PROFORMA -B 7/35 CONTENTS OF SHEET . CH AJJA T. W BED 0.45 M R 3.65 OOM 3RD PODIUM FLOOR PLAN, LINE AREA DIAGRAM & AREA X 4.2 A E 1.08 8 M.B ED CALCULATION. 3.65 ROOM X 5.5 50% 300X75MM AL BEAM VO & 50% IDCHAJ S.S. JA TOIL 8 W. C E 1.53 T FINS MS RAILING X 2.4 HAJJ A 5 1.63 X 1.7 2 1.93 MT. B MS RAILING 0.75M T WID X 1.5 3 1.63 X 0.9 0 W.I.W 1.53 . 0.45 E PL X 3.0 5 S X 0.15 ANTE 1.65 1.85 S R BE D 7.48 CK TOIL ET S S 1.83 LIVIN X 1.6 2.9 X 2.7 CHAJ 0 DE 5 G/ D JA 50% 8 1 2 56 S VO & 50% ID RO INING BEAM 2.90 57 2.00 S.S. 0.12 1.8 5 S 55 58 S 7.48 OM X 5.4 S 59 S 8 B ED R 4.08 OOM W. C TOILET- LINE AREA DIAGRAM 54 60 S X 3.6 HAJJ A S B 61 S 5 MT. (FOR WING-1& 6) S 53 B 62 1.83 0.45 B B BEAM 50% SCALE - 1:200 VO 50% ID & 52 55 63 W.C . S B TOILE S.S. JA 1.53 TOIL CHAJ TOIL X 1.8 ET 1.55 T-04 ET 56 X 1.2 2 1.53 3 1.53 X 2.45 51 B X 2.4 50%CHAJJA S 54 B 5 VO 50% ID & BEAM 57 TOILE A HAJJ S.S. B 1.55 T-04 1.08 S B X 1.2 50 58 2 W. C BED PAS S KITC 5.33 AGE 2.75 HEN 53 B R MT. 3.35 OOM TOILET BUILT UP AREA CALCULATION MS RAILING S 49 59 BEAM 0.45 X 1.5 X 3.6 B B X 4.2 3 5 @M UTIL ID-L AND S 48 52 60 ING LEVE L 8 2.23 ITY X 1.45 S B FRD 1 2.90 X 1.85 X 1 NO = 5.37 SQ.MT. 47 61 FO 2.58 YER 1.00 X S 0.75MT W 51 FRD 1.93 S 62 FRD X 1.20 IDE PLAN STO B 50% CHAJ 1.98 RE S S 46 S.S. TER BED 50 VOID JA LIFT 3 W.C 0.98 . X 1.5 X & 50% 2 1.85 X 2.90 X 1 NO = 5.37 SQ.MT. 50% & 1.83 S S E PLANTER BED S 45 B S.S. X 2.80 3 VOID 19 0.75MT WID S 0.45 2.30 50% MT. 44 49 W S IDE S B CHA TOTAL ADDITION = 10.74 SQ.MT. X 20 1.13 43 EVA FIRE X 0.30 JJ 50% S A S 2.40 VO 50% ID & 48 JA CU A BEAM S B CHAJ 21 S @M S.S. T LIF ION ID-L 22 S S 42 63 50% VO LIFT 2.78 T SMO AND ING LEVE DRIVER TOILET (B) = 6.60 SQ.MT. B S S S 41 50% ID & X 2.8 CHE KE L X 2.48 BED S S 0.45 23 S S S S S S 40 B 47 B S.S. 0 2.30 LOB K 2.78 BY C W. C MT. HAJJ R 3.83 OOM 4.14 SQ.MT. 24 X 2.3 TOTAL TOILET (A-B) = 39 B A TOIL 46 X 3.3 0 18 371 MS R 25 38 B 5 2.45 ET A S B B 26 27 28 36 37 B 45 WA Y 372 B 370 LOBB 2.01 FRD 1.00 ILING MT H T X 1.53 M.B B 29 30 31 32 33 34 35 B 44 E DRIVE 373 B SERV 9.85 Y X 2.5 ELE 2.00 0.28 50% A 0.45 1.00 ED 3.65 ROOM AJJA B 2 E CH D MT. X 4.5 17 B I B B 1.00 1.10 E 19 IC 4.45 E LIFT VO 50% ID & W. CHA 6M W 43 369 B X 1.78 8 B 2.00 1.20 JA TOIL 0.90 WID B AC 0.6 M UNITS-2 CHAJ E B X 1.05 20 2.45 T BELOW CH S X 2.8 FOR AJJA AC 2.48 JJ B 42 0.6 M UNITS-1 X S.S. 50% CHAJJA FOY BELOW B VOID CHAJJ FOR 1.53 FRD RAM 0 1.68 ER X 0.60 MT. A & 18 B 50% 406 S.S. B X 1.08 41 64 P TOIL B UTIL 0.45 B B 1.68 E 21 W IT 1.53 T B 1.53 Y 16 40 UP 1.58 .C. X B X PASS B 2.50 B FHC B 1.85 JA 22 B 3.68 AGE FH C 50% B X 1.07 B 1.50 CHAJ 39 B UP VO B B 368 W.C B B S X 1.05 50% ID & JA 1.88 . 23 WIN 17 24 38 374 64 2.00 DN CHAJ 1.53 X S.S. BEAM 25 36 37 ELV . 184 S LOBB BED JJA 15 26 27 28 34 35 375 B 2.25 WAY 2.60 Y X 8.8 STO 2.58 RE KITC R 3.35 OOM CHA G-1 B 29 30 31 32 33 185 X 1.68 B X 4.2 1.08 5 3.35 HEN S IDE S 16 1.50 ELV . B 367 FRD FRD X 2.45 X 3.35 7 MT. 376 1.50 FRD 6M W W 2 LOBB 14 B 377 B 1.50 OM S 65 B 2.60 Y FRD 0.45 B X 6.3 4 IDE D DN 2.00 . RO FRD FOY S E 1.23 R FOY LIV 15 378 ELE X 1.80 B 65 UP FHC X E & DINING B FRD 1.23 R 379 S 366 3.78 3.65 ING RIVE .20 5 S X 13 X 7.3 DE B 4 1.20 3.78 186 W. C MT. FRD 3 3.65 CK 6M WIDE DRIVEWAY SERV 50% HAJJ S VO S B 380 & 50% ID S.S. 2.48 IC 4.45 E LIFT A X 1.53 14 AY 404 403 382 381 B B 187 S 170 S 169 2.00 0.27 2.00 X 2.8 0 STO 2.58 RE X 1.6 BE 12 EW 66 8 KITC 188 B B LIV B 383 B S 171 3.35 HEN & DINING ELV B D B X 2.45 B 1.99 LOBB DR 189 3.65 ING ER S 384 Y B W 13 9.85 1.58 .C. X 7.3 PL AN 11 WI IV 405 B 201 402 FRD 387 386 385 B B 190 S 365 FHC X 2.5 2 LIFT X 1.07 1.08 3 DE 3.65 CK X 1.53 B T B S B 401 FHC S S B 50% UTIL 50% X 3.35 400 395 394 1.50 191 364 X 2.8 VOID VO IT B 1.53 Y BEAM DE 399 0 50% ID & 50% & B 398 @M X WI S 397 396 UP ID-L CHS. S.S.S. 12 B AND 2.30 AJJA 1.85 B S ING DE LEVE JA S B E. L CHAJ ELV. 192 B B EL W.C 1.88 . 6M 363 67 1.20 AC X B B S 0.6 M UNITS 0.7 10 B 193 BED BELOW -2 FOR 1.53 MS RAILING 5M B ELE. 1.5 0 2.25 B S 172 B LIF 0 CHAJJ A AC 0.6 M UNITS- BELOW 1 CH FOR AJJA 50% PASS R 3.35 OOM AJJA 2.30 T S 3.68 AGE 1.00 T ELV. 194 362 VOID E CH S 173 B X 4.2 1.00 X 1.05 FR & 9 11 ELE. 2.0 0 D 196 195 S S 66 S X 2.8 MS R CHAJ JA 50% S.S. TOIL E 2.45 T X 7 WID B UP 1.50 AILIN 1.53 MT. 1.50 G B ELE. 1.5 0.25 P.L. 197 S S 174 361 68 B 1.00 MT H T FOY 0.45 S 1.68 ER 1 0 0.60 S 0.90 S 10 1.5 0.7 388 175 X 1.05 X 1.08 1.68 TOIL E 1.53 T S B X BEAM X 5 FH 389 360 67 @M 2.50 S ID-L CHAJ C 296 391 390 73 AND 50% S 1.5 8 0 393 392 176 S B TER ING LEVE 1.10 JA VO 50% ID & B BED L X 1.78 300X75MM AL B 202 S 69 PLAN R S.S. BEAM S FH B 3.83 OOM C B B 177 S B 359 EL 9 6M B X 3.3 E. FINS 7 S 297 WI DE 200 B B B B S S 178 B 358 S 5 TOIL 2.45 ET X 1.5 M.B ED 3.65 ROOM CHA JJA S B 8 233 B B 298 DR 321 B S S 180 179 B 357 70 68 69 S BEAM 0.45 2.40 X 0.30 3 X 4.5 8 MT. IDE B MT. IVE B WID W B E CHA 181 B JJ A 6 295 WA 356 50% VO 0.45 B 50% ID & B 232 320 182 CHAJ S.S. S JA Y 183 Y S 74 B 299 EWA S B 355 7 281 B 294 B B 354 RIV 71 B 70 5 B B 199 S B I DE D S 293 300 B 353 6M W 75 TER 6 B B B B B 352 FHC S 71 B PLAN 4 B B 301 198 326 B B B 351 B 72 B S B 350 168 5 EW 234 B 292 B 302 319 B 325 B 328 348 349 167 347 S 72 3 76 S B BEAM AY B B B FHC 291 B 318 B S 4 DE 231 235 B B 303 324 327 S B 346 DR B 2 B IV B B 290 B 317 B 323 B S WAY 77 B S 3 B 5M 236 304 330 WI B B TER WI ME DE B 316 B B PLAN IDE D 1.6 P SH EL EX OW 289 322 B 166 345 1 6M 5 X AF E.5 DR 237 HA C US 305 B 329 T B EL S B RIVE 5.7 T AY B E.3 IV E 343 B 0 2 1.5 0 FH C WA 288 315 340 1.5 RIVE 1.5 0 306 151 0 B 78 B B 0.4 0 .25 B S 344 B STAMP AND DATE OF RECEIPT OF PLAN SE 5M FR Y 238 B RV 50 D UP W IC UP X125 E S T. 342 B B 1. 5 B 2.2 287 W LA 84 VC FIN B 0 314 6M B A 6M W ID S DN 5 E 1 339 B331 CH 307 A B 150 S WI AJ JA M .B 4.2 ED 169 2.2 5 239 B B B DE DN 1.5 0 DE D B 1.6 79 B T 313 0.4 1.2 OILE 7 x RO UP 5M 3.2 OM 2 X T-1 CL 286 338 DFR 5 S B DR 1.5 L UB 74 C T. FO HAJJ 308 5 B 149 W 0.6 UN R A A 0 B T M ITS- C 1.2 OILE 170 B ID IV BE 1 2.5 IFT 6M W FH 85 LO 2 X T-2 240 E W C FO HAJJ 1.5 152 B C 5 B B 0.6 UNITR A A CH EW 5 CL B BE 285 1.6 TER C T M AJ S- 1.5 OIL BE 2 0X 312 I LO 3 .6 D R PLAN W EL JA 2 x ET 2.1 U 337 0.30 5 x OO 3 .0 M 5 1.0 0.8 0 X 2.5 0 CH 168 171 B 0 2 LIF B .50 T 241 B B B 309 P2 S AY V. EL S 0.58 153 V. 80 B AJJ 3 B EL 1.2 DEC PA T A X 2.1 E. 284 311 P3 336 341 86 75 B 7x K 1.0 SS 1.5 0 x . 1.5 OIL B B 0 B B 109 S B B230 2 x ET 3.2 7 1.0 172 EL 242 B TO FILE NO. 0 2.4 0 E. 5 BE 154 B CH 1.0 AM 283 310 AJ T S J 0 SHAF 2.9 @ 76 A LI 2X M 110 335 S LE ID- VI N 5 .6 G & 0.9 2 U 1.8 TIL 2 X IT DIN G VE LA L N B167 173 B B229 243 B B S 87 S 81 B P-17708/2023/(124 AND OTHER)/R/S WARD/AKURLI-R/S 155 B B 0 1.0 Y 1.2 DE 5x D 1.2 282 7 x CK 3.2 3.2 ININ 0 G 5 104 6M B S 111 334 S K B B 148 0 2.2 ITC LI VI 7 X HE 3.0 N S WI 174 B228 244 S 156 77 73 TER B NOTE:- N CH JJA 5 .6 G & 5 DE S 333 S S PLAN 0.30 A 5 x DI 166 B B 112 147 S 83 3.2 NIN DR B227 S 1) ALL DIMENSIONS ARE IN METER. 0.58 B W ID RA E BE 0 G 2.7 2X 3 .0 L IF MP IVE 175 245 157 82 B 5M B 88 UP 3.6 DR 0X T 2) THIS PLAN IS DIGITALLY SIGNED AND PHYSICAL SIGN NOT REQUIRED B S T. B 1.2 0.4 5 x OO 2 2.4 103 WA 113 B332 B S 2.7 F.R 3.0 M B B226 146 2X .D 5 B B 3) THIS CANCELS THE EARLIER APPROVAL ONLINE ISSUED UNDER NO P-17708/2023/(124 AND . 5 S 176 S 1.2 Y C FO HAJJ 08 AJ 2 .9 2X 0.6 UN R A A 2 246 158 SHAF B M ITS- C JA B165 T BE 1 S PA OTHER)/R/S WARD/AKURLI-R/S DATED -24.02.2025 F.R 280 LO 3.0 LIF C 0.9 W FO HAJJ CH 1 . 0 SS 1.5 0 x . 2 0.6 UNITR A A M S- C .D . 0X T 114 24 6M S BE 2 E 07 FR .40 165 LO 7M 145 B B W B225 K W 7 2.4 S ID D 2.2 ITC 177 WI 4) THIS DRAWING SHALL BE READ IN CONJUNCTION WITH LETTER ISSUED UNDER NO 247 S 1 .0 7 X HE 5 5M M 0.8 0 X 159 WI B DE T. .B T 3.0 N 0.4 4 .2 E D 7 x RO 3 1.5 OIL 2 x ET 5 CH AJ CH 102 DE S 279 L. G LV NDIN P-17708/2023/(124 AND OTHER)/R/S WARD/AKURLI-R/S. ON EVEN DATED AJ 115 D-LA 3 .2 O M 2.4 JA SE Ra 2-W S 164 AT MI B B224 144 JA BEAM S S 5 S R 5.23 B U 1.8 TIL 2 89 A .44 0 4.7 VIC 178 248 AJ RAMP J -W A 160 CH 2 X IT 1 .0 Y 3 X E LI Ra tio B 278 B 1: YR 11 EV F 2.4 FT 164 ti A S T 5 VOID 1.5 OIL AC IR 1.5 o1 116 :8 Y R U E S 5 0 143 B A 2 x ET B223 2.8 LIF AT 2.6 PA 8 B MP 78 2.5 5 X T ION 179 S 1.0 5 0 2.9 0 X SS. 249 AM B 0 2.3 JJA FRD A AJJ EL VOID B CH BE 0 S CHA S A E 1.0 5.1 163 0 M P 277 S @ 0 SM M LE ID- 1.2 C O C FO HAJJ 5 117 IDE L HE CK 142 A B B 0.6 UNITR A A UP CHAJWID B222 VE LA MT. 180 JA BE E C PLAN FOR APPROVAL C 2.8 OB CK 0.45 M S-1 W L N BE M LOW HAJJ 250 CHAJ .W. B DIN 5 X BY C FO HAJJ L OW JA 3 2.40 MT. EL 0.45 B X 0.30 0.45 VOID CH 161 M LIFT 0.6 UNITR A A 2.0 1.20 2.2 CHAJ .W. G V & 276 0 S S C S 0.3 0 M AJ S.S. 162 BE -2 JA L. 50% LO 0 JA X 2.8 G LV 50% P W NDIN CH D-LA 25 ASS PL AT MI B B221 2.33 0.5 A P4 90 BEAM B JJ 2.0 DN 0 .S BED 2.0 181 5M A FH .47 A 3 FH 0 251 1.6 HA B B 162 C R T. 4.4 0 2.00 X GE 3.83 OOM C FT 2.00 B S W 2.5 ELV CH ID E 5X MS 1.0 RAIL 0 M IN CH 0 2.0 2.0 0 DN 2.6 0.3 0 156 161 1.5 0 275 1.5 0 TO 2.00 LOBB 3 X 3.3 TOIL 2.45 ET A 0.3 3.9 1.5 0 B B220 79 Y 5 JJA 0 TH G AJ 3 2.4 LIFT BE 8 0 1.5 P3 9.85 X 1.53 S EL 3.8 DR T 2 JA V 2.0 G 182 252 0 6M 0 0.2 163 VOID X 2.5 X 2.8 VOID B CH 0.9 0 DIN 0.5 5 S M.B 0 X OO B 5M 1.6 2 2.4 2.35 ED AJ @ 3.3 M 0.9 2 7 UP 2.6 PA 2 .0 JA M LE ID- VE LA 155 0 WI 274 2.2 5 1.5 2.48 ELV 3.73 ROOM AJJA 5 160 WI 0 0 50 0 L N DE 1.5 JAID 0 X SS. B 1.00 141 X 4.5 B219 % U 183 S BEE EL 50 VOID % S.S & CH AJ JA 50 % 1 50 VOID.20 1.2 TIL 7 X IT 1.8 Y 2.0 5.1 E AM BE DE EL P2 B UP 1.20 1.00 0.93 8 LOC WH B E. X 1.05 T DR TOIL 5 CHAJJ 8 . 2.4 OI % 0 UP FOR A CH FOR AJJA ET X 1.6 B 5 % S.S. T 2.9 AC S.S & 5 154 TCH. AJ 0.6 M UNITS- AC 0.6 M UNITS-1 2.4 OI 5 X LET 2.45 BELOW 2 5 X LET . SE DR EL UP O 5 DN 50% VOID BELOW W Digitally signed by SANTOSH Digitally K 1.6 0 X .91 1.5 3.3 ITC R 4.7 VIC 159 E. P3 118 IVE 139 SERV 50% & X 1.53 2.85 signed PANKAJKUM Digitally signed by & 50 CH 0.45 S.S. B ROHIT 1 .5 140 91 B218 2 5 X HE FHC IVE AJ 1.0 CH FH RAMP B VOID 3X EL IC M JA 2 P F.R 06 DN 2.00 UTIL TOIL 2.4 N 1 1 1.6 .TO 2 X ILE 5 .D . 2.4 IFT AJ JA 184 C T WA FH B FRD 4.49 E LIFT W 1.58 .C. 1.53 ITY VOID 1.53 ET ROHIT by SANTOSH X .05 B 153 WA PANKAJKUMAR B B X 1.8 PASS X 2.5 1.8 P 1.5 T 5 C X 2.8 S S 0 UTTAMRA UTTAMRAO RAUT 50% 3.4 ASS Y SURESHCHA SURESHCHANDRA X 1.08 7 3.65 AGE AR JA 2 1 05 1.6 6 X AG 2 X .22 2.8 LIF 158 FR 119 3 W.C CHAJ G-2 F.R X 1.05 Y 138 80 . LILACHAND B 8X B217 1.0 E 1 3.0 .D D 1.88 0X T B BE 1.6 X .24 7 . X 1.5 3 185 FR SONAR 3.3 CH 5 3 3.6 DR 7 5 1 X . 22 2.2 FO AJJ A 253 D S LOBB BED Date: 2025.08.18 LILACHAND JADHAV 0.6 UNITR A B B B JJA NDRA SONAR Date: 2025.08.14 3.0 0 O RAUT 16:24:58 +05'30' 5 X OO 3 .0 L I F M S-1 C Y R S 273 STO 3.40 OOM BE 7 LO 2.60 S 0X T CH 4.5 M 120 MTCH. AJ W 2.58 RE FO AJJ 1.20 X 8.8 W. C MT. KITC 152 137 R A 6 T 1.5 OI 0.6 UNITA M S-2 C 2.4 157 HAJJ X 1.68 3.35 HEN 1.08 X 4.2 WJAID Date: 2025.08.18 B X 3.35 B216 A 17:39:10 +05'30' BE 2 X LE P4 8 WIN 186 JADHAV LO BE K W 5 2.4 T 3.3 DR LI 3.3 ITC 254 X 2.45 E CWH BELO B 1.20 5 VI 5 X HE 04 F.R W. C M. A 14:09:27 +05'30' S 0.4 B 5 X OO LOBB 5M N 2.4 N .D O 272 HAJJ 3.6 G & B S . A 4.2 M 3.0 LIF Y T. 5 151 121 136 92 W CH ID AJ 5X D 0X T 2.7 P3 2.60 B 8 B215 0.45 E JA CH A JJA 50 % 50 VOID 6.5 ININ 5 G U 2.4 5 C FO HAJJ 0.6 UNITR A A 7X 1.2 2 187 T B VOID X 6.3 2 FRD 4 FOY ER LIV B % 0.4 1.2 TIL M S-1 C SERV & DINING 271 1.23 B148 A.E.(B.P) R- S 7 X IT BE S S C E.E.(B.P.)WS-II 'R-1' S.S & 5M B S.E.(B.P)R-2 FO HAJJ 1.8 Y IC LO X 3.7 4.48 E LIFT 0 W . T. LI 0.6 UNITR A A 3.65 ING 1.7 W ID VI 5 M S-2 C 150 122 135 81 FRD 7 B K X 7.3 B214 BE BE E CH N 2.2 ITC LO W FRD 5 FOY 3.6 G & S X 2.8 3 S A 188 0 M 8 X HE FHC ER 0.3 AJ 0 1.0 DE JA 1.23 3.0 N 3 3 B 5X D 1 3.80 CK X .24 5.8 X 3.7 6.5 ININ S 5 7 B 270 3.3 CH 1 50 .20 DN X 1.53 0 5 P 123 AJ 1.0 MS 3.6 DE 5 G 1.6 .TO 2 X ILE JA % 50 VOID 1.0 RAIL LI 149 2.00 STO B 0.7 B213 5 X CK % 0 M IN V UP 1.5 T S.S & U 3.2 DIN ING 5 189 2.58 RE S TH G 1.8 TIL C . 0.7HAJJA 7M B 1.4 2 @ 0 X 1.68 T 5 X IT 2 3 CH 1.2 0 X IN / X .97 5 KITC 93 M 1.0 Y 147 S 269 LOBB AJ LE ID- 0 G P 3.4 ASS T 2.4 OI 5 X LET JA VE LA L ND IN 8 5.6 5 3. 