PROFORMA -B 8/35 CONTENTS OF SHEET . CH AJJA 0.45 MT. BED R 4TH PODIUM FLOOR PLAN, LINE AREA DIAGRAM & AREA W 3.65 OOM X 4.2 A CALCULATION. E 1.08 8 M.B ED 3.65 ROOM X 5.5 50% BEAM VO 8 & 50% ID CHAJ TOIL S.S. JA ET AJJA 1.53 MS RAILING X 2.45 1.63 . CH X 1.7 0.45 2 1.93 MT. B MS RAILING 0.75M T WID X 1.5 3 1.63 X 0.9 0 W.I.W 1.53 . W E PL X 3.05 S X 0.15 ANTE 1.65 S R BE D DE 7.48 CK TOIL E 1.83 T 1.85 S S X 1.6 G/ D RO INING X 2.75 CHAJ JA 50% S 2.9 0 56 57 8 7.48 OM VO & 50% ID BEAM 1 S.S. 0.12 2.00 5 2 2.90 S 55 58 S LIVIN X 5.4 8 S 1.8 S 59 BED R 4.08 OOM . CH 54 60 S X 3.6 AJJA S B 61 S 5 0.45 MT. TOILET- LINE AREA DIAGRAM S 53 B 62 1.83 W B B BEAM 50% (FOR WING-1& 6) 52 55 63 VO 50% ID & W.C . S B TOILE S.S. JA 1.53 TOIL CHAJ TOIL X 1.83 ET SCALE - 1:200 56 1.55 T-04 X 1.2 2 1.53 ET 1.53 X 2.45 51 B 50%CHAJJA S B X 2.45 54 57 TOILE AJJA 50% VOID S.S. & BEAM B 1.55 T-04 1.08 S B . CH 50 58 X 1.2 2 T. W BED PAS S KITC 53 5.33 AGE 2.75 HEN MS RAILING S 49 59 B BEAM 0.45 M R 3.35 OOM X 1.5 X 3.6 B B X 4.2 3 5 @M UTIL ID-L 52 60 AND 8 S 2.23 ITY ING LEVE TOILET BUILT UP AREA CALCULATION 48 L X 1.45 S B 61 FRD FOY 1.00 47 51 2.58 ER 1.93 X S FRD 1 2.90 X 1.85 X 1 NO = 5.37 SQ.MT. 0.75MT W IDE PLAN S 62 X 1.20 STO B 50% CHAJ 1.98 RE S S 46 S.S. TER BED 50 VOID JA LIF 3 W.C 0.98 . X 1.5 X 50% 2.30 T 50% & 1.83 S S E PLANTER BED S 45 B S.S. X 2.8 3 VOID & 0.75MT WID S 0.45 2 1.85 X 2.90 X 1 NO = 5.37 SQ.MT. 19 44 49 0 50% MT. WID S S B E CH 20 1.13 43 EVA FIRE X 0.30 AJJA 50% S S 2.40 VO 50% ID & 48 CHAJ CUA BEAM 21 S S B JA @M S.S. T LIF ION ID-L TOTAL ADDITION = 10.74 SQ.MT. X 22 S S 42 63 50% VO LIF 2.30 T 2.78 T SMO ANDI NG LEVE S S S 41 50% ID & CHE KE L X 2.48 BED S S 47 B 0.45 S B S.S. S C X 2.8 LOB K R DRIVER TOILET (B) = 6.60 SQ.MT. B 23 24 S S S S 40 0 2.78 BY X 2.30 W. C MT. HAJJ 3.83 OOM 39 B 46 A TOIL X 3.3 18 25 363 MS R 38 B 5 2.45 ET AILIN TOTAL TOILET (A-B) = 4.14 SQ.MT. S B B 26 27 28 36 37 B 45 EW AY 364 B 362 LOBB 2.01 FRD 1.00 MT H T G X 1.53 M.B B 29 30 31 32 33 34 35 B 44 DRIV 365 B SERV 9.85 Y X 2.5 ELE 2.00 50% 0.45 1.00 ED 3.65 ROOM WID E CH IDE 0.28 MT. 17 19 B B B B 2 VO X 4.5 AJJA 1.00 1.10 ICE L E 43 50% ID & W. CH 6M W 8 B X 1.78 B 361 2.00 IFT 1.20 JA TOIL 0.90 B 4.45 AC 0.6 M UNITS- CHAJ 20 AJJA E B X 1.05 2.45 T BELOW 2 S.S. 42 X 2.8 CH S 0.6 M UNITS- B 2.48 FOR AJJA 50% CHAJJA BELOW 1 X FOY B CH VOID FOR AJJA 1.53 FRD RAM 0 1.68 ER 0.60 MT. 18 AC & B 50% 394 64 S.S. B X 1.08 41 P 1.68 TOIL B UTIL 0.45 21 B B X E W IT 1.53 T 16 B 40 1.53 Y 1.58 .C. B UP X PASS B X 2.50 22 B FHC B CHAJ B FHC 1.85 AGE 50% B X 1.07 B B 39 1.50 3.68 VOID B UP JA B 360 W.C 23 B B S JA 1.88 . X 1.05 50% & WIN 17 24 38 64 2.00 DN CHAJ 1.53 X S.S. BEAM 25 36 37 366 ELV . 