Annexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE Date: 28-11-2023 To, Ashapura Infratech, Building No.8, Rang Rekha CHS Ltd, Off S V Road, Dahisar (East), 400068. Subject: Certificate of Percentage of Completion of Construction Work of Rang Rekha having MahaRERA Registration Number (Yet to receive) being developed by Ashapura Infratech (Promoter) Sir, I/ We Ar. Ankit M Makani (M/s. Ankit Makani Architects) have undertaken assignment as Architect / Licensed Surveyor of certifying Percentage of Completion of Construction Work of Rang Rekha having MahaRERA Registration Number (Yet to receive) being developed by M/s. Ashapura Infratech. Based on Site Inspection, with respect to Layout / each of the Building / Wing of the aforesaid Real Estate Project., I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A RANG REKHA, Building No.8, Rang Rekha CHSL Shailendra Nagar, Dahisar (East) 400068 Percentage of Actual Sr. No. Tasks / Activity Work Done (As on date (1) (2) of the Certificate) (3) 1 Excavation 0 2 Basements (if any) N.A. 3 Podiums (if any) N.A. 4 Plinth 0 5 Stilt Floor N.A. 6 Slabs of Super Structure 0 Internal walls, Internal Plaster, Floorings, Doors and 7 0 windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 0 Staircases, Lifts Wells and Lobbies at each Floor level 9 0 Overhead and Underground Water Tanks External plumbing and external plaster, elevation, 10 completion of terraces with waterproofing of the 0 Building/Wing Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, 11 plinth protection. Paving of areas appurtenant to 0 Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities.