAF LI 2.9 2 A @ M 257 88 315 51 S LE ID-L X 57 B B180 VI 0.9 N 5.6 G & 2 U 1.8 TIL VE A L ND IN B123 173 232 B S 63 S B B 2 X IT G 133 B B 1.2 5x D Y 1.2 DEC 1.0 0 7x K 3.2 3.2 ININ 0 G 5 80 6M S 89 316 S K 126 B B 0 2.2 ITC LI VI 7X H E 3.0 N S WI 172 B181 231 S 134 52 53 B S N S S 5 DE JA AJ 5.6 G & CH 5x D 317 59 T. W ID E BE 3.2 ININ 0 G 2.7 2X 3.0 LIF RA M PU 124 DR IVE 171 B B182 230 B 90 125 S S 135 58 3.6 DR 0X T B B B 64 5M S B 1.2 P 0.4 5 x OO 2 F 2.4 79 WA B318 B S 2.7 .R B 124 3.0 M B183 91 2 .D 5 B B X . 170 S 5 S 1.2 Y C 08 229 FO HAJJ 2.9 0.6 UN R A A 2 136 T JA 2 B M ITS- C SHAF B125 X S BEL 1 AJ PA F.R 3.0 LIF 287 OW C 1.0 SS 0.9 FO HAJJ CH 1.5 0 x . 2 0.6 UNITR A A M S- C .D . 0X T 7M 92 S BEL 2 E 07 FR 123 143 B B OW ID B184 7 K 2.4 S D 2.2 ITC 169 WI S W T. M 1.0 0.8 0 X 7 X HE 5 228 137 B 5M .B 3.0 N 0.4 4.2 ED 7 x RO 3 T 1.5 OIL 2 x ET 5 CH AJ CH 78 DE S 288 6M L. G LV NDIN AJ 142 D-LA S 2.4 Ra 2-WA AT MI JA 3.2 OM SE 122 B B185 93 WI JA BEAM S S 5 S R 5.23 B U 1.8 TIL 65 A 0 4.7 VIC 168 227 AJJ RAMP DE S CH 2 X IT 1.0 Y 3X EL tio B 1 : Y RA 289 B EV AC FIR 2.4 IFT 126 S T 5 VOID 1.5 OIL DR 0 U E 1.5 5 94 B 121 2 x ET B186 2.8 LI AT 2.6 PA B 54 2.5 5 X FT ION 167 8 MP S IVE 1.0 5 0 0 X SS. 226 2.9 B A 0 2.3 JJA FRD 138 AJJ EL VOID B BE CH 0 S CHA S WA 1.0 E 5.1 127 AM 0 290 S @ 0 SM M 1.2 CH OC C FO HAJJ 5 IDE LE ID-L 95 120 Y JJA B B 0.6 UNITR A A UP B187 E K MT. T. W 2.8 LOB CK VE A 166 C M S 0.45 CH AJJA IDE W BE -1 M. L ND 225 BELO CH B LO CHAJ W. IN 5 X BY C FO HAJJ W EL 0.45 JA 3 2.40 W A M 0.45 B CH X 0.30 VOID LIF 0 M 1.20 2.2 0.6 UNITR A A 139 G V CHAJ .W. 2.0 & 291 2.33 T S S- C S AJ M 0 S.S. 0 128 JA BE 2 0.3 L. LO G LV 50% 50% CH W P JA NDIN MID- 25 ASS PL X 2.8 LA B B188 BEAM A 66 0 B 2.0 AT .55 JJ DN 0 .S BED 2.0 M A FH .47 A 3 FH 0 165 224 1.6 HA B B R T. C 4.4 0 2.00 X GE 3.83 OOM FT C 121 140 2.00 B S W 2.5 ELV CH E ID 5X MS 1.0 RAIL 0 M IN CH 2.0 0 2.0 0 DN 2.6 0 0.3 129 1.5 0 292 1.5 0 2.00 LOBB LIFT X 3.3 TOIL 2.45 ET 0.3 3.9 B 55 5 0 Y 1.5 B189 AJ TH G 2.4 JA 0 BE AJ 3 9.85 8 0 X 1.53 1.5 S EL 3.8 DR T 2 JA V 0 IN 164 223 6M 0 0.2 VOID X 2.5 X 2.8 VOID B 3 141 0 CH 0 X OO 0.9 2.0 G 0.5 5 S M.B B A 5M @ 2.4 M 120 1.6 2 2.35 ED 3 .3 M 0.9 2 7 UP 2.6 PA 2.0 JJA LE ID-L VE A 0 WI 293 2.2 5 1.5 2.48 ELV 3.73 ROOM AJJA 50 5 0 L ND 130 WI 1.5 P4 DE 0 119 WJAID 0 X SS. B 0 1.00 X 4.5 B190 % U 163 S 50 VOID CH 50 1.2 TIL EL AM 1.00 AJ BEE DE AJ E EL B 8 % % 1 7 X IT BE UP 0.93 LOC JA S.S & 50 VOID.20 1.20 WH 1.8 Y 2.0 5.1 B E. T DR TOIL X 1.05 CHAJJ . 2.4 OI % 0 5 TO UP FOR A CHAJJ 8 X 1.6 B T 5 2.9 AC FOR A % S.S. ET 5 S.S & 119 0.6 M UNITS-2 AC 5 X LET 0.6 M UNITS-1 2.4 OI 50% 2.45 SE DR BELOW 5 X LET . K EL UP 1.6 5 DN VOID BELOW MTCH. 0 X .91 1.5 CH 3.3 ITC R 4.7 VIC 131 E. 96 IVE 118 117 SERV 50% S.S. & & 50 X 1.53 2.85 B 67 1.5 B191 2 5 X HE FHC IVE P5 AJ 1.0 CH FH RAMP B VOID 3X EL IC TOIL J 2 P A F.R 06 DN 2.00 UTIL 0.45 2.4 N 162 WA B 4.49 E LIFT 1 1.6 .TO A C FRD W IT VOID E 1.53 T .D 2.4 IFT JJ 1.53 Y 1.58 .C 1 2 X ILE 5 . FH X .05 A B 118 WA B B P C X 1.87 PASS X 2.50 1.5 T 5 X 2.8 S 1.8 3.4 ASS S 50% 2 1.6 6 X AG 2 1 X .22 05 2.8 LIF 132 FR 97 Y 3 X 1.08 W.C 3.65 AGE X 1.05 CHAJ JA Y G-2 F.R . 56 B 8X B192 3.0 1.88 1.0 E 1 .D 0X T D 116 B BE 1.6 X .24 7 . X 1. 3.6 DR 7 3 3.3 5 1 X .22 2.2 C FO HAJJ 0.6 UNITR A A 161 222 FR D S FRD LOB 5 53 BED 0 B B B 2.60 BY AJJA 5 X OO 3.0 3.0 LIF R M S-1 C S 294 STO 3.40 OOM BE 7 LO S 4 .5 M 0X T C FO HAJJ W 117 2.58 RE 1.20 KITC 6 T 1.5 OI 0.6 UNITR A A S- C 2.4 133 98 115 X 8.8 W. CH MT. AJJA X 1.68 3.35 HEN 1.08 X 4.2 MTCH. AJ B M X 3.35 B193 BE 2 2 X LET 8 WJAID P6 WIN 160 LO BE K W 5 X 2.45 2.4 3.3 DR LI 3.3 ITC 221 BEELO B 1.20 CWH 0.4 5 VI 5 X HE 04 F.R W. C M. S 5 X OO LOB 5M N 2.4 N .D 116 P5 295 HAJJ 3 .6 G & B S 2.60 BY . A 4.2 M 3.0 LIF T. 5 68 W CH ID 5X D 0X T 2.7 99 AJ 8 B B B194 TO 114 0.45 E J CH AJ JA 50 % 50 VOID A 6.5 ININ 5 G U 2.4 5 CH FO AJJ 0.6 UNITR A A 7X 1.2 2 159 B VOID X 6.3 2 FRD 4 FOY ER LIV B % 0.4 1.2 TIL M S-1 C SERV & DINING 296 1.23 B134 7 X IT BE S CH S S.S & 5M B 1.8 Y IC LO 115 FO AJJ W X 3.77 4.48 E LIFT 0 LI 3.65 ING . T. 0.6 UNITR A A 57 1.7 5 W FRD VI 100 S- C 113 M B ID K BE 2 X 7.3 B195 BE E CH N 2.2 ITC LO W FRD 5 FOY 3.6 G & S X 2.8 3 AM 158 S 0.3 8 X HE FHC ER AJ 0 0 1.0 DE JA 1.23 3.0 N 3 B 5X D 1 3.80 CK X .24 3 X 3.77 6.5 ININ 5.8 S 5 B 297 3.3 CH 1 DN X 1.53 0 50 .20 5 P 114 AJ 1.0 MS 5 1.6 .TO G 101 J A % 2.00 3 . 