2 7 CH AJJ A 50 % 50 VOID B WI 124 AY B LIFT 3 9.85 Y 3.35 HEN X 2.45 LIV & DINING B T 212 B DE 6 X AG 1.5 G 2.4 OIL % X 2.5 B 3.65 ING S.S & X 2.8 2.48 B 190 1.0 E 2 5 X ET W 6M AM 1.0 CH 3.6 DE 1.58 .C. AJJ . 106 RIVE 0 X 7.3 BE A 5 X CK 3 PA 1.5 2.35 S 2 2-W 268 VOID 2.00 X 1.0 3 DE S 1.0 2.1 SA 1.0 BE Ra 3.80 CK 1.4 G WI B CH 0 1.0 8 X E 3 ELV 8 125 AJJ 3 3.3 DR BE W 0 A X .91 2.9 DE 2 ti AY X 1.53 B S 2.00 DE B211 o1 1.1 5 X OO 3.8 DR T 1.08 B 1.0 5 X CK 0 UTIL 2.5 OI 4.2 M 1.6 8X 1 0 X OO 3.3 M 1.2 BE 0 X LE T 146 191 255 :8 RA ING LV 3 1.53 ITY X 3.35 D LIFT L. 2 8 3.0 DR 1 .5 ND 1.6 D-LA 2.00 X 1.87 S AT MI 7 5 5 X OO 2 RIV MP 134 B BEAM X 2.8 IDE D JA 126 0.5 94 B 8 0.3 S CHAJ 3.6 M 1 0 JJA 0.4 X .05 0.3 8 W.C 2.33 50% 5M T. W ID T 1.5 OI 1.8 2 2.5 5X ID E CH A 0.6 5 M .B 3.2 ED 0 X RO CH 0.7 5 8 0.5 0.2 G IN 101 E WA 192 B B210 B B EVA FIRE CUA FRD 1.20 R AC 0.6 M UNITS-1 A BELOW CHAJJ FO R AC 0.6 M UNITS-2 A BELOW CHAJJ FO S.S. 1.88 X 1.5 3 . BED JJA 256 R AJJ E @ 5 0.28 T 3.40 OOM 2 X LET LIF ION W T A 0M PASS S CH T 3.3 OM 2.5 OIL M VOID CHA 133 1.00 T. B 1.8 A 2.4 OI LE ID- JJA 2.4 5 X LET 5M T. W 3 0 X ET 5 VE LA S Y 127 83 FRD 2.83 T SMO 1.00 & 3.65 AGE X 4.2 6M W 5 ID L ND X 2.50 CHE KE X 1.05 0.5 1.5 VOID IDE B 8 1.5 E B209 50% 3 145 S CK TOIL B CH B BE CH 2 0.7 LO ET 2.83 BBY AJ 3.0 5 AM 193 MT. 0 AJ 2.45 1.7 JA 1.1 95 JA 0 JA 257 CH 0.3 0X AJJ 0.7 0 X 2.30 X 1.5 W CHAJ 50 % 50 VOID BE 50 % 0.6 0M 0.9 T 2.4 OIL A 6 S B 3 B 50 VOID 5 % S.S & 3.6 DR % S.S & T. W 5 X ET 100 128 98 RAMP 0.45 B 5 X OO IDE B208 . 1.5 B . CH 0.93 TOIL BE 4.5 M 3 FH AM AJ 1 194 84 X 1.05 X 1.6 ET S M X .08 6 JA .B 3.2 ED 1.0 0 C 258 99 L. NDIN G LV 8 1.53 X 2.5 JA S PA 0 X .98 2.85 3.0 0 X RO 3.3 OM 2 S 1.1 SA G 3.2 W 0.45 129 96 S D-LA AT MI BEAM CHAJ 50% & VOID 0X 3 1.0 0 X E 8 .C M 144 B TER BED 50% S.S. B 0.4 B207 B 2 HA T. PLAN R 5M 0.4 0.30 T. W 5M 0.9 5 BE 3.0 DR JJA 195 S 3.83 OOM ID T .W 259 X 3.3 B S E CH 5 X OO M.B ID A JJA E CH 3.6 M LI V 3.2 DIN ING W 0.45 .C M UP 99 130 S 5 TOIL ED JJA 3.73 ROOM 2.7 2.45 ET AJ B HA T. B206 JA 5 W 0.60 S 3 108 B JJA 85 CHA 2.0 0 X ING / X S 196 X 1.53 .C M 0 1.2 82 0 X 4.5 HA T . 0.3 SHAF 5.6 3 7 JJA 260 97 WAY B143 S T 5 S B 8 WID X 0.30 0.4 5M K FR 131 AJJA E CH 2.40 E B 2.2 ITC S D B205 T. WID MT. B W MT. 8 X HE ID 197 0.45 VOID 2.0 2.0 E 3.0 N & CH AJ JA 2.9 DE 5 EL 0 0 DN FR 98 261 107 B 132 S RIVE SHAF S.S. 50% 50% 0.45 5 X CK 11 LOB E D 86 100 T 1.2 2 U 1.8 TIL 5 X IT 1.0 Y 3 .0 LIF 0X T .44 BY X2 .60 2.4 8 FR D S 142 198 B B204 B 267 S 87 S B 6M W FO CH 8 2.4 UP 262 B R A 0.6 AC JJA M U BE NIT 5 EL V LO S-1 W 141 B B 1.9 2.6 LOB B203 B IDE D 1.1 5 199 FO CH 3.0 LIF 101 PLAN R A 5 0 X BY W 0.60 AC JJA 1.0 0.6 M U BE NIT @ LO S-2 W IN G 0X T FH C 5.1 .C M HA T. 263 B 266 B TER B 0 M JJA LE ID- 0 2 .4 5 VE LA 1.2 EN 5 140 265 B B202 L ND BE AM T RO RAN OF CE SE W 200 264 FT HA JA BE LO LO BB R 4.7 VIC 3X EL IN SE R 137 B 139 S PL .S 102 G- T 4.7 VIC 201 B DESCRIPTION OF PROPOSAL & PROPERTY SHAF 2.4 IFT CH AJ W Y 3X EL AY 6M WIDE DRIVEW E 5 2.4 IFT ID 5 W 0 0.3 1.2 B 0 C B T. 5M 5X 5 2.6 LOB FH 136 105 2.5 0 BE 1.0 PROPOSED DEVELOPMENT ON PROPERTY BEARING CTS NO. 124, 0.5 0 X BY G 3.8 DR IN ELE. ROOM B138 U FO CH BE NIT @ 0 X OO 1.0 R A LO S-2 2.8 LIF 7.7 M 103 W 0 AC JJA LE ID- 3.3 M 5 & 50 50 VOID % % S.S 5 CH AJ 50 % FO CH R A BE NIT AC JJA M 0.6 U LO S- W 1 0.6 M U 1.2 TIL 8 X ITY 0X T 2.2 0 FH C 3.0 LIF 0X T 2.4 BE AM VE LA L ND B 135 FRD B 125,126,127, 127/1, 128, 146, 146/1, 146/2, 146/3, 146/4, 146/5,146/6, 146/7 OF . JA 50 VOID 1.8 FR T % 5 TER 1.2 T 2.4 OIL S.S & D 11 LOB 5 AY VILLAGE AKURLI , R/S WARD, MUMBAI-400101. 6M WIDE DRIVEW 3 2.4 OIL 5 X ET . PLAN .44 B B 5 X ET 1.0 1.5 CH K 3.3 ITC EL X2 Y 1.5 3 1.0 0 X 3 3 AJ JA 5 X HE FR D V .60 3.0 LIF 0X T 134 104 0.30 2.7 1.6 W 3 X .C. 2.4 N 5 6 UP 2.4 106 105 0.58 107 B 3X P FR B 1.0 5 1.0 3.4 ASS 1.5 D EL 5 B 0.7 X 3 8 X AG 1.2 B 7 5 1.2 E BE 3.0 3 X 5 1.0 E 108 B133 3.6 DR 1.6 3.3 4 X 109 B 8X 3 8 B 5 X OO 5 1.2 1.9 DN 2.0 4.5 M 0.6 2 3.0 3 X 5 0 111 110 NORTH JOB. NO. DRG. NO. DRAWN BY 6 8 T 1.5 OI 0.3 112 113 B 0 3 X L ET EV F A B132 B K 2.4 AC IR 2.4 BE 3.3 ITC B U E 5 3.3 DR 5 X HE 8 2.8 LIF AT 121 B FR 0.4 LI 2 .4 N 2.0 122 7/35 D 5 X OO 5 X T ION B 573 4 Prachi 5M 0 T. W ID CH AJ 4.2 M VI N 3.6 G / 5 2.3 0 W 0.60 .C M 2.7 124 123 B HA T. 125 E JA CH 8 5 X DI 2.0 FR JJA 3X 126 B A 50 UT 0 D 1.2 JJA 6.5 NIN SM 88 B & % IL 3 50 VO 1.2 8 X ITY W 0.47 C OC 127 89 B SCALE DATE CHECKED BY % ID 0.5 5 G L HE K B S.S 5M 1.8 .C M B N FO CH 0.6 . HA T . 2.0 T. 5 M R A 2.8 OB CK 128 B 0 W U JJA ID E CH LI VI BE NIT LO S-2 W AC JJA 5 X BY 2.2 K 2.2 ITC 129 90 - S AJ N FO CH 0 8 X HE 1. 2 130 B JA M R 3.6 G / 0 S 0.6 AC AJJ W 0.47 3.0 N U 3.3 4 X 1.0 131 Ninad 0.3 BE NIT B A .C M 91 LO S- 5 X DI 5 W 1:300 HA T. 0 5 CH 50 1 3.6 DE 6.5 NIN AJ % JJA FHC 92 S JA 50 VOID 1.0 5 X CK B 5 G 1.6 W % S.S & 0 LI 3 X .C. V 0 B 1.1 1.4 U 3.2 DIN ING . 3 1.5 1.8 TIL 0.7 114 REVISIONS DESCRIPTION : 0 1.2 6 5 X IT 0 0 X IN / 115 G 3 S X .98 CH DIN 1.0 Y AJ FO C 0.7 R HA G S JA @ 3.2 5 116 0.6 AC JJA CH T 8 5.6 8 2.4 OIL M UN A M JJ P LE ID- BE IT A RAMP 3.4 ASS 5 X ET VE LA L S OW -1 5 T 2.4 OIL 1.8 8 117 0.45 M.W. CHA 8 X AG 1.5 L N 5 3.6 DE 1.0 FO C B PA 0.5 0 1.0 E R HA 5 X ET 118 AM 5 X CK 3 3 BE 0 0.6AC JJA M U BE NIT S 1.1 SAG 1.5 0.2 5 .28 0.7 94 93 119 B R-0 B 1.4 BE 1.0 1.0 0 X E LO S-2 LANDING 3 3 3.3 DR 1. 0 0 W 2 1.0 CH AJJ 5 0.3 8 120 DING M. BEDROO M BEAM @ MID- A 1.0 0 X BE 2.9 DE X 8 LAN 3.95 X 3.20 B 0.5 5 X OO BE 1.0 BEAM @ MID- TOILET 8 3.8 DR 5 X CK T 4.2 M 3 2 2.5 OIL 95 B 0 X OO 3.0 DR S B 2.7 1.2 0 X ET 1.40 JJA S LEVEL 8 3 5 X OO B 2 X 3.3 M X 2.33 LEVEL 1.6 1.5 8X 0.6 2 1.0 5 5 0.5 3.6 M 5 3 97 96 0.38 9.5 0.5 2.5 5M 1.00 LANDING S JJA 5M 5 T. 1.00 0.45 M.W. CHA T. T 1.0 X BEAM @ MID- 1.5 OI 5 0.3 W W 0.7 X 0 ID 0.93 3 X LET 1.20 ID E 0.4 CHAJJA S E 7 CH 5M FOR AC UNITS-1 X 1.00 T M TOILET CH 0.6 M BELOW 2.4 S AJ 2.4 OIL AJ CHAJJA T. .B BED ROOM JA 5 FOR AC UNITS-2 5 X ET W 3.2 ED 1.40 LEVEL CHAJJA JA RAMP PASS. 0.6 M BELOW ID 0 X RO 1.5 3 E CH 3.3 OM LIFT X 2.28 0.93 3.65 X 3.05 UTILITY 2 CH 3.0 2.17 AJ 3.45 X 3.72 AJ 3 X 1.50 0 JA 2.0 JA 0.4 0X 0.30 & 50 % 5M 1.83 X 1.08 50 0.9 & %V BE 50 VOID T. 12 2.00 LANDING 0 0.3 50 OID % 3.6 DR % S.S W 5 2.00 2.87 S.S 5 X OO . ID 11 BEAM @ MID- . E 9 10 TW 4.5 M PASSAGE CH X 0.93 6 1.2 3 AJ JA 7 8 TW FHC 6 TW TW 2.60 X 6.72 LEVEL 5 TW KITCHEN TW 2.20 LIFT DECK 4 2.13 X 2.75 NAME AND ADDRESS OF DESIGN ARCHITECT 3 LIFT LIVING & 1.27 0.4 2 TW LIFT 2.70 X 2.50 LANDING 5M 1 TW TW 2.70 X 2.50 DINING X 3.05 2.75 X 2.50 5.48 X 3.05 T. TW BEAM @ MID- DN 2.17 W ID E CH TW TW FRD JJA AJ JA 0.30 FOYER KAPADIA ASSOCIATES UP LEVEL 2.03 0.45 M.W. CHA M TOILET 3 M. BEDROO 1.40 0.47 2.00 2.00 FRD 2.58 X 1.23 3.95 X 3.20 X 2.33 LIFT 1.00 1.00 FOYER DECK 3.45 X 3.72 2.20 18 LIVING & 16 17 4 2.58 X 1.23 WING-3 1.27 DESIGN LLP, PAREL(E), FRD 1.20 FHC PASSAGE DINING CHAJJA X 3.05 15 TW 1 FOR AC UNITS- TW CHAJJA 5.48 X 3.05 0.6 M BELOW 14 TW 2 FOR AC UNITS- 0.93 2.60 X 6.72 13 0.6 M BELOW X 1.00 TOILET JJA 1.40 CHAJJA TW TW MUMBAI - 400012. X 2.28 UTILITY DN TW PASS. 1.83 X 1.08 KITCHEN 0.45 M.W. CHA 2.03 0.75 0.63 BED ROOM 0.93 FOYER FIRE 2.13 X 2.75 1.62 FRD UP 0.75 7 FRD 2.87 JJA 2.03 1.15 50% VOID N 3.65 X 3.05 X 1.50 LIFT 1.15 & 50% S.S. 2.58 X 1.23 EVACUATIO X 0.93 0.45 M.W. CHA 0.75 1.50 UP LIFT 1.62 LIFT 2.75 X 2.50 0.63 0.75 1.50 BED ROOM CHAJJA 2.87 50% VOID LIFT 2.70 X 2.50 FRD 2.45 X 2.70 PASS. X 0.93 KITCHEN 2.13 X 2.75 2.70 X 2.50 & 50% S.S. CHAJJA CHAJJA TOI. 0.73 X LIFT LIFT 3.20 X 2.50 DN UTILITY 0.93 X 1.50 3.65 X 3.05 G CHAJJA TOILET 2.28 X 1.38 TOILET 3.23 LIVING KITCHEN 1.83 X 1.08 CHAJJA 1.40 FOYER TOILET 2.28 X 1.38 2.13 X 2.75 3.20 X 2.50 2.20 0.93 3RD PODIUM FLOOR PLAN & DINING WING-4 X 2.28 PASSAGE 4 TOI. 2.28 X 1.38 SMOKE X 1.00 LIVING & FRD 2.58 X 1.23 0.73 2.28 X 1.38 SAGE 1.00 PAS 0.93 3.25 X 5.48 FHC CHAJJA 2.60 X 6.72 2 X X CHECK FOR AC UNITS- CHAJJA DINING X 0.93 1.53 0.6 M BELOW DECK FOR AC UNITS-1 JJA LOBBY 3.23 LOBBY 1.20 0.6 M BELOW 1.27 5.48 X 3.05 FOYER 8 FRD 2.45 X 2.43 0.45 M.W. CHA 0 20.71 X 2.6 2.58 X 1.23 1.00 2.00 X 3.05 LIVING PASSAGE 2.00 1.00 X 0.93 UTILITY 1.00 1.53 X 0.93 FRD TOILET M & DINING M 1.73 X 1.05 2.17 M. BEDROO M. BEDROO LAN LANDING KITCHEN LIFT 0.30 1.40 0.40 BEAM @ MID- 3.25 X 5.48 BEDROOM 3.95 X 3.20 0.38 FOYER 7 LIFT 2.13 X 2.75 3.00 X 0.78 BEAM @ MID- M X 2.33 M. BEDROO FRD 1.20 3.20 X 3.60 2.58 X 1.23 LIFT 3.20 X 2.50 3.00 X 0.78 3.20 X 3.18 3.05 X 3.65 CHAJJA 1.20 LEVEL 2 G FOR AC UNITS- CHAJJA 0.6 M BELOW 3.20 X 3.18 1 3.20 X 2.50 G FOR AC UNITS- LEVEL DECK LIVING & BEDROOM 0.6 M BELOW FRD CHAJJA FRD 0.6 M BELOW 3.00 X 1.28 FRD 0.92 UP DINING FIRE 2.03 3.05 X 3.65 DING 0.6 M BELOW DECK UTILITY 1.00 5.48 X 3.05 N 0.98 5 UTILITY 1 LANDING 6 LANDING EVACUATIO 1.27 1.20 FOR AC UNITS- KITCHEN DN 1.73 X 1.05 SCALE- 1:300 JJA 1.08 CHAJJA BEAM @ MID- BEAM @ MID- X 3.05 LIFT 0.45 M.W. CHA CHAJJA 0.93 0.6 M BELOW 2.13 X 2.75 2 PASSAGE KITCHEN X 1.85 2.45 X 2.70 FOR AC UNITS- JJA JJA 1 FOYER DECK 0.45 M.W. CHA 0.45 M.W. CHA 1.00 FOR AC UNITS- FOYER 3.05 X 2.45 UTILITY 2.60 X 6.72 CHAJJA 1.23 NAME OF THE OWNER FHC KITCHEN LEVEL