PROFORMA -B 5/35 WING -6 36.17 BUILT UP AREA CALCULATION FOR 1ST PODIUM FLOOR (WING-5) 1ST FLOOR A 38.70 X 14.02 X 1 NO = 542.57 SQ.MT. WING -5 1 4.57 T2 4.58 CONTENTS OF SHEET 1.85 2 0.35 TOTAL ADDITION = 542.57 SQ.MT. X 2.9 3.35 1.62 2 0.77 0 T1 3.65 4.81 11.44 7.03 1 2 3.65 2.90 2.90 1ST PODIUM FLOOR PLAN, LINE AREA DIAGRAM & AREA CALCULATION. 3.30 DEDUCTIONS 1.8 3 3.37 1 5 2.52 2.52 2.75 3 4.31 1 4.81 X 5.12 X 1 NO = 24.63 SQ.MT. LL1 2 6 2.75 T3 2 11.44 X 2.52 X 1 NO = 28.83 SQ.MT. LINE AREA DIAGRAM FOR 1ST FLOOR. (METER ROOM) 0.45 4.82 1 2.90 LINE AREA DIAGRAM FOR 1ST FLOOR. (METER ROOM) 5.12 1.02 2.90 6.98 ST1 3.35 5.0 7.12 3 7.03 X 6.69 X 1 NO = 47.03 SQ.MT. TOILET- LINE AREA DIAGRAM (WING-1 & 6) SCALE - 1:200 SCALE - 1:200 8 3 6.69 14.21 11.04 0.65 2.30 7.32 8 8.50 4 0.15 X 1.23 X 1 NO = 0.18 SQ.MT. SCALE - 1:200 LINE AREA DIAGRAM FOR 1ST FLOOR. (METER ROOM) 3.05 1.20 0.50 LL1 2.51 5 5.45 X 7.32 X 1 NO = 39.89 SQ.MT. LL2 A L1 2.95 5 METE OOM BU LT UP A EA CALCULAT ON BU LT UP A EA CALCULAT ON SCALE - 1:200 T6 1.59 1 T P CAL FLOO T P CAL FLOO 4.82 ST1 6 0.05 X 1.52 X 1 NO = 0.08 SQ.MT. 7.08 2.60 1 . 3. 1 NO 1 . 8 S .MT. 2 . 8 3. 1 NO 1 . 2 S .MT. BU LT UP A EA CALCULAT ON 5 0.15 0.55 LL2 2.60 0.49 7 3.45 X 0.50 X 1 NO = 1.73 SQ.MT. ED 6.43 LL3 2.95 11.74 0.15 TOTAL A T ON 1 . 2 S .MT. 2.7 1.37 1.58 TOTAL A T ON 1 . 8 S .MT. T P CAL FLOO A 8 2.70 X 1.37 X 1 NO = 3.70 SQ.MT. 13 1.73 1.22 LL12 4 TOILET BUILT UP AREA CALCULATION 3 2. 3.3 1 NO .21 S .MT. 0.30 LL4 2.95 2.80 1.56 2.80 0.65 2.60 2.60 2.95 2.80 14.02 LINE AREA DIAGRAM FOR 1ST FLOOR. (METER ROOM) L2 L1 LL6 0.45 0.30 9 1.41 X 2.85 X 1 NO = 4.02 SQ.MT. LL7 LL10 LL11 TOTAL A T ON .21 S .MT. LL3 1.82 5.45 1.23 0.30 0.45 0.45 4.76 LL5 SCALE - 1:200 LL11 10 1.31 X 2.75 X 1 NO = 3.60 SQ.MT. LL13 1 2.90 X 1.85 X 1 NO = 5.37 SQ.MT. 2 6.48 1.52 11.43 1.31 0.30 4.81 6.43 3.30 6.43 3.25 5.0 8 3.25 LL 11 15.93 X 0.46 X 1 NO = 7.33 SQ.MT. 8.59 LL82.95 1.41 4.50 1.95 3.13 4.58 BU LT UP A EA CALCULAT ON 3.25 FD 6.43 1.41 0.05 8 T P CAL FLOO 2.80 LL12 2.95 20.30 12 8.59 X 2.99 X 1 NO = 25.68 SQ.MT. 2.95 2 1.85 X 2.90 X 1 NO = 5.37 SQ.MT. 2.75 T5 2.97 18 7.10 2.60 LL LL10 2.95 LL 2.95 LL 2.80 .08 2. 1 NO 13. S .MT. LL8 3.25 13 0.30 X 1.58 X 1 NO = 0.47 SQ.MT. L4 L2 9 2.85 1.08 0.35 0.30 6.26 6.78 4.46 TOTAL DEDUCTION = 187.17 SQ.MT. Y1 T4 5 TOTAL A T ON 13. S .MT. 5.49 2.7 TOTAL ADDITION = 10.74 SQ.MT. X 6.48 1.36 3.25 4.84 4.83 0.45 2.95 L3 LINE AREA DIAGRAM FOR LG, UG & 1ST TO 4TH FLOOR. (METER ROOM) LINE AREA DIAGRAM FOR UG, 1ST TO 6TH FLOOR. (METER ROOM) 1 6.48 TOTAL BUILT UP AREA [X - Y1] = 355.40 SQ.MT. X1 LL9 ST2 LINE AREA DIAGRAM FOR 1ST FLOOR. (METER ROOM) SCALE - 1:200 SCALE - 1:200 2.65 DRIVER TOILET (B) = 4.40 SQ.MT. B SCALE -BU LT 1:200 LINE AREA DIAGRAM FOR 1ST FLOOR. (METER ROOM) 0.46 2.52 LL L 2.95 D1 2.99 UP A EA CALCULAT ON LL14 0.20 2.75 13 2.85 LIFT AREA CALCULATION METE OOM BU LT UP A EA CALCULAT ON 12 SCALE - 1:200 10 TOTAL TOILET (A-B) = 6.34 SQ.MT. T P CAL FLOO 3.25 TYPICAL FLOOR 2.70 T P CAL FLOO BU LT UP A EA CALCULAT ON 1.36 ST2 4.82 LL13 4.82 11.89 L1 11.74 X 2.95 X 1 NO = 34.63 SQ.MT. 8.59 3.30 2.60 15.93 6.77 11 3.25 1.31 1.37 8 3.45 7 . 0 1. NO 2. S .MT. T P CAL FLOO . 8 2. TOTAL A 1 NO T ON 12. 0 S .MT. 12. 0 S .MT. BU LT UP A EA CALCULAT ON T P CAL FLOO TOTAL A T ON 2. S .MT. 8 12 .2 3.13 NO 8. 8 S .MT. 3.05 1 1.20 0.50 L3 2.82 L2 3.25 X 2.95 X 1 NO = 9.59 SQ.MT. .08 2. 1 NO 13. S .MT. 2.52 0.50 L TOTAL A T ON 8. 8 S .MT. 0.55 L3 3.30 X 5.49 X 1 NO = 18.12 SQ.MT. 38.70 TOTAL A T ON 13. S .MT. 3.25 6.83 2.60 3.30 L4 8.59 X 2.97 X 1 NO = 25.51 SQ.MT. 5.65 10 5.90 LINE AREA DIAGRAM 1ST PODIUM FLOOR PLAN. (WING 5 ) 12 TOTAL LIFT AREA PER FL. (TYPICAL FLOOR) = 87.85 SQ.MT. Y2 SCALE - 1:100 1 4.30 150M 1 3.30 11 3.38 STAIRCASE AREA CALCULATION M TH KB E RCC TYPICAL FLOOR PAR LOCK W 1.03 0.35 1.62 1 3.03 1.26 15.97 8.59 ST1 7.08 X 4.82 X 1 NO = 34.13 SQ.MT. DI ALL ST2 6.77 X 4.83 X 1 NO = 32.70 SQ.MT. LINE AREA DIA. FOR 1ST PODIUM FLOOR. (WING- 6) SCALE - 1:100 TOTAL STAIRCASE AREA PER FL. (TYPICAL FLOOR)= 66.83 SQ.MT. Y3 B 2.35M LIFT LOBBY AREA CALCULATION WIDE RETA TYPICAL FLOOR IL PL BUILT UP AREA CALCULATION FOR 1ST PODIUM FLOOR (WING-6) ALL AZA OCK W LL1 2.90 X 2.52 X 1 NO = 7.31 SQ.MT. L BELO A 36.17 X 20.30 X 1 NO = 734.25 SQ.MT. LL2 2.60 X 2.30 X 1 NO = 5.98 SQ.MT. THK B W TOTAL ADDITION = 734.25 SQ.MT.X LL3 2.95 X 0.65 X 1 NO = 1.92 SQ.MT. 150MM I RETAIL-18 STILT AR D 17 RCC P AIL- LL4 4.81 X 2.95 X 1 NO = 14.19 SQ.MT. DEDUCTIONS BELOW 1 1.02 X 3.30 X 1 NO = 3.37 SQ.MT. LL5 0.30 X 1.37 X 1 NO = 0.41 SQ.MT. RET OW W BEL ELO RETA LL6 6.43 X 2.80 X 1 NO = 18.00 SQ.MT. 150MM THK BL 2 1.62 X 0.35 X 1 NO = 0.57 SQ.MT. LL7 3.30 X 2.60 X 1 NO = 8.58 SQ.MT. OCK WALL LA ZA B 16 IL BELO -19 AIL P AIL- RET OW LL8 2.95 X 0.65 X 1 NO = 1.92 SQ.MT. 3 14.21 X 4.31 X 1 NO = 61.25 SQ.MT. RCC PARDI R ET W TOIL IDE ET-2 BEL LL9 2.60 X 4.84 X 1 NO = 12.58 SQ.MT. 1.22 X 1.55 4 0.50 X 1.20 X 2 NOS = 1.20 SQ.MT. W LL10 6.43 X 2.80 X 1 NO = 18.00 SQ.MT. .35M 15 LIFT-01 2 AIL- TOIL 5 11.04 X 1.59 X 1 NO = 17.55 SQ.MT. ET-1 RET OW LL11 3.25 X 2.60 X 1 NO = 8.45 SQ.MT. 1.22 X 1.55 BELOW BEL 6 2.90 X 0.77 X 1 NO = 2.23 SQ.MT. LL12 1.56 X 1.22 X 1 NO = 1.90 SQ.MT. LL13 1.41 X 1.73 X 1 NO = 2.44 SQ.MT. 14 7 6.98 X 3.37 X 1 NO = 23.52 SQ.MT. AIL- 8 4.76 X 8.50 X 1 NO = 40.46 SQ.MT. LL14 3.25 X 2.52 X 1 NO = 8.19 SQ.MT. RETA RET OW R-ST03 TOTAL LIFT LOBBY AREA PER FL. (TYPICAL FLOOR) = 109.87 SQ.MT. Y4 IL- BOXING 13 BEL 9 0.30 X 2.95 X 1 NO = 0.89 SQ.MT. B E L O 01 LOW AIL- BELOW RETA 2.35M WIDE TAIL PLAZA BE RET OW IL 0 W BELO -20 DUCT AREA CALCULATION LIFT RETA RET 10 8.59 X 5.90 X 1 NO = 50.68 SQ.MT. IL- AIL PLAZA BE LOW 2.35M WIDE RE BEL X 2.8 BELO 02 2 TYPICAL FLOOR W AIL-1 2.30 11 15.97 X 3.38 X 1 NO = 53.98 SQ.MT. D1 0.20 X 1.08 X 1 NO = 0.22 SQ.MT. W RET W EVA FIRE CUA 12 1.26 X 5.65 X 1 NO = 7.12 SQ.MT. ED 6.43 X 0.45 X 1 NO = 2.89 SQ.MT. BE L O LIF LIF TION 2.30 T 2.78 T RETAIL RETAIL-11 SMO X 2.48 CHE KE 13 1.36 X 2.85 X 1 NO = 3.88 SQ.MT. FD 6.43 X 0.45 X 1 NO = 2.89 SQ.MT. S -03 X 2.8 LOB K 2.78 BY C 0 14 3.03 X 4.30 X 1 NO = 13.03 SQ.MT. TOTAL DUCT AREA PER FL. (TYPICAL FLOOR) = 6.00 SQ.MT. Y5 65 LIFT-01 BELOW RETAIL-04 RETAIL-05 LIFT-01LIFT LOBBY RETAIL-10 BELOW B X 2.30 FRD 15 1.62 X 0.35 X 1 NO = 0.57 SQ.MT. BELOW BELOW RETAIL-07 RETAIL-09 BELOW BELOW BELOW ELEC TRIC 2.00 NET BUILT UP AREA = 84.85 SQ.MT. S BELOW RETAIL-06 RETAIL-08 ROO AL M 2.00 0.28 16 1.03 X 3.30 X 1 NO = 3.40 SQ.MT. [X1 - (Y2+Y3+Y4+Y5)] 64 B BELOW BELOW BELOW BELOW LIFT-02 32 SERV ICE L 17 0.55 X 3.05 X 1 NO = 1.68 SQ.MT. E BELOW FRD 4.45 X 2.8 IFT 2.48 2.00 0 B FRD 1.20 18 0.15 X 7.10 X 1 NO = 1.07 SQ.MT. S 7 R-ST01 W. CH M. AJJA 19 0.55 X 3.05 X 1 NO = 1.68 SQ.MT. 63 B up BELOW B 1.50 UP FHC UP S R-ST02 2.00 TOTAL BUILT UP AREA [X - Y1] TOTAL DEDUCTION = = 288.13 SQ.MT.Y1 446.12 SQ.MT.X1 62 B 6 BELOW B B 31 . ELV G-1 DN 30 2.25 . FRD 1.50 FRD B ELV WIN LIFT AREA CALCULATION S 5 STAIRS TO RET AIL 1.50 L1 11.43 X 2.95 X 1 NO = 33.72 SQ.MT. 61 B TERRACE FOR ODU SER B 29 1.50 323 DN OM VICING L2 0.30 X 2.80 X 1 NO = 0.84 SQ.MT. B 28 . RO .80 FRD 34 B UP 2.00 S 4 8 B ELE 1 B 1 L3 3.25 X 2.82 X 1 NO = 9.16 SQ.MT. B 27 4.20 X 35 33 S 0.60 L4 11.89 X 2.95 X 1 NO = 35.08 SQ.MT. 60 B B B 26 SERV W. CH MT. AJJA LAND S 3 B B FRD B B 25 36 B 2.00 2.48 4.45 ICE L IFT SCA LOBB PE L5 3.30 X 2.52 X 1 NO = 8.32 SQ.MT. 59 B Y B B B DN B B B 24 37 B S 103 322 X 2.8 0 Y TOTAL LIFT AREA PER FL. (TYPICAL FLOOR) = 87.12 SQ.MT.Y2 WA B 23 B 0.28 2.00 IVE B 2.00 6M W STAIRCASE AREA CALCULATION 2 9 22 DR 10 20 21 38 B B FHC CHAJ B JA B M.W 0.45 IDE D ST1 7.12 X 4.82 X 1 NO = 34.32 SQ.MT. 19 FRD 0 DE 13 S.LIFT 16 17 FHC 18 39 JA LIFT ST2 6.83 X 4.82 X 1 NO = 32.92 SQ.MT. 14 15 UP 1.50 B CHAJ X 2.8 1 WI 1.50 2.30 RIVE 1.92 X 2.75 1.50 Spac IDE 40 e fo B E. ELV. MT. EL TOTAL STAIRCASE AREA PER FL. (TYPICAL FLOOR) = 67.24 SQ.MT.Y3 6M EW AY 73 321 HVAC r Lobby W AY DRIV WAY 41 B 0 E. 1.5 11 2.25 B Trans 1.20 LIF LIFT LOBBY AREA CALCULATION EL B ELV. 6M WID E 2-W 72 B fer 2.30 T LL1 2.90 X 2.51 X 1 NO = 7.28 SQ.MT. BE E. 0 FR D 42 B X 2.8 0 B EL 2.0 575MM WIDE LO UP 1.50 1.50 1.50 43 LL2 2.60 X 0.49 X 1 NO = 1.27 SQ.MT. W E. 0.25 P.L. B 71 320 B EL 1.5 0 B PLANTER BED 1 LL3 1.31 X 1.82 X 1 NO = 2.38 SQ.MT. SE 1.5 0.7 12 FH 44 T 5 1.5 FH C 115 C 6M WIDE 2-WAY DRIVEWAY 45 B B 70 LL4 1.36 X 2.95 X 1 NO = 4.01 SQ.MT. 300X75MM DG 0 B 319 LL5 3.25 X 2.60 X 1 NO = 8.45 SQ.MT. S EL E. 116 6M 50 B 46 B B 69 B ALUMINUM FINS B B 68 LL6 6.48 X 2.80 X 1 NO = 18.14 SQ.MT. 58 117 WI DE 48 47 B LL7 3.25 X 2.65 X 1 NO = 8.61 SQ.MT. 143 DR 49 B LL8 2.95 X 3.25 X 1 NO = 9.59 SQ.MT. B 118 IVE B 67 318 B 57 B WA B B B 66 B TRF LL9 0.35 X 3.25 X 1 NO = 1.14 SQ.MT. 144 Y B B & HT PA LL10 6.78 X 2.80 X 1 NO = 18.98 SQ.MT. S 56 B 119 B B 64 65 EWA Y 317 T1 & NEL ROO B 114 S B DRIV B T2 BE M LOW FOR LL11 0.30 X 0.45 X 1 NO = 0.14 SQ.MT. 142 120 63 IDE ENT LL12 4.46 X 2.95 X 1 NO = 13.16 SQ.MT. S B B B 62 6M W LOBB RANCE LL13 2.60 X 4.82 X 1 NO = 12.53 SQ.MT. B 141 66 B B FHC 316 Y BE LOW B B 121 B 51 B B B TOTAL LIFT LOBBY AREA PER FL. (TYPICAL FLOOR) = 105.68 SQ.MT.Y4 B 140 113 B 61 102 74 145 B 57 60 DUCT AREA CALCULATION SE Y B 122 B 52 B 101 S D1 6.48 X 0.45 X 1 NO = 2.92 SQ.MT. TB WA B 139 112 B S B EL DE 146 B 123 53 56 D2 6.48 X 0.45 X 1 NO = 2.92 SQ.MT. OW 209 B B B 75 TOTAL DUCT AREA PER FL. (TYPICAL FLOOR) = 5.84 SQ.MT.Y5 DR IVE B 5M 147 B B 138 124 111 54 B S 315 NET BUILT UP AREA = 180.24 SQ.MT. DG WI ME WI B B B 59 B B B [X1 - (Y2+Y3+Y4+Y5)] 1.6 P SH EL DE 137 110 100 76 6M 5 X AF E.5 DR 148 B B B 125 55 S B 314 5.7 T 0 EL E.3 IVE 136 109 B 58 B RIVE FH WA 0 B B S 80 1.5 0.2 C B 126 89 1.5 0 B 0.4 5 Y B 85 77 B WAY 5M T. 1.5 1.5 0 FR D 149 UP 2.2 W 0 135 108 6M 79 313 S ID CH E B DN B B 127 84 90 88 WI 5 B ELOW AJ JA M .B 210 2.2 5 150 B B B DE DN 1.5 IDE D 4.2 ED T 1.2 OILE 1.6 0 107 0.4 5 7 x RO 2 X T- B UP CL 134 B 87 DR FR 5 3.2 OM 1.5 4 B B MT. D L UB 1.5 128 UG 83 OFF B 5 T 0 1.2 OILE B W B IV 0 CH ID E BE T 2 X T-3 1.5 5 211 2.5 IFT 0X CL 151 133 B TO 86 EW FH C 1.6 5 B 6M W 312 AJ JA 3.6 DR 1.5 OIL B B 106 AY EL B L UB 2 x ET 2.1 5 x OO B 129 86 V. B 2.5 P1 3.0 M 1.0 0.8 0 X 0 212 0 2.5 IFT 152 B B EL DROP 261 S 5 CH 3 0.4 A AJJ 7 0X E. 132 105 87 V. B EL 3.2 DEC 0x K 1.2 PA 1.0 SS 1.5 0 x . T 1.5 OIL 2.1 0 208 B B 55 85 78 311 B 2 x ET 1.0 7 7 2.4 5 FO C R H 0.6 AC AJJA 0 1.0 213 E. EL 153 B S 88 B B CH C 131 104 M UN AJJ BEL IT 0 B 2.9 O S- FH S A S W 1 LI 2 FO C B B 54 84 X B ENT R H VI 0.6 AC AJJA 0.9 B M UN U N 154 LOBB RANCE BEL IT 2 1.8 TIL 260 207 S O S- 5.6 G & 214 310 W 2 2 X IT 1.2 3.2 DEC 5x D 3.2 ININ 1.0 Y 0 130 89 B Y BE S S 5 0x K 1.2 7 0 G K 2.2 ITC 7 X HE 28 B B 206 155 B B 53 82 B 83 LOW LI 215 JA VI N 5.6 G & 3.0 N 5 B FH S S 90 S B S AJ CH 5x D 3.2 ININ C 259 B B B 52 81 82 B E 156 B ID 205 S W 0 G 2.7 M T. BE 3.6 DR 2 X 1.2 3.0 LIF 0X T 216 7M 91 309 0.4 5 5 x OO 3.0 M 2.7 2 .D . 2.4 27 B B B WI S 51 80 S 81 B 2X F.R 5 204 DE B 6M B S 5 8 JA AJ PA 2.9 2 X 1.2 2 B 258 217 157 2-W 103 WI 92 Spac S e fo 0.9 3.0 LIF S S .D 1.0 SS B B B Ra 50 CH . E 1.5 0 x . 2 F.R 7 0X T 27 DE HVAC r Lobby 6M 32 tio AY B 79 B 99 ID 7 K 2.4 .80 .70 2.2 ITC T. 218 158 2-W Trans S W 1.0 5 5M M .B 4.2 ED 0.8 0 X T 1.5 OIL 7 X HE 3.0 N CH 26 B WI 203 1 :8 RA 102 Ra AY 93 fer S CH tio S 3 B 0.4 7 x RO 2 x ET 5 DE MP S 3 . 2 OM 0 2.4 5 A U 1.8 TIL AJ JA SE R AJJA FR D FR D DR B 159 B 49 B 78 1: 8 RA 98 308 S 4.7 VIC 219 AJJ CH 2 X IT 3X EL 202 MP 94 S IVE Y T 1.0 EV F 2.4 IFT T6 B 101 S B S 5 S AC IR B B C 1.5 OIL 2 x ET F HA U OR JJA 0.6 NIT AC M BELS- 1 U E 2.8 LIF AT 5 -E LE WA 48 77 2.5 RO CTR 220 B 2 C 5 X T ION OW FO HAJJ 201 Y S 1.0 0 160 R A S 0.6 UNIT A OM IC CHAJ C D CH AJJ 0.4 A 7 0 1.0 M B S- EL 2 OW 2.3 0 FR AL 100 S JA B B B S STAMP AND DATE OF RECEIPT OF PLAN 0 1.2 SM UP MT. 47 0 CH OC WID E K 2.8 LOB CK W 221 B 76 PL CHAJ E 161 S JAM.W SH 200 0.45 5 X BY AF LIF 2.30 T 0 1.20 2.2 2.0 IN 99 95 T 0 FR 0.3 0 DN 257 B B B S PL P2 307 2.00 X 2.8 0 S 2.0 D 2.0 0 DN G- 0 0 2.0 T6-TRANSFORMER 222 199 162 1.6 0 98 B . SH AF T TO 96 B 2.00 0.28 0 2.0 D 6 2.4 8 0.3 0 BELOW B 256 223 B B 198 1.5 0 1.5 0 6M 1.5 1.5 0 0.2 S P1 3 S 2.48 2.00 LIFT X 2.8 0 163 0 97 0 0 2.4 FR 2.0 0.5 5 8 1.6 2.30 WI 97 S 0 B B UP 2.0 2.2 1.5 255 UG 5 B 0 0 0 224 1.5 DE 75 2.0 0 262 197 EL E. TO DR UP 2.00 UP DN B S SE EL UP IVE 1.6 B B 46 FILE NO. R 5 4.7 VIC 254 E. FH P1 W 74 306 SERV 3X EL 2.4 IFT 263 B 225 196 C AY FH DN B B FRD IC 4.45 E LIFT 5 B B +23.88 M FFL C X 2.8 P-17708/2023/(124 AND OTHER)/R/S WARD/AKURLI-R/S 2.8 LIF 0X T 2.2 B 226 B 195 FR D 164 B +23.80 M SFL S 45 D FR B 73 72 4 S -2 0 WIN 0 3.0 LIF B 264 96 FRD B S 0X T LA ND 2.4 5 B 5M P2 44 B S 71 0.60 W. CH MT. AJJA NOTE:- 227 194 WI 165 ELEC G 1.20 SC 265 DE 95 TRIC ROO AL W. CH M. AJJA 1) ALL DIMENSIONS ARE IN METER. BE APE LO LO 3.0 LIF 0X T 2.4 B 228 B B 193 DR IVE P1 TO S 43 B S 70 305 B M 2) THIS PLAN IS DIGITALLY SIGNED AND PHYSICAL SIGN NOT REQUIRED 5 SERV W BB B W 94 ICE L 3) THIS CANCELS THE EARLIER APPROVAL ONLINE ISSUED UNDER NO P-17708/2023/(124 AND Y B T5 -TR 253 229 B 192 AY S 42 B S 69 5 S 4.45 X 2.8 0 IFT FRD LAND OTHER)/R/S WARD/AKURLI-R/S DATED -24.02.2025 AN DN SCA BE SFO LO R W ME R B 230 B B B S 41 93 B S UP 2.00 LOBB PE Y 