180 S LOB BED CHA 15 26 27 28 33 34 35 367 B 2.25 AY 2.60 BY X 8.8 STO 2.58 RE KITC R 3.35 OOM JJA G-1 B 29 30 31 32 181 X 1.68 B X 4.2 1.08 5 3.35 HEN S IDE 1.50 . B FRD X 3.35 6M W S ELV FRD X 2.45 7 16 368 1.50 359 2 FRD MT. W B LOB 1.50 S 65 2.60 BY IDE D 14 B 369 OM B FRD 0.45 B X 6.3 DN 4 . RO .80 FRD 2.00 FOY S E 15 1.23 R FOY LIV 370 ELE FHC & DINING UP RIVE B 65 FRD X E 1.23 R 13 371 B 4.20 1 X S 358 S 5 3.78 X 3.65 ING X 7.3 DE B 1.20 3.78 182 W. C MT. FRD 3 3.65 CK 6M WIDE DRIVEWAY W SERV 50% HAJJ S VO S B 372 & 50% ID S.S. 2.48 ICE L A X 1.53 14 WA Y 392 391 374 373 B B 183 S 166 S 165 66 2.00 0.27 2.00 4.45 X 2.8 IFT 0 STO 2.58 RE X 1.68 12 KITC 184 B B LIV S B DR IVE B B 375 B B 185 S 167 1.99 ELV LOB 9.85 BY 3.35 HEN X 2.45 & DINING 3.65 ING B W 13 197 X 2.5 1.58 .C. X 7.3 3 11 DE 393 B 390 FRD FHC 379 378 186 S 342 FHC 2 0 X 1.07 1.08 DE 3.65 CK X 1.53 B S LIFT B S B 389 S B 50% 50% UTIL X 3.35 388 1.50 187 343 VOID VO IT B 380 1.53 Y BEAM X 2.8 50% ID & 381 50% & B @M CHS. X S 12 WI 383 382 UP ID-L ANDI 2.30 AJS. S.S.JA 1.85 S NG VOID ABOVE LEVE S JA B L CHAJ ELV. 188 EL E. W.C B B 1.88 . 6M 340 67 1.20 AC S X B B 0.6 M UNITS- 10 B 189 BED BELOW 2 FOR 1.53 MS RAILING S B EL E. 1.5 0 2.25 B S 168 B LIF 2.30 T 1.00 A CHAJJ R AC 0.6 M UNITS-1 A BELOW CHAJJ FO 50% VOID PASS AGE R 3.35 OOM IDE CHA ELV. 190 S 341 3.68 X 4.2 JJA 169 B 1.00 X 1.05 FR & 11 EL D 191 S 67 X 2.8 50% 7 S TOIL E. 2.0 0 LIFT PIT 0 MS R CHAJ S.S. E 2.45 T S JA MT. 9 X B UP 1.50 1.50 AILIN LIFT PIT 1.53 W 1.50 P.L. S 68 1.00 G S 170 0.25 MT H B EL E. 1.5 344 B T FOY 0.45 S 1.68 ER 1.5 0 0.60 S 0.90 S 10 1 0.7 376 171 X 1.05 X 1.08 1.68 X TOIL E 1.53 T B BEAM X 5 FH C 278 LIFT PIT LIFT PIT 385 384 377 345 68 73 @M ID-L 2.50 JA 50% S ANDI S 1.5 CHAJ 8 0 387 386 172 S B TER ING G LE VEL 1.10 VO 50% ID & B BED X 1.78 300X75MM AL B 198 FH C S 69 B PLAN R 3.83 OOM S.S. BEAM B 173 S 9 B 346 E. FINS 6M B X 3.3 EL 7 S 279 WI DE 196 S B B B B S S 174 B 347 S 5 TOIL 2.45 ET X 1.53 M.B ED 3.65 ROOM WID E CH S B 8 232 B B 280 DR 195 S S S 175 B 348 70 69 66 S BEAM 0.45 2.40 X 0.30 X 4.5 8 AJJA B 176 MT. IVE B WID B E CH MT. 177 AJJA 6 B 349 50% VOID 0.45 277 WA B & B 233 178 JA 50% S.S. 194 S CHAJ S B 281 Y 179 AY S 74 B 7 350 IVEW 272 B 276 B B B 351 DR 71 B 70 S 5 B 6 B 282 193 S B 352 6M W IDE 75 TER B 275 B B B B 353 FHC S 71 B PLAN 4 B B 283 192 314 B B B 354 B 72 B S B 355 164 5 Y 234 B 274 B 313 B 315 B 319 357 356 163 339 S 72 3 WA 76 S B BEAM B B FHC S 4 DR IVE 231 235 B B 273 312 B 316 B 320 S B B 338 2 B B B 311 B B S WAY 77 B S 3 DE B 5M WI 236 317 322 B TER 1.6 P SH WI B 310 B PLAN 6M 5 X AF EL E DE 237 EX OW 107 318 B 162 337 RIVE 1 .5 DR HA C US 5.7 T B 321 T B EL S B WAY ME E.3 0 IVE 333 2 0.2 1.5 0 FH C W S 108 309 B 147 324 1.5 0 B 6M W 78 B B 0.4 5 SE 5 FR AY S 336 B IDE D T. M 50 UP X12 RV IC ES B 0 D 238 334 UP RIVE B 1.5 B 1.5 2.2 VC 5 84 LA S W E ID FIN S B 1 0 DN 109 308 325 6M 5 B A B323 CH 146 A B S WI AJ M JA .B 4.2 ED 169 2.2 5 239 DE DN 1.5 0 IDE D B 79 5 B T 307 0.4 1.2 OILE 7 x RO UP 1.6 CL S S B 5M 2 X T-1 D T. 3.2 OM 1.5 110 326 DR FR 74 L UB C FO HAJJ 5 145 B W 0 0.6 UN R A A T ID M ITS- C 1.2 OILE E BE 1 LO W C 2 X T-2 170 2.5 IFT IV FH 85 6M W FO HAJJ 1.5 148 B C 1.6 B B CH 0.6 UNIT R A A EW 5 CL B BE T M S- C TER 0X S BE 2 5 AJ 1.5 OIL 306 LO 3.6 DR PLAN W JA 111 EL L UB STAMP