6 D EC 2 X ILE 50 VOID 1.0 RAIL LI 0.7 STO B B196 % 0 M IN V UP 5X K 1.5 T S.S & U 3.2 DIN ING 5 157 2.58 RE S TH G 1.8 TIL 7M C . 0.7HAJJA B 1. 4 2 @ 0 X 1.68 T 5 X IT LOBB 5 1.2 0 X ING / X .97 CH KITC 69 3 M 1.0 Y 135 S 298 AJ LE ID-L 0 P 3.4 ASS T 2.4 OIL 5 X ET JA VE A L ND IN 8 5.6 5 3.2 7 CH AJJ A 50 % 5 0 VO B WI 102 AY B LIFT 3 9.85 Y X 2.5 3.35 HEN X 2.45 LIV & DINING B T DE B197 6 X AG 1.5 G 2.4 OI % ID B 2 3.65 ING 5 X LET S.S & X 2.8 156 B 1.0 E 2 2.48 W 6M AM 1.0 CH 3.6 DEC 84 1.58 .C. . AJJ IDE D 0 X 7.3 BE A 3 PA 1.5 Ra 2-WA 5X K VOID 2.35 S 2 299 2.00 X 1.08 3 DE S 1.0 2.1 SA 1.0 3.80 CK 1.4 BE G WI B CH 3 BE 0 1.0 8 X E AJJ 3 ELV 3.3 DR 0 A X .91 2.9 DE B 2 103 X 1.53 B198 S 2.00 DE tio 0 5 X OO 3.8 DR T 1.08 B 1.0 RIVE 5 X CK 1.1 1 : Y RA 2.5 OIL UTIL 4 .2 M 1.6 8X 1 0 X OO 3.3 M 1.2 BE 0 X ET 136 155 220 L.G LV 3 IT 1.53 Y X 3. 35 DR LIFT NDIN 2 8 1.6 3.0 DR 1.5 MID- X 1.87 S 2 LA AT 2.00 7 5 5 X OO B W BEAM X 2.8 0.5 8 MP 112 70 CHAJ B IVE 8 0.3 3.6 M S 1 0 JJA JA W.C X .05 0.4 104 0.3 8 S.S. 2.33 5M T. W ID E T 1.5 OI 1.8 2 2.5 5X ID CH E A 0.6 5 M .B 3.2 ED 0 X RO CH AJJ 0.7 5 8 0.5 5 0.28 0.2 @ IN G 77 WA 154 B B199 219 B B EVA FIRE CUA T FRD 1.20 AC 0.6 M UNITS- BELOW 1 CHAJJ A FOR AC 0.6 M UNITS- BELOW 2 CH FOR AJJA 50% 1.88 X 1.53 . BED R AJJA 3.40 OOM 2 X LET LIF ION W T A CH 0M PASS S T 3.3 OM 2.5 OIL M VOID 111 1.00 T. 1.8 AJ B 2.4 OI JA 2.4 5 X LET 5M T. W 3 0 X ET 5 LE ID-L VE A S Y 59 FRD 2.83 T SMO 1.00 & 3.65 AGE X 4.2 E CH 105 6M W 5 0.5 ID 1.5 L ND X 2.50 CHE E K VOID X 1.05 B 1.5 E B200 8 50% 3 137 S LOB CK TOIL T. W B CH B 0.7 M CH 2 BE ET AJ AJ 3.0 5 153 218 2.83 BY ID 0 2.45 71 A CHAJ 0.3 1.7 J JA CH 1.1 0 A 0X AJJ 0.7 X 2.30 X 1.53 50 % 50 VOID BE 50 % 0.6 0M 0.9 T 2.4 OIL A 6 0 S B JA 0.45 B 50 VO 5 % S.S & 3.6 DR % ID S.S & T. W 5 X ET 76 106 74 RAMP M B 5 X OO IDE B201 . 1.5 B . CH 0.93 TOIL 4.5 M 3 FH 152 BE E AJ 1 60 X 1.05 1.53 T AM 8 S M 6 JA .B 3.2 ED X .08 1.0 0 C 217 75 L. ING LV X 1.6 X 2.50 CHAJ S PA ND X .98 2.85 3.0 0 X RO 3.3 OM 2 S 1.1 SA 3.2 W 0.45 72 S D-LA AM AT MI BE JA & VOID 138 107 G 50% 50% 1.0 0 X E 8 B BED .C M S.S. 0X 3 B 0.4 B HA T. B202 2 R 5M 0.4 T. W ID 5M T 0.9 5 BE 3.0 DR JJA 151 216 S 3.83 OOM X 3.3 .W B S E CH 5 X OO M.B ID AJ JA E CH 3.6 M LI V 3.2 DIN ING W 0.45 .C M UP 75 108 S 5 TOIL ED AJJA 3.73 ROOM 2.7 2.45 ET A B HA T. B203 JJA 5 W 0.60 83 61 S 3X B JJA 2.0 0 X IN / S X 1.53 5.6 G 1.2 3 7 .C M HA T. JJA 0.3 0 0 150 215 58 T SHAF X 4.5 E CH 73 B139 S B AY S 8 X 0.30 0.4 5 WID 5M K FR 109 CHA JJA 2.40 B IDE 2.2 ITC S D B204 T. RIVE T. W MT. B W 8 X HE 0.45 ID E CH 3.0 N 2.0 0 2.0 0 DN 149 214 82 M & VOID 0.45 5 74 50% 50% W AJ S.S. JA FR B 110 S T 2.9 DE LO EL D SHAF 5 X CK 11 E 62 76 1.2 2 U 1.8 TIL 5 X IT 1.0 Y 3.0 LIF 0X T .44 BB X2 Y .60 2.4 8 FR D S 140 148 B B205 213 B 208 S 63 S B IDE CHA 6M W JJA FO C R HA 8 2.4 UP B 0.6 A C JJ M U A 5 EL BEL NIT V OW S-1 141 B B MT. 1.9 2.6 LOB B206 B IDE D 5 W 1.1 147 FO CH 5 1.0 R A 0. AC JJA 6M U BEL NIT OW S-2 DIN G 3.0 LIF 0X T FH C 0 X BY 5.1 W 0.60 .C M HA T. 212 B 209 77 B 0.45 B 0 @ JJA M 0 2.4 5 210 LE ID-L 1.2 EN DESCRIPTION OF PROPOSAL & PROPERTY 5 142 B VE A B207 L N T BE AM RO RAN OF CE SE W 146 211 SH AF T CH BE LO LO BB R 4.7 VIC 3X EL IN R SE 113 B 143 S PL . 78 G- T AJ 2.4 IFT 4.7 VIC 145 B SHAF PROPOSED DEVELOPMENT ON PROPERTY BEARING CTS NO. JA W Y 3X EL AY 6M WIDE DRIVEW ID 5 2.4 IFT E 5 W 0 1.2 112 0.3 B 0 FH B 5M T. 5X 5 2.6 LOB 81 C 2.5 0 BE 124, 125,126,127, 127/1, 128, 146, 146/1, 146/2, 146/3, 146/4, 146/5,146/6, 0.5 1.0 0 X BY ELE. ROOM G 3.8 DR @ B144 U FO CH BEL NIT M 0 X OO OW S-2 2.8 LIF 7.7 LE ID-L 0 R A 79 1.0 0. AC JJA VE A 5 3.3 M 0X T 111 B 6M L ND 3.0 LIF B 6M CU A 50 % IN FRD 5 FO CH BEL NIT 146/7 OF VILLAGE AKURLI , R/S WARD, MUMBAI-400101. & U 50 VOID % CH 50 R 0. A AJJ OW S-1 1.2 TIL 8 X ITY 2.2 FH C 0X T AM S.S . AJ JA % 50 VOID 1.8 0 2.4 BE 5 FR 1.2 T % D 5 T 2.4 OIL S.S & 11 LOB AY 6M WIDE DRIVEW 3 2.4 OIL 5 X ET . .44 B B 5 X ET 1.0 1.5 K EL X2 Y 3.3 ITC 110 CH 1.5 V 1.0 0 X 3 80 AJ 3 J A 5 X HE FR .60 3.0 LIF 2.7 3 1.6 W 3 X .C. 2.4 N 5 6 D UP 0X T 2.4 82 81 83 B 3X P FR B 1.0 5 1.0 3.4 ASS 1.5 D EL 5 B 0.7 X 3 8 X AG 1.2 B 7 5 1.2 E BE 3.0 3 X 5 1.0 E 84 B109 3.6 DR 1.6 3.3 4 X 85 B 8 3 8 B 5 X OO X 5 1.2 1.9 DN 0 0.6 5 2.0 86 DRG. NO. DRAWN BY 4.5 M NORTH JOB. NO. 3.0 3 X 2 6 T 1.5 OI 8 0 88 87 89 B 0.3 3 X LE EV F A B108 B T K 2.4 AC IR 2.4 BE 3.3 ITC B U E 5 3.3 DR 5 X HE 8 2.8 LIF AT 97 573 9 /35 B Prachi FR 0.4 98 0 5 X OO LI 2.4 N 5 X T ION D B 2.0 5M 4 T. W ID CH AJ 4.2 M VI N 3.6 G / 5 2.3 0 W 0.60 .C M 2.7 100 99 B HA T. E 101 JA CH 8 5 X DI 2.0 FR JJA 3 X 102 B AJ 50 U 0 D 1.2 JA 6.5 NIN 1.2 TILI 64 DATE CHECKED BY SM B SCALE & % 3 50 VOID 8 X TY W 0.47 103 65 B % 0.5 C O 5 G L HE CK N B S.S 5 1.8 .C M B . M 0.6 A C AJJFO CH 2.0 T. 5 HA T. 2.8 OB CK - M UN A R 104 B W JJA 5 X BY 66 0 BEL IT ID K E LI OW S-2 2.2 ITC CH VI 2.2 105 S AJ 0.6 AC AJJAFO C 0 8 X HE 106 Ninad N 1.2 B JA R H S 0 3.6 G / W 0.47 3.0 N M UN 3.3 4 X 107 1:300 0.3 BEL IT 1.0 B OW S-1 .C M 67 0 5 X DI 5 CH 50 HA T. 5 3.6 DE 6.5 NIN AJ % JJA FHC 68 S JA 50 VOID 1.0 5 X CK B 5 G 1.6 W.C % S.S & 0 LI V 90 1.1 B 3X . REVISIONS DESCRIPTION : 1.4 U 0 3.2 DIN ING . 3 1.5 @ 1.8 TIL 0.7 6 3 5 X IT 0 X IN / 0 91 S M X .98 CH 1.2 1.0 Y AJ LE ID-L FO C 0.7 R H G S JA 0.6 AC AJJA 3.2 5 0 92 CH T VE A 8 5.6 8 2.4 OI M U AJJ BE NIT P L ND A RAMP 3.4 ASS 5 X LET IN L S OW -1 5 T 1.8 8 2.4 OIL 0.45 M.W. CHA G 3.6 DE 8 X AG 1.5 1.0 FO C 5 8 93 B R-0 PA 5 X ET 1.0 E AM R H 0.5 0 3 5 X CK 3 BE 0 0.6 AC AJJA M U BE NIT S 1.1 SA G 1.5 0.2 5 .2 0.7 70 69 95 94 B 1.4 BE 1.0 1.0 0 X E 96 B LANDING LO S-2 3 LANDING W 5 0.3 0 M M. BEDROO 3 CH 2 3.3 DR 1.0 A 8 1.0 JJ BEAM @ MID- BEAM @ MID- A 1.0 0 X BE 2 . 9 DE X 8 0.5 5 X OO 4.2 M 3 3.8 DR 5 X CK BE 1.0 2 T 2. 5 O I 8 71 B B TOILET 3.95 X 3.20 0 X OO 3.0 DR 0 X LET S B 2.7 1.2 1.40 JJA S 8 LEVEL 3X 5 X OO B LEVEL 2 1.6 3.3 M 1. 