4) THIS DRAWING SHALL BE READ IN CONJUNCTION WITH LETTER ISSUED UNDER NO P-17708/2023/(124 AND OTHER)/R/S WARD/AKURLI-R/S. ON EVEN DATED 252 191 304 B B 190 B 7M S 40 92 WAY B LIFT X 2.8 0 2.48 231 166 S 2.30 B WI 91 2.00 VO I D B 251 232 B 189 167 B DE 2-W S 39 RIVE 0 0.28 2.00 S LIFT Ra 2.00 B B B S 38 67 B PLAN FOR APPROVAL X 2.8 tio AY 303 24 .40 1: RA IDE D 2.30 EVA FIRE FRD 25 B 233 188 168 8 MP 68 B B CUA T LIF ION B B B S 37 7 B 2.78 T X 2.48 SMO CHE EK S 250 6M W S LO CK 234 187 169 302 2.78 BBY X 2.30 6M B B T5 VO 24 FH WI DE 235 B B S 36 8 299 &T EN ID B C 186 170 S 298 Digitally signed S DR B B B S 301 SANTOSH by SANTOSH T 6L RA NC 249 IVE 35 EL RA 236 OB B ROHIT Digitally signed OB MP B YB U P WA 185 171 B S PANKAJKUM Digitally signed by UTTAMR UTTAMRAO YB EL 23 Y B 34 by ROHIT EL OW 2.0 0 B 237 B B S S 9 SURESHCHA SURESHCHANDRA PANKAJKUMAR OW 184 172 31 300 6 AR RAUT S 0 LILACHAND 248 S S 0.3 LO B B B B 33 NDRA SONAR AO RAUT Date: BY 238 S B Date: 2025.08.14 LILACHAND JADHAV 2025.08.18 2.0 B 183 0 0 2.0 UP 173 SONAR DR O 3.0 LIF 2.4 FR D FR D FR 22 247 B B B 30 B S 32 11 S 10 297 17:38:31 +05'30' JADHAV Date: 2025.08.18 14:08:52 +05'30' 16:24:15 +05'30' PO 0X T 8 D 239 174 S B FF 2.4 5 DN EL EC RO TRIC S B B 182 B B 179 S WING -3 BE 2.0 OM AL 246 B A.E.(B.P) R- S 0 LO W 0 3.0 LIF 0X T 2 .4 AJ JA B 240 B 181 175 178 296 B S.E.(B.P)R-2 E.E.(B.P.)WS-II 'R-1' B 1.2 CH 5 245 177 W B 241 180 HA FT 176 S SE .S R 4.7 VIC 3X EL IN SE R 266 244 242 B PL 295 VO ID 2.4 IFT 5 G- 4.7 VIC 3X EL 2.4 IFT VO ID 267 B 6M WIDE DRIVEW AY B 1.50 MS SE R 5 5 B 29 ELE. ROOM FH C 1.65 8 0.70 2 B VIC ES LA B 2.8 LIF 0X T 3.0 LIF 268 243 FRD 294 12.72 3.13 1 3.25 0.50 5 2.2 0 D FR 0X T 2.4 5 B B LL2 0.83 2.80 3.75 3.45 4.42 4 5.65 L1 5.70 6 3 AY B 6M WIDE DRIVEW 1.22 B 269 293 DESCRIPTION OF PROPOSAL & PROPERTY DN 3.0 LIF LL1 3.95 4.05 3.72 3.72 0X T 2.4 291 292 8.37 9 3.12 D1 L 1 7 0.45 1.98 5 290 ST1 0.45 24 3.05 7.05 2.0 UP B 270 288 289 MS RAILING 0.82 4.98 0.49 B 2.0 LA 0 0 287 B B 0.50 ND L3 SC 2.4 8 0.3 0 EV AC FIR U E 271 282 B B 0.75MT WIDE PLANTER 3.10 ST2 3.10 LL3 2.50 L 2 2.50 L 3 L 3.00 2.85 PROPOSED DEVELOPMENT ON PROPERTY BEARING CTS NO. 124, BE APE 2.0 0 2.8 LI AT 0 X FT ION CH F.R .D. B 280 281 B L2 2.49 0.30 B 279 B 125,126,127, 127/1, 128, 146, 146/1, 146/2, 146/3, 146/4, 146/5,146/6, 146/7 OF 2.3 0 AJ 4 2.7 ALUMINUM FINS 3.16 2.75 2.70 2.69 LO LO 2.0 0 FR JA 3X 277 278 4.85 0.70 2.60 9.55 W BB D SM 1.2 3 276 13 12 0.30 2.86 VILLAGE AKURLI , R/S WARD, MUMBAI-400101. CH OC 16.25 1.7 0 Y 2.8 LOB ECK K 275 B 14 0 X BY 2.2 K 2.2 ITC 274 B B 20.00 2.92 10 LL6 2.92 2.59 LL5 2.95 LL4 A 23 6.80 B S 0 8 X HE 273 S 3.0 N 272 B NEL ROOM 0 B 0.3 5 FHC B 15 B TRF & HT PA 16 1.15 LI S 0.15 MS LL12 1.45 BELOW 0 SE V 1.1 B U 3.2 DIN ING RV IC ES VO 1.2 0 1.8 TIL 5 X IT 0 0.7 6 FOR T3 & T4 L6 1.15 S 0 X ING / LA B X .98 LL4 1.0 Y 0.7 DRAWN BY ID 286 S NORTH JOB. NO. DRG. NO. 3.2 B 5 285 C F HA U OR JJA 8 5.6 8 0.23 3.10 B 3.13 2.50 2.50 LL7 ST4 3.10 0.6 NIT A 3.32 2.70 S- C M 5 L 8 L 284 BEL 1 OW C FO HAJJ T 1.8 8 2.4 OI 283 0.45 M.W. CHA 1.0 0.6 UNITR A A 5 S- C 5 X LET 0.5 0 0 17 M BEL 2 PA 5 .28 OW S 1.5 1.4 SA 18 573 0.2 3.20 3.20 Prachi 1.0 0.7 0 2.9 DE 1 3X E .02 G 0 3 X .75 5 0.3 8 0.5 MS RAILING 19 PARKING ELECTRICA L M. BEDROO 3.95 X 3.20 M 3.85 2.60 0.70 2.47 2.85 5/35 7.05 7.05 8 5 X CK T TOILET L5 ST3 3.05 1.2 BE 1.0 2 2.5 OIL 0 X ET S B B +23.80M SSL FRD ROOM 1.40 JJA 22 S S SCALE DATE CHECKED BY 2 3.0 DR 5 X OO 1.5 3 0.75MT WID E PLANTER 21 20 B B 0.47 X 2.33 8.55 3.13 LL8 3.13 D2 2.57 LL10 8.35 16 0.50 N - 9.5 3.6 M 3.60 19 0.45 M.W. CHA M FRD 1.00 1.00 0.93 L 5 .B 3.2 ED L ROO M Space for Lob by X 0.60 Ninad 12 T3-DG PANE FINS CHAJJA S 0 X RO 0.45 -1 ALUMINUM FOR AC UNITS 3.3 OM HVAC Transfer 0.6 M BELOW TOILET 5.58 11 2.85 0.78 0.05 5.65 1:300 S 1.20 CHAJJA 2.80 LL11 BED ROOM 2 FOR AC UNITS- 3 1.40 3.11 CHAJJA PASS. ST5 0.6 M BELOW 1.15 18 BELOW 3.65 X 3.05 LIFT 3.20 X 2.28 0.93 3.70 0.83 LL9 4.55 4.43 2 UTILITY DESCRIPTION : 3.0 2.17 3.30 REVISIONS 3.45 X 3.72 JJA 3.25 0 1.7 0 X 1.90 21 X 0.30 1.83 X 1.08 2.80 14 2.75 15 0.3 0.9 2.00 17 0 5 0.20 1.65 y PARKING Space for Lobb 2.00 2.87 13 +23.80M SSL HVAC Transfer X 0.93 0.70 20 FRD 3.85 11.75 1.87 0.78 1.45 0.45 1.98 0.49 1.23 ELECTRICAL ROOM 2.20 LIFT KITCHEN 2.13 X 2.75 DECK 1.50 R-0 LIFT 2.70 X 2.50 LIVING & 1.27 30.86 FRD LIFT 2.70 X 2.50 DINING X 3.05 2.17 DN FRD 2.85 X 2.50 5.48 X 3.05 1ST PODIUM FLOOR PLAN. (WING 3 ) JJA 0.30 UP FOYER SCALE - 1:100 M 2.00 2.03 3 2.58 X 1.23 0.45 M.W. CHA TOILET M. BEDROO 1.40 2.00 FRD 3.95 X 3.20 X 2.33 0.47 LIFT 1.00 FOYER DECK 3.45 X 3.72 WING-3 1.00 2.20 FRD 4 2.58 X 1.23 LIVING & 1.27 1.20 DINING X 3.05 CHAJJA 1 FOR AC UNITS- CHAJJA 0.93 0.6 M BELOW 5.48 X 3.05 2 1ST PODIUM FLOOR PLAN FOR AC UNITS- 0.6 M BELOW X 0.60 TOILET JJA 1.40 CHAJJA UTILITY DN PASS. X 2.28 KITCHEN 1.83 X 1.08 BUILT UP AREA CALCULATION FOR 1ST PODIUM FLOOR (WING-3) 0.45 M.W. CHA FRD 2.03 FIRE BED ROOM 0.93 UP N 2.13 X 2.75 2.87 JJA 3.65 X 3.05 X 1.90 2.03 EVACUATIO X 0.93 LIFT UP LIFT 0.45 M.W. CHA NAME AND ADDRESS OF DESIGN ARCHITECT LIFT TYPICAL FLOOR LIFT WELL AREA CALCULATION 2.87 LIFT 2.85 X 2.50 FRD 2.45 X 2.70 PASS. BED ROOM X 0.93 2.70 X 2.50 LIFT KITCHEN 2.70 X 2.50 DN 0.93 3.65 X 3.05 A 30.86 X 20.00 X 1 NO = 617.20 SQ.MT. LW1 3.45 X 3.72 X 1 NO = 12.83 SQ.MT. 2.13 X 2.75 LIFT 3.20 X 2.50 UTILITY TOILET X 1.90 SCALE- 1:300 1.83 X 1.08 3.20 X 2.50 2.20 CHAJJA 1.40 TOTAL ADDITION = 617.20 SQ.MT. X LW2 2.75 X 2.50 X 1 NO = 6.88 SQ.MT. WING-4 KAPADIA ASSOCIATES X 2.28 0.93 LIVING & SMOKE CHAJJA X 0.60 CHECK CHAJJA FOR AC DECK DINING LOBBY 1.20 FOR AC UNITS-2 UNITS-1 0.6 M BELOW JJA LW3 2.70 X 2.50 X 1 NO = 6.75 SQ.MT. 8 0.6 M BELOW 1.27 5.48 X 3.05 FOYER FRD 2.45 X 2.43 DEDUCTIONS 0.45 M.W. CHA X 3.05 2.58 X 1.23 2.00 2.00 FRD 1.00 1.00 LW4 2.69 X 2.49 X 1 NO = 6.70 SQ.MT. DESIGN LLP, PAREL(E), 0.47 TOILET M LIFT 0.30 2.18 1.40 M. BEDROO 1 1.22 X 3.25 X 1 NO = 3.97 SQ.MT. FOYER 7 FRD LIFT X 2.33 3.95 X 3.20 LW5 2.47 X 2.70 X 1 NO = 6.67 SQ.MT. 2.58 X 1.23 3.20 X 3.60 LIFT 3.20 X 2.50 2 1.50 X 0.70 X 1 NO = 1.05 SQ.MT. MUMBAI - 400012. LW6 3.20 X 3.60 X 1 NO = 11.52 SQ.MT. LIVING & FRD 3.20 X 2.50 DECK DINING FIRE 2.03 UP 3 0.49 X 5.65 X 1 NO = 2.77 SQ.MT. LW7 3.20 X 2.50 X 1 NO = 8.00 SQ.MT. N 1.27 5.48 X 3.05 EVACUATIO KITCHEN LIFT DN 4 1.98 X 4.42 X 1 NO = 8.75 SQ.MT. BUILT UP AREA CALCULATION FOR 1ST PODIUM FLOOR (WING-4) X 3.05 2.13 X 2.75 LW8 3.20 X 2.50 X 1 NO = 8.00 SQ.MT. LIFT AREA CALCULATION 2.45 X 2.70 5 0.45 X 3.13 X 1 NO = 1.41 SQ.MT. TOTAL LIFT WELL AREA PER FL. (TYP. FL.) = 67.35 SQ.MT. L2 TYPICAL FLOOR L1 3.75 X 4.05 X 1 NO = 15.19 SQ.MT. 2.87 X 0.93 2.20 W 6 4.98 X 5.70 X 1 NO = 28.39 SQ.MT. LOBBY BELO A 30.86 X 20.00 X 1 NO = 617.20 SQ.MT. LIFT TOTAL LIFT AREA PER FL. (L1-L2) = 24.98 SQ.MT. Y2 WING -4 L2 9.55 X 3.00 X 1 NO = 28.65 SQ.MT. ENTRANCE UTILITY PASS. SMOKE 3.20 X 3.60 0.45 M.W. CHA 0.93 1.83 X 1.08 CHECK 7 0.83 X 3.72 X 1 NO = 3.09 SQ.MT. TOTAL ADDITION = 617.20 SQ.MT. X BED ROOM TOILET 2.00 STAIRCASE AREA CALCULATION 0.70 L3 0.30 X 2.85 X 1 NO = 0.86 SQ.MT. X 1.90 CHAJJA LOBBY 2.00 3.65 X 3.05 1.40 CHAJJA 1.20 2.45 X 2.43 FRD 0.30 8 12.72 X 1.65 X 1 NO = 20.99 SQ.MT. DEDUCTIONS X 2.28 FOR AC ST1 4.85 X 7.05 X 1 NO = 34.19 SQ.MT. CHAJJA 2.18 FOR AC L4 2.85 X 3.33 X 1 NO = 9.49 SQ.MT. UNITS-2 UNITS-1 0.6 M BELOW 0.93 0.6 M BELOW 1.50 X 0.60 9 3.16 X 8.37 X 1 NO = 26.45 SQ.MT. 1 1.22 X 3.25 X 1 NO = 3.97 SQ.MT. JJA BBY ST2 0.70 X 3.10 X 1 NO = 2.17 SQ.MT. LANDSCAPE LO L5 3.70 X 7.05 X 1 NO = 26.09 SQ.MT. 1.00 0.83 1.00 2 1.65 2 1.50 X 0.70 X 1 NO = 1.05 SQ.MT. 0.47 10 0.30 X 2.92 X 1 NO = 0.88 SQ.MT. 8 L6 3.85 X 3.13 X 1 NO = 12.05 SQ.MT. TOILET ST3 4.55 X 7.05 X 1 NO = 32.08 SQ.MT. 3.13 BELOW 0.45 M.W. CHA 3.25 1.40 11 3.85 X 5.58 X 1 NO = 21.48 SQ.MT. 1 5 12.72 3 0.49 X 5.65 X 1 NO = 2.77 SQ.MT. TOTAL LIFT AREA PER FL. (TYPICAL FLOOR) = 92.33 SQ.MT. Y2 M. BEDROO M X 2.33 ST4 0.70 X 3.10 X 1 NO = 2.17 SQ.MT. 4 4.42 3.75 2.80 LL2 0.50 4 1.98 X 4.42 X 1 NO = 8.75 SQ.MT. STAIRCASE AREA CALCULATION 3.95 X 3.20 12 1.15 X 8.55 X 1 NO = 9.83 SQ.MT. ST5 0.20 X 1.15 X 1 NO = 0.23 SQ.MT. 5.65 3 6 5.70 13 11.75 X 1.65 X 1 NO = 19.39 SQ.MT. 1.22 NAME OF THE OWNER SIGNATURE 5 0.45 X 3.13 X 1 NO = 1.61 SQ.MT. JJA 0.45 ST1 4.85 X 7.05 X 1 NO = 34.19 SQ.MT. TOTAL STAIRCASE AREA PER FL. (TYPICAL FLOOR)= 70.84 SQ.MT. Y3 3.72 3.95 LL1 3.12 7 L1 6 4.98 X 5.70 X 1 NO = 28.39 SQ.MT. 14 1.87 X 2.80 X 1 NO = 5.24 SQ.MT. 4.05 8.37 ST2 0.70 X 3.10 X 1 NO = 2.17 SQ.MT. D1 1.98 9 15 0.78 X 2.75 X 1 NO = 2.15 SQ.MT. LIFT LOBBY AREA CALCULATION 7 0.83 X 3.72 X 1 NO = 3.09 SQ.MT. Digitally signed by Naveen 3.05 ST3 4.55 X 7.05 X 1 NO = 32.08 SQ.MT. BBY LOW 7.05 LANDSCAPE LO DROP OFF BE Navee Kumar Poddar 24 ST1 LL1 2.80 X 3.95 X 1 NO = 11.06 SQ.MT. M/S. GODREJ PROPERTIES LIMITED 16 1.45 X 8.35 X 1 NO = 12.11 SQ.MT. DN: c=IN, o=Personal, 0.49 4.98 0.82 0.45 8 12.72 X 1.65 X 1 NO = 20.99 SQ.MT. ST4 0.70 X 3.10 X 1 NO = 2.17 SQ.MT. title=4539, 9 3.16 X 8.37 X 1 NO = 26.45 SQ.MT. BELOW 17 0.45 X 3.11 X 1 NO = 1.40 SQ.MT. LL2 0.50 X 0.83 X 1 NO = 0.42 SQ.MT. pseudonym=2C73FC5F2E2B7 0.50 n 925E38E510365EAED7E, L3 ST5 0.20 X 1.15 X 1 NO = 0.23 SQ.MT. 2.5.4.20=c4ab3e3029b611d0 2.85 LL3 2.60 X 3.10 X 1 NO = 8.06 SQ.MT. 3.10 3.10 10 0.30 X 2.92 X 1 NO = 0.88 SQ.MT. TOTAL STAIRCASE AREA PER FL. (TYPICAL FLOOR)= 70.84 SQ.MT. Y3 18 1.98 X 4.43 X 1 NO = 8.77 SQ.MT. ee305bf1be8e9e585efd1c35 LL3 ST2 dddc8cbb7be302b7645de98 3.00 L2 LL4 1.45 X 2.95 X 1 NO = 4.28 SQ.MT. Kumar 1, postalCode=829107, 11 3.85 X 5.58 X 1 NO = 21.48 SQ.MT. LIFT LOBBY AREA CALCULATION 19 0.49 X 5.65 X 1 NO = 2.77 SQ.MT. st=Jharkhand, 0.30 9.55 2.60 0.70 4.85 3.16 12 1.15 X 8.55 X 1 NO = 9.83 SQ.MT. LL5 16.25 X 2.59 X 1 NO = 42.09 SQ.MT. serialNumber=4DFD3EABDE 20 1.50 X 0.70 X 1 NO = 1.05 SQ.MT. 2.86 0.30 LL1 2.80 X 3.95 X 1 NO = 11.06 SQ.MT. D1FC5945F4A0ADE513DDAB Poddar 1EE27A53C2B3292ABB9ED3B 16.25 13 11.75 X 1.65 X 1 NO = 19.39 SQ.MT. LL2 0.50 X 0.83 X 1 NO = 0.42 SQ.MT. 21 1.23 X 3.25 X 1 NO = 4.00 SQ.MT. LL6 2.86 X 2.92 X 1 NO = 8.35 SQ.MT. 03B2064C3, cn=Naveen 2.59 2.92 6.80 Kumar Poddar 10 2.95 23 A LL5 LL6 14 1.87 X 2.80 X 1 NO = 5.24 SQ.MT. 22 0.50 X 3.05 X 1 NO = 1.53 SQ.MT. LL7 2.60 X 3.10 X 1 NO = 8.06 SQ.MT. Date: 2025.08.14 15:24:48 LL4 2.92 20.00 LL3 2.60 X 3.10 X 1 NO = 8.06 SQ.MT. LL8 2.80 X 3.13 X 1 NO = 8.76 SQ.MT. +05'30' 15 0.78 X 2.75 X 1 NO = 2.15 SQ.MT. LL4 1.45 X 2.95 X 1 NO = 4.28 SQ.MT. 23 0.23 X 6.80 X 1 NO = 1.56 SQ.MT. 1.45 LL12 1.15 LL9 3.30 X 0.83 X 1 NO = 2.74 SQ.MT. 16 1.45 X 8.35 X 1 NO = 12.11 SQ.MT. 24 0.50 X 3.05 X 1 NO = 1.53 SQ.MT. 1.15 LL5 16.25 X 2.59 X 1 NO = 42.09 SQ.MT. 0.15 SIGNATURE LL10 2.85 X 2.57 X 1 NO = 7.32 SQ.MT. NAME AND ADDRESS OF LICENSED SURVEYOR (L.S) 17 0.45 X 3.11 X 1 NO = 1.61 SQ.MT. TOTAL DEDUCTION = 190.56 SQ.MT. Y1 3.10 3.10 3.13 LL6 2.86 X 2.92 X 1 NO = 8.35 SQ.MT. 0.23 L4 3.32 ST4 LL7 L6 18 1.98 X 4.43 X 1 NO = 8.77 SQ.MT. LL7 2.60 X 3.10 X 1 NO = 8.06 SQ.MT. TOTAL BUILT UP AREA [X - Y1] = 426.64 SQ.MT.X1 LL11 0.78 X 0.05 X 1 NO = 0.04 SQ.MT. 19 0.49 X 5.65 X 1 NO = 2.77 SQ.MT. LL12 1.15 X 0.15 X 1 NO = 0.17 SQ.MT. 2.85 0.70 2.60 3.85 LL8 2.80 X 3.13 X 1 NO = 8.76 SQ.MT. LIFT AREA CALCULATION 3.05 22 ST3 7.05 L5 7.05 20 1.50 X 0.70 X 1 NO = 1.05 SQ.MT. LL9 3.30 X 0.83 X 1 NO = 2.74 SQ.MT. L1 3.75 X 4.05 X 1 NO = 15.19 SQ.MT. = TOTAL LIFT LOBBY AREA PER FL. (TYPICAL FLOOR) 101.35 SQ.MT. Y4 8.35 DUCT AREA CALCULATION 8.55 21 1.23 X 3.25 X 1 NO = 4.00 SQ.MT. 1.15 3.13 0.83 3.13 LL10 2.85 X 2.57 X 1 NO = 7.32 SQ.MT. 2.57 16 LL10 D2 LL8 L2 9.55 X 3.00 X 1 NO = 28.65 SQ.MT. 0.50 19 0.05 22 0.50 X 3.05 X 1 NO = 1.53 SQ.MT. D1 0.45 X 3.12 X 1 NO = 1.40 SQ.MT. LL11 0.78 X 0.05 X 1 NO = 0.04 SQ.MT. L3 0.30 X 2.85 X 1 NO = 0.86 SQ.MT. Shashik 0.70 5.58 2.85 12 LL11 0.78 2.80 0.45 11 23 0.23 X 6.80 X 1 NO = 1.56 SQ.MT. LL12 1.15 X 0.15 X 1 NO = 0.17 SQ.MT. L4 2.85 X 3.33 X 1 NO = 9.49 SQ.MT. D2 0.45 X 3.13 X 1 NO = 1.41 SQ.MT. Digitally signed by Shashikant Laxman 4.43 Jadhav ST5 ant DN: c=IN, o=Personal, title=4436, 5.65 18 LL9 24 0.50 X 3.05 X 1 NO = 1.53 SQ.MT. TOTAL DUCT AREA PER FL. (TYPICAL FLOOR) = 2.81 SQ.MT. Y5 2.5.4.20=96ea24e3466c15550473630d TOTAL LIFT LOBBY AREA PER FL. (TYPICAL FLOOR) = 101.35 SQ.MT. Y4 3.25 0.204.55 3.30 3.70 L5 3.70 X 7.05 X 1 NO = 26.09 SQ.MT. 3.11 8843a8d731e6d1b86679d2d15210387 2.75 2.80 21 be9f50e48, postalCode=400080, 15 14 TOTAL DEDUCTION = 190.97 SQ.MT. Y1 Laxman 17 DUCT AREA CALCULATION NET BUILT UP AREA FOR FSI = 158.90 SQ.MT. X1 st=Maharashtra, 20 0.49 1.98 0.451.450.78 1.87 13 1.65 TOTAL BUILT UP AREA [X - Y1] = 426.23 SQ.MT. X1 D1 0.45 X 3.12 X 1 NO = 1.40 SQ.MT. L6 3.85 X 3.13 X 1 NO = 12.05 SQ.MT. [X1 - (L1+Y3+Y4+Y5)] B-106, Natraj Building, serialNumber=28d8c972d6fe5f6f07b6 902daebcaee524cb190ed30f1e33cde9 c2dd15f6a34e, cn=Shashikant Laxman Jadhav 1.23 11.75 3.85 TOTAL LIFT AREA PER FL. (TYPICAL FLOOR) = 92.33 SQ.MT. L1 S P A C E A E Jadhav Date: 2025.08.14 16:21:36 +05'30' 1.50 D2 0.45 X 3.13 X 1 NO = 1.41 SQ.MT. Mulund Goregaon Link Road 30.86 TOTAL DUCT AREA PER FL. (TYPICAL FLOOR) = 2.81 SQ.MT. Y5 1ST PODIUM FLOOR PLAN. (WING 4 ) NET BUILT UP AREA = 158.90 SQ.MT. Mulund (w), Mumbai : 4000 080 [X1 - (Y2+Y3+Y4+Y5)] C O N S U L T A N T S SCALE - 1:100