AND DATE OF RECEIPT OF PLAN 0.30 2 x ET 2 .1 327 5 x OO AY V. S 2.5 B 1.0 0 0.58 3.0 M 171 2.5 IFT 0 0.8 0 X 5 CH A 168 149 EL V. S 80 B 3 0X B JJ EL 1.2 DE PA 1.0 SS T 1.5 OIL A 2 .1 E. S 112 305 328 335 86 75 B S 7 x CK 1.5 0 x . B B 0 B B230 3.2 2 x ET 1.0 0 7 2.4 5 0 BE 172 EL E. S 150 B CH 1.0 AM 304 AJ T S J 0 SHAF 2.9 @ 76 A LI 2X M 113 329 S LE ID- 81 B B229 VI 0.9 VE LA N 5 .6 G & 2 U 1.8 TIL 2 X IT DIN L N B167 173 106 B S 87 S B 151 B B G 1.2 1.2 DE 5x D 1.0 Y 0 7 x CK 3.2 3.2 ININ 0 G 5 105 6M S 114 330 S K 144 B B 0 2.2 ITC LI VIN 7 X HE 3.0 N S WI 174 B228 240 S 152 77 73 TER S B S S 5 PLAN CH JJA 5.6 G & DE 115 331 0.30 83 FILE NO. 5x D A 166 143 S 3.2 ININ DR B B227 241 S 0.58 B ID T. W E BE 0 G 2.7 2X 3.0 LIF RA MP IVE 175 153 82 B B 88 P-17708/2023/(124 AND OTHER)/R/S WARD/AKURLI-R/S UP 3.6 DR 0X T B M S B 1.2 0.4 5 5 x OO 2 F 2.4 104 WA 116 B332 B S 2.7 .R 3.0 M B B226 142 2X .D 5 B B . 5 176 242 S S 1.2 Y C FO HAJJ 08 2 .9 0.6 UNITR A A 2 154 T JJA 2X B S- C SHAF M B165 BE 1 S PA F.R 303 LO 3.0 LIF 6M C CH 0.9 FO HAJJ 7M W 1.0 SS .D A 117 0.6 UNITR A A . 2 S- C . 0X T 1.5 0 x M BE 2 S ID 07 FR 161 LO 141 B B E K B225 W 7 2.2 ITC 2.4 D 177 WI S WI NOTE:- S W T. M 1.0 0.8 0 X 7 X HE 5 243 DE DE 155 B 5M .B T 3.0 N 0.4 4.2 ED 7 x RO 3 1.5 OIL 2 x ET 5 CH AJ CH 103 S 302 L.G LV NDIN 1) ALL DIMENSIONS ARE IN METER. Ra 2-W Ra 2-W AJ D-LA 3.2 OM 2.4 JA SE J 284 140 S 160 AT MI B B224 BEAM S S 5 S R 5.23 B U A 1.8 TIL 178 244 89 2) THIS PLAN IS DIGITALLY SIGNED AND PHYSICAL SIGN NOT REQUIRED AJ 0 JA .44 4.7 VIC RAMP t AY t AY S CH 2 X IT 1.0 Y 3X EL io io B 301 B 11 EV F 2.4 IFT 164 1 B 1 3) THIS CANCELS THE EARLIER APPROVAL ONLINE ISSUED UNDER NO P-17708/2023/(124 AND T 5 VOID AC IR 1.5 OIL RA RA 0 U E :8 1.5 5 :8 285 139 B 2 x ET B223 2.8 LIF AT 2.6 PA B MP 78 2.5 0 1.0 5 X T I ON 2.9 0 X SS. 179 245 MP S OTHER)/R/S WARD/AKURLI-R/S DATED -24.02.2025 B AJJA 0 5 2.3 FRD A AJJ EL 156 VOID B CH EA B 0 S 163 B 1.0 E 0 M 5.1 300 E CH S 4) THIS DRAWING SHALL BE READ IN CONJUNCTION WITH LETTER ISSUED UNDER NO @ 0 SM M LE ID- 1.2 CH OC C FO HAJJ 5 WID 286 138 JA BE E C B B 0.6 UN R A A UP B222 E K LOW HAJJ VE LA L N 2.8 LOB CK M ITS-1 C BE 180 246 0.45 M CHAJ .W. MT. A CHAJWID B 5 X BY LO MT. P-17708/2023/(124 AND OTHER)/R/S WARD/AKURLI-R/S. ON EVEN DATED DIN CH W 3 EL 0.45 JA 2.40 B FO AJJ X 0.30 0.45 50% CH 157 M LIF 0 0.6 UNITR A A 1.20 2.2 CHAJ .W. G 2.0 V VOID 299 2.33 T S M S-2 C 162 B 0 0 BE 0.3 A JA L. & CH LO W P 25 ASS JJ A 271 287 PL X 2.8 NDIN G LV D-LA AM AT 50% S.S. B B221 90 0 A MI B BE .55 JJ 2.0 DN 0 .S M A FH .47 A 4.4 FH 0 2.0 181 247 1.6 HA B BED B 158 R T. C 0 2.00 X GE 3.83 OOM 3 W C FT 2.00 B S 2.5 ELV MS 156 161 298 B ID 2.0 0.3 2.0 270 5X DN 1.0 RAIL 2.6 TOIL E 0 B 0 X 3.3 CH 0 0 1.5 2.00 2 0 M IN CH 1.5 LOB 3 0.3 3.9 1.5 288 0 2.45 ET 0 B B220 79 5 AJ TH G 2.4 LIFT AJ 9.85 BY 3 BE 0 0 JA 8 1.5 3.8 DR T 2 JA EL V 2.0 G 182 248 0 6M 0 0.2 S 159 VOID X 2.8 VOID X 1.53 B CH 0.9 0 IN 0.5 5 S X 2.5 M.B 0 X OO B 5M 2.4 @ 1.6 2.35 ED AJ B M 3.3 M 0.9 7 JA LE ID- 155 0 B WI 297 2.2 ELV 3.73 ROOM JJA PLAN FOR APPROVAL UP 1.5 2.48 2.6 PA VE LA 269 2 22.0.0 50 5 0 X SS. 00 L ND 160 WI 0 1.5 289 DE 5 0 137 WJAID B 1.00 X 4.5 B219 % AJ 50 VOID % S.S & CH AJ JA 50 % 1 50 VOID.20 U 1.2 TIL 7 X IT 1.8 Y 2.0 5.1 EL E BE AM 183 DE EL S B UP 1.20 1.00 0.93 8 BEE LOC WHA B E. T DR TOIL X 1. CH 8 . 2.4 OI % 0 2.9 UP FOR AJJA CHAJJ 05 B B ET X 1.6 154 % S.S. FOR T 5 AC A 5 S.S & 5 0.6 M UNITS- AC 0.6 M UNITS-1 2.4 OI 5 X LET 2.45 BELOW 2 50% SE DR EL 268 DN 5 UP BELOW . VOID 5 X LET K 1.6 MTCH. 159 B IVE 2.85 0 X .91 1.5 CH 3.3 ITC R 4.7 VIC E. 290 136 135 91 SERV 50% S.S. & & 50 X 1.53 B 1.5 B218 2 5 X HE FHC IVE AJ 1.0 CH FH RAMP B IC VOID 3X EL 2.00 JA 2 F.R 06 DN UTIL TOIL 0.45 1 1 P 1.6 .TO 2 X ILE 2.4 N 5 .D . 2.4 IFT A JJ 184 C WA FH B FRD 4.49 E LIFT W 1.58 .C. 1.53 ITY VOID 1.53 T E X .05 A B 153 WA B B X 1.8 PASS X 2.5 1.8 P 1.5 T 5 C X 2.8 B S 50% 0 3.4 ASS 2 1.6 6 X AG 2 1 X .22 05 2.8 LIF 158 FR B 267 118 Y 3 X 1.08 7 W.C 3.65 AGE CHAJ JA G-2 X 1.05 F.R Y 134 80 . B 8X B217 1.0 E 1 3.0 .D D 1.88 0X T B BE 1.6 X .24 7 . 3.6 DR 7 3 3.3 5 1 X .22 2 .2 CH FO AJJ 0.6 UNITR A A 185 249 D FR S LOBB Y X 1.53 BED 0 B B B AJJA 5 X OO 3.0 3.0 LIF R C 2.60 M S S 3.40 OOM BE -1 STO 7 LO 266 296 S 0X T B C 4.5 M 119 SANTOSH Digitally FO HAJJ X 8.8 2.58 RE W 1.20 KITC 6 1.5 TOI 0.6 UNITR A A M S-2 C 2.4 152 157 133 5 W. C MT. HAJJ X 1.68 3.35 HEN 1.08 X 4.2 0.45 signed B X 3. B216 BE A 2 X LE 186 35 8 PANKAJKU Digitally signed by WIN MTCH. AJ B LO BE K W 5 X 2.45 2.4 T LI 3.3 ITC 250 B 3.3 DR WJAID Digitally signed by 1.20 5 V 5 X HE F.R W. C M. by SANTOSH 04 S 0.4 B 5 X OO IN 2 5M 2 .4 N .D 295 HAJJ BEE 3.6 G & B B 265 S LOB PANKAJKUMAR . UTTAMRA UTTAMRAO RAUT A CH 4.2 M ROHIT 3.0 LIF LOW T. W CH 5 151 120 132 92 2.60 BY ROHIT MAR 2.7 ID 5X D 0X T AJ B 8 B215 E J CH AJ JA 50 % 50 VOID A 6.5 ININ 5 G U 2.4 5 CH FO AJJ 0.6 UNITR A A 7X 1.2 2 187 251 B B VOID X 6.3 FRD 4 FOY ER LIV SURESHCHANDRA LILACHAND B 1.2 TIL SERV & DINING SURESHCHAN SONAR Date: 2025.08.18 0.4 M S-1 C % 294 1.23 B148 7 X IT BE S S C S.S & 5M B Y FO HAJJ ICE L LILACHAND JADHAV LO O RAUT 16:25:33 +05'30' 1.7 1.8 W X 3.77 B . T. LI 3.65 ING 0 W VI 5 0.6 UNITR A A M S-2 C 150 121 131 81 4.48 IFT FRD B ID K FRD X 7.3 B214 BE 2.2 ITC E N LO B BE CH W 5 FOY 3.6 G & 188 X 2.8 3 S Date: 2025.08.18 S AM 0 DRA SONAR Date: 2025.08.14 FHC 8 X HE 252 0 0.3 A JJA 1.0 ER 3 3.0 N 3 1.23 DE B 5X D 1 3.80 CK JADHAV X .24 5.8 X 3.77 6.5 ININ S 5 B 293 3.3 14:09:41 +05'30' 1 7M CH 50 .20 DN X 1.53 0 5 P 149 122 AJ 1.0 MS 5 1.6 .TO G 2.00 17:39:28 +05'30' JA % 3.6 DE 2 X ILE 50 VOID 1.0 RAIL LI 0.7 STO B B213 B V 5 X CK 1.5 T % S.S & . 0 M IN TH G U 1.8 TIL 3.2 DIN ING 5 C 0.7HAJJA 189 253 WI UP 2.58 RE B 1.4 2 @ 0 X 1.68 T 5 X IT DE 5 2 1.2 0 X IN / X .97 93 CH 3 KITC T AJ JA M LE ID- 0 1.0 Y G 3.2 147 S 292 B LOB 5.6 B 9.85 BY 3.35 HEN LIV VE LA 2.4 OI CH 8 7 50 3 WAY P 123 AJJ L ND & DINING 5 X LET Ra 2-W % 3.4 ASS 5 LIFT A IN 50 VOID X 2.45 B 212 T B X 2.5 6 X AG 1.5 G 2.4 OI % 190 254 B 3.65 ING A.E.(B.P) R- S 5 X LET S.S & X 2.8 2.48 B E.E.(B.P.)WS-II 'R-1' 1.0 E 2 W BE 6M S.E.(B.P)R-2 CH 1.0 3.6 DE 1.58 .C. AJJ . AY AM 5 X CK 3 0 PA 1.5 A t io VOID 2.35 X 7.3 S 2 291 2.00 X 1.08 3 DE S 1.0 2.1 SAG 1.0 BE 3.80 CK 1.4 WI 1 B CH ELV RIVE 0 1.0 8 X E 3 3 RA 124 AJJ 3 .3 D R 0 BE :8 A X .91 2.9 DE B X 1.53 2 S 2.00 DE B211 0 5 X OO 3 .8 D R T 1.08 B 1.0 5 X CK 1.1 4 .2 M 1.6 8X 1 0 X OO 3 .3 M 1.2 BE 2.5 OI 0 X LE T 146 191 255 MP L.LAND 3 UTIL 1.53 ITY X 3.35 8 1.6 2 3.0 DR 1.5 DR ING LV LIF 2.33 T 2.00 X 1.87 S D- AT MI 2 7 5 5 X OO 130 B BEAM 6M W CHAJ 125 0.5 94 B IVE 8 0.3 3.6 M S 1 0 JA JA W.C 0.4 X .05 X 2.8 0.3 8 S.S. 5M T. W ID T 1.8 2 5X 2.5 CH E AJ 5 M .B 3.2 ED CH 0.7 5 8 0.2 DIN G 101 WA 192 B B210 256 B B EVA FIRE CUA FRD 1.20 AC 0.6 M UNITS- BELOW 1 CH AC 0.6 M UNITS- BELOW 2 CH 50% 1.88 X 1.5 3 . BED AJJA IDE D 1.5 OI ID 0.5 FOR AJJA FOR AJJA 0.6 0 X RO R AJJ E 5 0.28 T 3.40 OOM 2 X LET LIF ION W A T PASS S CH 0M @ T 3.3 OM 2.5 OI VOID 129 1.00 T. B 1.8 AJ 2.4 OI M JA 2.4 5 5 X LET 0.5 5M T. W ID 3 0 X LET 1.5 5 LE ID- VE LA L N S Y 126 83 FRD 2.83 T X 2.50 SMO CHE KE VOID 1.00 & 3.65 AGE X 1.05 X 4.2 WID E CH 145 B 1.5 8 E B209 CK 50% TOIL B 3 CH S B 0.7 AM 2 LO ET 193 257 CH AJ 3 .0 2.83 BBY 5 95 1.7 AJ BE 0.3 0 JA JA CH 1.1 CHAJ 2.45 0 0X AJJ 0.7 X 2.30 X 1.53 MT. 50 % 50 VOID BE 50 % 0.6 0M 0.9 T 2.4 OI A 6 0 S B JA B 50 VOID 5 % S.S & 3.6 DR % S.S & T. WID 5 X LET 100 127 98 RAMP 0.45 B 5 X OO B208 . EC 1.5 B . 0.93 TOIL FH BE AM 4.5 M HA 1 3 194 258 84 99 X 1. 8 1.53 T E S JJ M X .08 C 05 X 1.6 6 A .B 1.0 ING LV X 2.5 3.2 ED 0 L. CHAJ S PA D-LA X .98 0 2.85 0 X RO 3.3 OM 2 S 1.1 SAG 3.2 W 0.45 128 96 S ND AT MI BEAM JA & VOID 3.0 0X 3 1.0 0 X E 8 .C M 144 B TER BED 50% 50% S.S. B 0.4 B HA T. B207 2 PLAN 0.4 195 0.30 R 5M 3.83 OOM 0 JJA BE T. W ID 5M T .W .95 3.0 DR 259 X 3.3 B S E CH 5 X OO M.B ID AJ JA E CH 3.6 M LI V 3.2 DIN ING W 0.45 .C M UP 99 S 5 TOIL ED AJJA 3.73 ROOM 2.45 ET AJ 2.7 B HA T. B206 JA 5 3X W 0.60 B JJA 85 2.0 0 X IN / 5.6 G 1.2 3 .C M HA T. JJA 0.3 0 0 S 196 260 82 SHAF X 1.53 X 4.5 WID 7 97 S E CH B143 RIVE T 5 B 8 X 0.30 0.4 AJJA 2.40 5M K FR E CH B 2.2 ITC D B205 T. WID WAY MT. B W MT. ID E CH 8 X HE 3.0 N 2.0 0 2.0 0 DN 197 261 0.45 50% & VOID 0.45 AJ JA 2.9 DE 5 11 LO EL FR D 98 S 100 SHAF T 50% S.S. 5 X CK U .44 BBY E 142 87 86 B 1.8 TIL 3.0 LIF S B B204 B 1.2 2 5 X IT Y 0X T X2 .60 2.4 8 FR D 198 262 S IDE D FO C 1.0 2 .4 UP R HA 8 B 0.6 AC JJ M U A 5 EL BE NIT LO S-1 V 141 W B 1.9 2.6 LOB B203 B 1.1 5 199 263 101 FO C 3.0 LIF R H 5 0. AC AJJA 0 PLAN 0 X BY W .60 1.0 6M U BE NIT @ LO S-2 W G IN 0X T FH C 5.1 .C M HA T. 6M W B TER B 0 M JJA LE ID- 1.2 0 2.4 5 EN VE LA 5 140 B B202 L ND BE AM T RO RAN OF CE W 200 264 FT HA BE LO SE R 4.7 VIC IN SE B S PL .S 3X EL 137 102 DESCRIPTION OF PROPOSAL & PROPERTY LO BB JJA R 139 201 WID E CH A W Y 2.4 IFT 5 G- 4.7 VIC 3X EL 2.4 IFT 6M WIDE DRIVEW AY B SHAF T 5 0 0.3 1.2 B 0 C B 5 T. PROPOSED DEVELOPMENT ON PROPERTY BEARING CTS NO. 124, 2.5 5M 2.6 LOB 136 FH 5X 102 0 0.5 BE 1.0 0 X BY G 3.8 DR IN ELE. ROOM B138 U FO CH BE NIT @ 0 X OO LO S-2 2.8 LIF 7.7 M 103 1.0 R 0.6 AC AJJA 125,126,127, 127/1, 128, 146, 146/1, 146/2, 146/3, 146/4, 146/5,146/6, 146/7 OF W 0 LE ID- 3. 3 M 5 & 50 % % 50 VOID S.S 5 CH AJ 50 % FO C R H 6M U BE NIT 0. AC AJJA LO S-1 W M U 1.2 TIL 8 X IT Y 0X T 2.2 0 FH C 3.0 LIF 0X T BE AM VE LA L ND B 135 FRD FHC B JA 50 VOID 1.8 2.4 VILLAGE AKURLI , R/S WARD, MUMBAI-400101. . 5 FR 1.2 T % D 5 PLAN T 2.4 OI S.S & 11 LOB AY 6M WIDE DRIVEW 3 2.4 OI 5 X LET . TER 5 X LET .44 B 1.5 3 1.0 1.0 0 X 1.5 3 CH AJ JA K 3.3 ITC 5 X HE FR D EL V X2 Y .60 3.0 LIF B 134 104 0.30 2.7 3 1.6 W 3 X .C. 2.4 N 5 6 UP 0X T 2.4 106 105 0.58 107 B 3 P FR B 1.0 5 X 1.0 3.4 ASS 1.5 D EL 5 B 0.7 X 3 8 X AG 1.2 B 7 5 1.2 E BE 5 1.0 E 3.0 3 X 108 B133 3.6 DR 1.6 3.3 4 X 8 109 B 8 3 B 5 X OO X 5 1.2 1.9 DN 110 2.0 DRAWN BY 0.6 NORTH JOB. NO. DRG. NO. 5 4.5 M 0 3.0 3 X 2 6 T 8 112 111 1.5 OI 113 0 B 0.3 3 X LET EV F A B132 B K 2.4 AC I R BE 3.3 ITC B 2.4 U E 121 8/35 8 3.3 DR 573 Prachi 5 5 X HE 2.8 LIF AT 122 B 0.4 FR LI 0 2.4 N D 5 X OO 5 X T I ON B 4 123 5M 2.0 T. VI 5 W 0.60 W ID CH AJ 4.2 M N 3.6 G / 2.3 0 .C M 2.7 125 124 B E JA HA T. CH 8 2.0 JJA 3X 5 X DI FR 126 B AJ 50 U 0 1.2 DATE CHECKED BY D 6.5 NIN 88 SCALE 1.2 TILI SM B JA % & 50 VOID 8 X TY W 0.47 CH OC 3 127 89 N B % 0.5 5 G B S.S 5M 1.8 .C M E K 2.8 LOB CK B . FO C HA T. - 2.0 T. 5 6M R H 0. A C AJJ JJA 128 B U W BE NIT 5 X BY 90 0 ID K E LI LO S-2 2.2 ITC 129 A W CH VI 2.2 130 S Ninad AJ N 1.2 FO CH 0 8X H B JA E M R 1.0 S 3.6 G / 0 3.0 N 0.6 AC AJJA 131 1:300 U 3.3 4 X 0.3 BE NIT 0 W .47 B .C M 91 LO S-1 5 X DI W 5 0 5 CH 50 HA T. 3 .6 DE 6.5 NIN AJ % JJA 92 S FHC JA 50 VOID 1.0 5 X CK B 5 G 1.6 W 3 X .C. % S.S & 0 LI REVISIONS DESCRIPTION : 0 V B 1.1 1.4 U 3.2 DIN ING 114 . 3 1.5 1.2 1.8 TIL 0.7 6 3 CH AJ 0 DIN G FO C 5 X IT 1.0 Y 0 X ING / 0 X .98 0.7 115 S S R H 3.2 116 JA 5 @ 0.6 A C AJJA T CH P 2.4 OIL M LE ID- M UN B EL ITS 8 5.6 8 AJJ A RAMP 3.4 ASS 5 OW -1 5 X ET VE LA T 2.4 OIL 1.8 0.5 0 117 0.45 M.W. CHA 8 X AG L N 1.5 5 3.6 DE 1.0 5 .28 118 R-0 FO C B PA 5 X ET 1.0 E AM R H 5 X CK 3 3 BE 0 0.6 AC AJJA M U BE NIT S 1.1 SA G 1.5 0.2 8 0.7 94 93 119 B 1.4 BE 1.0 1.0 0 X E 120 B LO S-2 LANDING 3 LANDING W 5 0.3 0 M M. BEDROO 3 CH 1.0 2 3.3 DR AJJ 8 1 BEAM @ MID- BEAM @ MID- X .08 A 1.0 0 X BE 2.9 DE B 3.95 X 3.20 0.5 5 X OO BE 1.0 8 TOILET 3.8 DR 5 X CK T 4.2 M 3 2 2.5 OI 95 B 3.0 DR S 0 X OO 1.40 0 X LET B 2.7 1.2 JJA S 8 LEVEL LEVEL 3 5 X OO B 2 1.6 X 3.3 M 1.5 X 2.33 8X 0.6 2 1.0 5 5 0.5 3.6 M 5 3 97 96 0.38 9. 5 0.5 2.5 5M 1.00 0.45 M.W. CHA LANDING S 5M 5 1.00 1.0 X T. 1.5 TOI T. W BEAM @ MID- 0.93 5 0.3 W 0.7 X 0 ID 1.20 ID 3 X LE CHAJJA 7 E 0.4 S E CH T 5M FOR AC UNITS-1 X 1.00 T M TOILET CH 0.6 M BELOW 2.4 S AJ 2.4 OIL CHAJJA T. .B BED ROOM JA AJ FOR A C UNITS-2 5 3.2 ED 1.40 LEVEL 5 X ET JA W CHAJJA RAMP PASS. 0.6 M BELOW ID 0 X RO 1.5 3 E CH 3.3 OM LIFT X 2.28 0.93 3.65 X 3.05 UTILITY 2 CH 3.0 2.17 JJA AJ 3.45 X 3.72 AJ 3 X 1.50 0 JA 2.0 JA 0.4 0X 50 & %V 5M 0.30 1.83 X 1.08 50 0.9 % BE 50 OID T. 12 2.00 LANDING & 0 0.3 50 VOID 3.6 DR % S.S W 5 2.00 % 2.87 5 X OO . ID 11 BEAM @ MID- S.S . 