5 X 2.33 8 X 0.6 2 1.0 5 5 0.5 3.6 M 5 3 73 72 FRD 0.38 9.5 0.5 2.5 5M 1.00 LANDING 0.45 M.W. CHA S 5M 5X T. 1.00 T. T 1.0 1.5 OI 0.3 W BEAM @ MID- W 5 0.93 0.7 X ID ID 3 X LET 1.20 0 CHAJJA E 0.4 S E 7 CH T CH 5M M FOR A C UNITS-1 0.6 M BELOW X 1.00 2.4 TOILET S AJ 2.4 OIL CHAJJA AJ T. .B BED ROOM JA 5 FOR AC UNITS-2 JA 3.2 ED 1.40 LEVEL 5 X ET W CHAJJA RAMP PASS. 0.6 M BELOW ID 0 X RO 1.5 3 E CH 3.3 OM LIFT X 2.28 0.93 3.65 X 3.05 2 UTILITY CH AJ 3.0 JJA 2.17 3.45 X 3.72 AJ 3 X 1.50 0 2.0 JA JA 0.4 0X & 50 % 5M 0.30 1.83 X 1.08 50 & %V BE 50 VO 0.9 2.00 T. ING 3.6 DR % ID 5 62 0 0.3 50 O S.S W % ID 2.00 2.87 S.S 5 X OO . ID E LAND 59 60 61 BEAM @ MID- . 4.5 M 1.2 CH AJ 58 TW PASSAGE X 0.93 6 3 TW FHC JA 57 TW TW 2.60 X 6.72 KITCHEN LEVEL TW 56 NAME AND ADDRESS OF DESIGN ARCHITECT 2.20 LIFT DECK 55 TW 2.13 X 2.75 LIVING & FRD LIFT 53 54 TW LIFT 2.70 X 2.50 1.27 0.4 51 52 DINING LANDING 5M TW TW 2.70 X 2.50 X 3.05 2.75 X 2.50 5.48 X 3.05 T. TW DN BEAM @ MID- W ID 2.17 TW FRD E CH TW KAPADIA ASSOCIATES AJ JA JJA 0.30 UP FOYER EL M 2.03 3 2.58 X 1.23 LEVE 0.45 M.W. CHA M. BEDROO TOILET FRD 2.00 1.40 2.00 3.95 X 3.20 0.47 X 2.33 1.00 LIFT 1.00 DECK 3.45 X 3.72 2.20 68 FOYER LIVING & DESIGN LLP, PAREL(E), 67 4 2.58 X 1.23 WING-3 1.27 1.20 FHC 66 FRD PASSAGE DINING CHAJJA X 3.05 FOR AC UNITS-1 CHAJJA 65 TW TW 5.48 X 3.05 0.6 M BELOW 0.93 TOILET FOR AC UNITS-2 0.6 M BELOW 2.60 X 6.72 63 64 TW MUMBAI - 400012. X 1.00 TW JJA 1.40 CHAJJA TW UTILITY DN TW PASS. X 2.28 1.83 X 1.08 KITCHEN 0.45 M.W. CHA 2.03 0.75 0.63 BED ROOM 0.93 FIRE 2.13 X 2.75 1.62 FRD UP 1.15 0.75 50% VOID FOYER 7 FRD 2.03 2.87 JJA 3.65 X 3.05 X 1.50 N LIFT 1.15 & 50% S.S. 2.58 X 1.23 EVACUATIO X 0.93 0.45 M.W. CHA 0.75 1.50 UP LIFT 1.62 LIFT 5TH PODIUM FLOOR PLAN 2.75 X 2.50 0.63 0.75 1.50 BED ROOM CHAJJA 2.87 LIFT 50% VOID PASS. 2.70 X 2.50 FRD 2.45 X 2.70 X 0.93 KITCHEN 2.13 X 2.75 2.70 X 2.50 & 50% S.S. CHAJJA CHAJJA TOI. 0.73 X LIFT LIFT 3.20 X 2.50 DN UTILITY 0.93 X 1.50 3.65 X 3.05 G CHAJJA TOILET 2.28 X 1.38 TOILET 3.23 LIVING KITCHEN 1.83 X 1.08 2.28 X 1.38 3.20 X 2.50 CHAJJA 1.40 FOYER TOILET 2.20 0.93 2.13 X 2.75 WING-4 4 2.58 X 1.23 TOI. 2.28 X 1.38 & DINING PASSAGE SMOKE X 2.28 X 1.00 LIVING & E 0.73 1.00 PASSAG FHC 3.25 X 5.48 FRD 2.28 X 1.38 CHAJJA 2 2.60 X 6.72 X X 0.93 CHECK FOR AC UNITS- CHAJJA DECK DINING X 0.93 1.53 0.6 M BELOW FOR AC UNITS-1 JJA 8 