SIGNATURE 1.23 LEVEL 2 2.87 3.00 X 1.28 FOR AC UNITS- 1.20 1.08 1.20 LOBBY CHAJJA CHAJJA X 3.08 0.6 M BELOW 0.6 M BELOW 1 3.05 X 2.45 FOR AC UNITS- X 3.08 X 0.93 2.20 ENTRANCE 2 0.6 M BELOW X 1.85 FOR AC UNITS- 1.00 CHAJJA JJA LIFT W 0.45 M.W. CHA ROOF BELO 1.00 0.98 UTILITY PASS. SMOKE 3.20 X 3.60 JJA 0.45 M.W. CHA 2.45 X 0.30 1.83 X 1.08 LANDING 0.45 M.W. CHA 0.93 CHECK 2.00 TOILET BED ROOM TOILET LOBBY 2.00 TOILET BEAM @ MID- X 1.50 CHAJJA 1.53 BEDROOM CHAJJA 3.65 X 3.05 1.40 M/S. GODREJ PROPERTIES LIMITED CHAJJA 2.45 X 2.43 1.20 1.53 1.20 X 2.45 4.05 X 3.48 2 FOR AC UNITS- 0.93 X 2.28 FRD X 2.45 2.17 0.6 M BELOW G Naveen CHAJJA CHAJJA 0.98 LEVEL 1 0.6 M BELOW 1.00 FOR AC UNITS- Digitally signed by Naveen Kumar X 1.00 0.6 M BELOW FRD FRD TOILET X 3.48 FOR AC UNITS-1 TOILET 1.53 Poddar JJA CHAJJA DN: c=IN, o=Personal, title=4539, 1.00 1.00 0.40 1.20 6 5 UTILITY CHAJJA 1.53 X 2.45 0.98 PASSAGE pseudonym=2C73FC5F2E2B7925E38E DING 0.6 M BELOW 1.08 2 1.00 JJA X 2.45 X 3.48 510365EAED7E, LIVING 2.45 X 0.30 BEDROOM Kumar FOR AC UNITS- 3.43 X 0.93 2.5.4.20=c4ab3e3029b611d0ee305bf1 KITCHEN 0.45 M.W. CHA TOILET X 1.85 LAN CHAJJA FOYER LIVING & DINING 0.45 M.W. CHA BEAM @ MID- 4.05 X 3.48 be8e9e585efd1c35dddc8cbb7be302b 0.6 M BELOW FOYER 3.05 X 2.45 0.92 1.40 0.47 1 UTILITY 1.23 3.35 X 6.10 7645de981, postalCode=829107, M X 2.33 FOR AC UNITS- KITCHEN 1.23 & DINING TOILET M. BEDROO st=Jharkhand, 1.08 X 3.08 PASSAGE 3.05 X 2.45 3.35 X 6.10 LEVEL CHAJJA X 3.08 serialNumber=4DFD3EABDED1FC5945 3.95 X 3.20 Poddar X 1.85 3.43 X 0.93 1.53 0.6 M BELOW CHAJJA F4A0ADE513DDAB1EE27A53C2B3292 0.93 X 2.45 FOR AC UNITS-2 ABB9ED3B03B2064C3, cn=Naveen M Kumar Poddar M. BEDROO 0.45 M.W. CHA BEDROOM Date: 2025.08.14 15:28:19 +05'30' 2.45 X 0.30 JJA 1.20 TOILET 3.35 X 4.28 TOILET BEDROOM 3.05 X 3.98 CHAJJA CHAJJA 1.53 1.53 X 2.45 X 2.45 4.05 X 3.48 TOILET 0.98 JJA 1.53 BEDROOM 50% VOID 2.00 TOILET TOILET 1.53 X 3.48 X 2.45 M. BEDROO M 3.05 X 3.98 DECK & 50% S.S. 1.53 X 2.45 0.98 PASSAGE 3.35 X 4.28 DECK 3.35 X 1.30 X 2.45 X 3.48 LIVING 3.35 X 1.30 JJA BEDROOM 2.45 X 0.30 3.43 X 0.93 JJA 0.55 M.W. CHA JJA 0.45 M.W. CHA LIVING 0.45 M.W. CHA & DINING CHAJJA 4.05 X 3.48 PASSAGE 3.43 X 0.93 & DINING 3.35 X 6.10 3.35 X 6.10 TOILET 1.53 X 2.45 2.00 50% VOID & 50% S.S. 0.45 M.W. CHA JJA NAME AND ADDRESS OF LICENSED SURVEYOR (L.S) SIGNATURE JJA M 0.55 M.W. CHA BEDROOM M. BEDROO 3.35 X 4.28 3.05 X 3.98 CHAJJA TOILET 1.53 BEDROOM 50% VOID 2.00 X 2.45 M. BEDROO M 3.05 X 3.98 DECK & 50% S.S. 3.35 X 4.28 DECK 3.35 X 1.30 3.35 X 1.30 JJA 0.45 M.W. CHA JJA 0.55 M.W. CHA Shashika Digitally signed by Shashikant Laxman Jadhav nt DN: c=IN, o=Personal, title=4436, 2.5.4.20=96ea24e3466c15550473630 d8843a8d731e6d1b86679d2d152103 87be9f50e48, postalCode=400080, Laxman st=Maharashtra, B-106, Natraj Building, serialNumber=28d8c972d6fe5f6f07b 6902daebcaee524cb190ed30f1e33cd e9c2dd15f6a34e, cn=Shashikant Jadhav Laxman Jadhav S P A C E A G E Date: 2025.08.14 16:22:06 +05'30' Mulund Goregaon Link Road Mulund (w), Mumbai : 4000 080 C O N S U L T A N T S