4.5 M E 9 10 TW X 0.93 PASSAGE CH 6 1.2 3 AJ JA 7 8 TW FHC 6 TW TW 2.60 X 6.72 LEVEL NAME AND ADDRESS OF DESIGN ARCHITECT 5 TW KITCHEN TW 2.20 LIFT DECK 3 4 LIFT 2.13 X 2.75 LIVING & 1.27 0.4 2 TW LIFT 2.70 X 2.50 1 LANDING 5M TW 2.70 X 2.50 DINING X 3.05 T. TW TW 2.75 X 2.50 5.48 X 3.05 BEAM @ MID- DN 2.17 W ID E TW TW FRD KAPADIA ASSOCIATES CH AJ JA JJA 0.30 UP FOYER LEVEL M TOILET 2.03 3 2.58 X 1.23 0.45 M.W. CHA M. BEDROO 1.40 0.47 2.00 2.00 FRD 3.95 X 3.20 X 2.33 LIFT 1.00 1.00 DECK 3.45 X 3.72 18 FOYER DESIGN LLP, PAREL(E), 2.20 16 17 4 2.58 X 1.23 LIVING & WING-3 1.27 FHC 1.20 FRD PASSAGE DINING CHAJJA X 3.05 15 TW 1 FOR A C UNITS- TW CHAJJA 5.48 X 3.05 0.6 M BELOW 14 TW 2 FOR AC UNITS- 0.93 2.60 X 6.72 13 0.6 M BELOW MUMBAI - 400012. X 1.00 TOILET JJA 1.40 CHAJJA TW TW UTILITY DN TW PASS. X 2.28 1.83 X 1.08 KITCHEN 0.45 M.W. CHA 2.03 0.75 0.63 BED ROOM 0.93 FIRE 2.13 X 2.75 1.62 FRD UP 0.75 FOYER 7 FRD 2.87 JJA 2.03 1.15 50% VOID 3.65 X 3.05 X 1.50 N LIFT 1.15 & 50% S.S. 2.58 X 1.23 EVACUATIO X 0.93 0.45 M.W. CHA 0.75 1.50 UP LIFT 1.62 LIFT 2.75 X 2.50 1.50 0.63 0.75 CHAJJA 2.87 LIFT 2.70 X 2.50 50% VOID FRD 2.45 X 2.70 PASS. BED ROOM X 0.93 KITCHEN 2.70 X 2.50 & 50% S.S. CHAJJA CHAJJA TOI. 0.73 X LIFT 3.20 X 2.50 DN UTILITY 0.93 X 1.50 3.65 X 3.05 G 4TH PODIUM FLOOR PLAN 2.13 X 2.75 CHAJJA TOILET 2.28 X 1.38 LIFT TOILET 3.23 LIVING KITCHEN 1.83 X 1.08 CHAJJA 1.40 FOYER TOILET 2.28 X 1.38 2.13 X 2.75 3.20 X 2.50 2.20 0.93 WING-4 4 TOI. 2.28 X 1.38 & DINING PASSAGE X 2.28 X 1.00 LIVING & FRD 2.58 X 1.23 0.73 2.28 X 1.38 1.00 PAS SAGE 3.25 X 5.48 FHC SMOKE CHAJJA 2.60 X 6.72 2 X X 0.93 CHECK FOR AC UNITS- CHAJJA DINING X .93 1.53 0.6 M BELOW DECK 5 M.W. CHAJJA FOR AC UNITS-1 8 LOBBY 3.23 LOBBY 1.20 0.6 M BELOW FOYER 5.48 X 3.05 1.27 FRD 2.45 X 2.43 20.71 X 2.60 2.58 X 1.23 1.00 2.00 X 3.05 LIVING PASSAGE 2.00 1.00 X 0.93 UTILITY 1.00 1.53 X 0.93 FRD TOILET M & DINING M 1.73 X 1.05 2.17 M. BEDROO LANDING KITCHEN M. BEDROO LANDING LIFT 0.30 3.25 X 5.48 0.40 1.40 BEDROOM 3.95 X 3.20 0.38 LIFT 2.13 X 2.75 BEAM @ MID- FOYER 7 3.00 X 0.78 BEAM @ MID- M X 2.33 M. BEDROO FRD 1.20 3.20 X 3.60 2.58 X 1.23 3.20 X 2.50 3.20 X 3.18 3.05 X 3.65 SCALE- 1:300 0.4 LIFT 3.00 X 0.78 CHAJJA 2 1.20 G FOR AC UNITS- CHAJJA 0.6 M BELOW 3.20 X 2.50 3.20 X 3.18 LEVEL G LEVEL FOR AC UNITS-1 DECK LIVING & BEDROOM 0.6 M BELOW CHAJJA FRD FRD 0.6 M BELOW 3.00 X 1.28 FRD 0.92 UP DECK DINING FIRE 2.03 3.05 X 3.65 1 FOR AC UNITS- 1.00 N UTILITY 0.98 5 UTILITY 5.48 X 3.05 LANDING LANDING 1.27 KITCHEN EVACUATIO DN 1.73 X 1.05 1.20 6 JJA 1.08 CHAJJA BEAM @ MID- BEAM @ MID- 0.6 M BELOW X 3.05 LIFT 0.45 M.W. CHA CHAJJA 0.93 2.13 X 2.75 0.6 M BELOW KITCHEN 2 2.45 X 2.70 PASSAGE JJA 0.45 M.W. CHA JJA FOYER X 1.85 FOR AC UNITS- NAME OF THE OWNER 0.45 M.W. CHA 1.00 SIGNATURE DECK FOR AC UNITS-1 FOYER 3.05 X 2.45 UTILITY 2.60 X 6.72 CHAJJA 1.23 FHC KITCHEN 1.23 LEVEL 3.00 X 1.28 LEVEL FOR A C UNITS-2 2.87 1.20 1.08 1.20 LOBBY CHAJJA CHAJJA 1 0.6 M BELOW X 3.08 0.6 M BELOW 3.05 X 2.45 FOR AC UNITS- X 3.08 X 0.93 2.20 ENTRANCE 2 0.6 M BELOW X 1.85 FOR A C UNITS- 1.00 CHAJJA JJA LIFT W 0.45 M.W. CHA ROOF BELO 1.00 0.98 UTILITY PASS. SMOKE 3.20 X 3.60 JJA Navee 0.45 M.W. CHA 2.45 X 0.30 1.83 X 1.08 LANDING 0.45 M.W. CHA 0.93 CHECK 2.00 TOILET BED ROOM M/S. GODREJ PROPERTIES LIMITED TOILET LOBBY 2.00 TOILET BEAM @ MID- BEDROOM Digitally signed by Naveen Kumar CHAJJA X 1.50 CHAJJA 1.53 3.65 X 3.05 1.40 CHAJJA 2.45 X 2.43 1.20 1.53 Poddar 1.20 X 2.45 4.05 X 3.48 FOR AC UNITS-2 X 2.28 DN: c=IN, o=Personal, title=4539, X 2.45 2.17 0.93 0.6 M BELOW FRD G n CHAJJA CHAJJA 0.98 pseudonym=2C73FC5F2E2B7925E LEVEL 1 0.6 M BELOW 1.00 FOR AC UNITS- X 1.00 0.6 M BELOW FRD FRD TOILET X 3.48 38E510365EAED7E, FOR AC UNITS-1 TOILET JJA CHAJJA 1.53 2.5.4.20=c4ab3e3029b611d0ee305 1.00 1.00 0.40 1.20 6 5 UTILITY CHAJJA 1.53 X 2.45 0.98 PASSAGE bf1be8e9e585efd1c35dddc8cbb7b LANDING 0.6 M BELOW 1.08 2 1.00 JJA X 2.45 X 3.48 e302b7645de981, LIVING 2.45 X 0.30 BEDROOM Kumar FOR AC UNITS- 3.43 X 0.93 BEAM @ MID- L KITCHEN postalCode=829107, 0.45 M.W. CHA TOILET X 1.85 LIVING CHAJJA FOYER & DINING 0.45 M.W. CHA 4.05 X 3.48 st=Jharkhand, 0.6 M BELOW FOYER 3.05 X 2.45 0.92 1.40 0.47 UTILITY & DINING 3.35 X 6.10 1.23 serialNumber=4DFD3EABDED1FC5 M FOR AC UNITS-1 KITCHEN 1.23 TOILET M. BEDROO X 2.33 1.08 X 3.08 PASSAGE 945F4A0ADE513DDAB1EE27A53C 3.05 X 2.45 X 3.08 3.35 X 6.10 LEVE CHAJJA 1.53 3.95 X 3.20 2B3292ABB9ED3B03B2064C3, X 1.85 3.43 X 0.93 0.6 M BELOW Poddar CHAJJA 2 0.93 X 2.45 cn=Naveen Kumar Poddar FOR AC UNITS- Date: 2025.08.14 15:28:52 +05'30' M M. BEDROO 0.45 M.W. CHA BEDROOM 2.45 X 0.30 JJA 1.20 TOILET 3.35 X 4.28 CHAJJA TOILET 1.53 1.53 BEDROOM 3.05 X 3.98 CHAJJA X 2.45 X 2.45 4.05 X 3.48 0.98 JJA TOILET 1.53 BEDROOM 50% VOID 2.00 TOILET TOILET 1.53 X 3.48 X 2.45 M. BEDROO M 3.05 X 3.98 DECK & 50% S.S. 1.53 X 2.45 0.98 PASSAGE 3.35 X 4.28 DECK 3.35 X 1.30 X 2.45 X 3.48 LIVING 3.35 X 1.30 0.45 M.W. CHA BEDROOM 2.45 X 0.30 3.43 X 0.93 JJA 0.55 M.W. CHA JJA SIGNATURE 0.45 M.W. CHA LIVING & DINING NAME AND ADDRESS OF LICENSED SURVEYOR (L.S) CHAJJA 4.05 X 3.48 PASSAGE & DINING 3.35 X 6.10 TOILET JJA 3.43 X 0.93 3.35 X 6.10 1.53 2.00 50% VOID 0.45 M.W. CHA JJA X 2.45 & 50% S.S. JJA M 0.55 M.W. CHA BEDROOM M. BEDROO 3.35 X 4.28 3.05 X 3.98 CHAJJA TOILET 1.53 BEDROOM 50% VOID 2.00 X 2.45 M. BEDROO M 3.05 X 3.98 DECK & 50% S.S. 3.35 X 4.28 DECK 3.35 X 1.30 3.35 X 1.30 JJA 0.45 M.W. CHA JJA 0.55 M.W. CHA CHAJJA Shashik Digitally signed by Shashikant Laxman Jadhav DN: c=IN, o=Personal, title=4436, ant JJA 2.00 0.45 M.W. CHA 50% VOID 2.5.4.20=96ea24e3466c15550473 630d8843a8d731e6d1b86679d2 & 50% S.S. d15210387be9f50e48, JJA 0.55 M.W. CHA B-106, Natraj Building, Laxman postalCode=400080, st=Maharashtra, serialNumber=28d8c972d6fe5f6f 07b6902daebcaee524cb190ed30 S P A C E A G E f1e33cde9c2dd15f6a34e, Mulund Goregaon Link Road Jadhav cn=Shashikant Laxman Jadhav Date: 2025.08.14 16:22:23 +05'30' Mulund (w), Mumbai : 4000 080 C O N S U L T A N T S