LOBBY 3.23 LOBBY 1.20 0.6 M BELOW FOYER 5.48 X 3.05 1.27 FRD 2.45 X 2.43 0.45 M.W. CHA 20.71 X 2.60 2.58 X 1.23 1.00 PASSAGE X 3.05 2.00 LIVING X 0.93 UTILITY 2.00 1.00 1.00 1.53 X 0.93 TOILET M SCALE- 1:300 FRD & DINING M 2.17 M. BEDROO LANDING KITCHEN M. BEDROO 1.73 X 1.05 ING 0.30 LIFT 0.40 1.40 3.25 X 5.48 BEDROOM 3.95 X 3.20 0.38 FOYER 7 LIFT 2.13 X 2.75 LAND M BEAM @ MID- FRD M. BEDROO 3.00 X 0.78 3.20 X 3.60 X 2.33 BEAM @ MID- L 1.20 2.58 X 1.23 LIFT 3.20 X 2.50 3.00 X 0.78 3.20 X 3.18 3.05 X 3.65 CHAJJA 1.20 G FOR AC UNITS-2 CHAJJA 0.6 M BELOW 3.20 X 2.50 LEVEL 3.20 X 3.18 G FOR AC UNITS-1 DECK LIVING & BEDROOM 0.6 M BELOW LEVE FRD FRD CHAJJA 0.6 M BELOW 3.00 X 1.28 FRD 0.92 UP DECK DINING FIRE 2.03 UTILITY 3.05 X 3.65 0.98 1.00 5 FOR AC UNITS-1 UTILITY 5.48 X 3.05 N LANDING 6 LANDING EVACUATIO 1.27 1.20 KITCHEN DN 1.73 X 1.05 JJA 1.08 CHAJJA X 3.05 0.6 M BELOW LIFT 0.45 M.W. CHA 0.93 BEAM @ MID- BEAM @ MID- CHAJJA 1 0.6 M BELOW 2.13 X 2.75 KITCHEN 2 2.45 X 2.70 PASSAGE 0.45 M.W. CHA JJA 0.45 M.W. CHA JJA 1.00 FOR A C UNITS- FOYER FOYER X 1.85 FOR AC UNITS- NAME OF THE OWNER DECK 3.05 X 2.45 SIGNATURE UTILITY 2.60 X 6.72 CHAJJA 1.23 FHC KITCHEN 1.23 LEVEL 2 LEVEL 3.00 X 1.28 FOR AC UNITS- 2.87 1.20 CHAJJA CHAJJA 1.08 1.20 LOBBY X 3.08 0.6 M BELOW 0.6 M BELOW 1 3.05 X 2.45 FOR A C UNITS- X 3.08 X 0.93 2.20 ENTRANCE 0.6 M BELOW JJA 1.00 X 1.85 FOR A C UNITS-2 CHAJJA LIFT W 0.45 M.W. CHA ROOF BELO 1.00 0.98 UTILITY 3.20 X 3.60 JA PASS. SMOKE 0.45 M.W. CHA 2.45 X 0.30 0.45 M.W. CHAJ Navee 1.83 X 1.08 ING 0.93 CHECK 2.00 TOILET BED ROOM M @ MID-LAND TOILET TOILET M/S. GODREJ PROPERTIES LIMITED 2.00 X 1.50 CHAJJA LOBBY BEDROOM CHAJJA 1.53 3.65 X 3.05 1.40 CHAJJA 2.45 X 2.43 1.20 1.53 Digitally signed by Naveen Kumar 1.20 BEAM X 2.45 4.05 X 3.48 2 FOR A C UNITS- 0.93 X 2.28 0.6 M BELOW FRD X 2.45 Poddar 2.17 G CHAJJA CHAJJA LEVEL 0.98 0.6 M BELOW n 1.00 FOR AC UNITS-1 X 1.00 FRD DN: c=IN, o=Personal, title=4539, TOILET X 3.48 0.6 M BELOW FRD FOR AC UNITS-1 TOILET pseudonym=2C73FC5F2E2B7925E3 JJA CHAJJA 1.53 1.00 1.00 0.40 1.20 6 5 UTILITY CHAJJA 1.53 0.98 8E510365EAED7E, X 2.45 PASSAGE LANDING 0.6 M BELOW X 2.45 2.5.4.20=c4ab3e3029b611d0ee305 1.08 X 3.48 JA 1.00 LIVING BEDROOM 2.45 X 0.30 FOR AC UNITS-2 3.43 X 0.93 bf1be8e9e585efd1c35dddc8cbb7b 0.45 M.W. CHAJ BEAM @ MID- TOILET KITCHEN X 1.85 LIVING & DINING Kumar CHAJJA FOYER 0.45 M.W. CHA e302b7645de981, 1.40 0.47 0.92 0.6 M BELOW UTILITY FOYER 3.05 X 2.45 4.05 X 3.48 & DINING 3.35 X 6.10 1.23 postalCode=829107, st=Jharkhand, M X 2.33 FOR AC UNITS-1 KITCHEN 1.23 M. BEDROO 1.08 PASSAGE TOILET serialNumber=4DFD3EABDED1FC59 LEVEL X 3.08 CHAJJA 3.05 X 2.45 X 3.08 3.35 X 6.10 3.95 X 3.20 X 1.85 1.53 45F4A0ADE513DDAB1EE27A53C2B 3.43 X 0.93 0.6 M BELOW CHAJJA 0.93 X 2.45 3292ABB9ED3B03B2064C3, FOR AC UNITS-2 Poddar cn=Naveen Kumar Poddar M M. BEDROO 0.45 M.W. CHAJ BEDROOM Date: 2025.08.14 15:29:17 +05'30' 2.45 X 0.30 JJA 1.20 TOILET 3.35 X 4.28 CHAJJA TOILET 1.53 1.53 BEDROOM 3.05 X 3.98 CHAJJA X 2.45 4.05 X 3.48 TOILET BEDROOM X 2.45 0.98 JA 1.53 50% VOID 2.00 TOILET TOILET 1.53 X 3.48 X 2.45 M. BEDROO M 3.05 X 3.98 DECK & 50% S.S. 1.53 X 2.45 0.98 PASSAGE 3.35 X 4.28 DECK 3.35 X 1.30 X 2.45 X 3.48 LIVING 0.45 M.W. CHAJ 3.35 X 1.30 BEDROOM 2.45 X 0.30 3.43 X 0.93 JJA 0.55 M.W. CHA JJA 0.45 M.W. CHA SIGNATURE LIVING & DINING 4.05 X 3.48 CHAJJA PASSAGE & DINING 3.35 X 6.10 TOILET JA 3.43 X 0.93 3.35 X 6.10 1.53 2.00 50% VOID 0.45 M.W. CHA JJA X 2.45 & 50% S.S. JJA M 0.55 M.W. CHA BEDROOM M. BEDROO 3.35 X 4.28 3.05 X 3.98 CHAJJA TOILET 1.53 BEDROOM 50% VOID 2.00 X 2.45 M. BEDROO M 3.05 X 3.98 DECK & 50% S.S. 3.35 X 4.28 DECK 3.35 X 1.30 3.35 X 1.30 JJA 0.45 M.W. CHA JJA 0.55 M.W. CHA Shashika CHAJJA Digitally signed by Shashikant Laxman Jadhav JJA DN: c=IN, o=Personal, title=4436, 2.00 50% VOID 0.45 M.W. CHA nt 2.5.4.20=96ea24e3466c15550473 & 50% S.S. 630d8843a8d731e6d1b86679d2d JJA 0.55 M.W. CHA 15210387be9f50e48, B-106, Natraj Building, Laxman postalCode=400080, st=Maharashtra, serialNumber=28d8c972d6fe5f6f0 S P A C E A G E 7b6902daebcaee524cb190ed30f1 Mulund Goregaon Link Road Jadhav e33cde9c2dd15f6a34e, cn=Shashikant Laxman Jadhav Date: 2025.08.14 16:22:40 +05'30' Mulund (w), Mumbai : 4000 080 C O N S U L T A N T S