FILE NO.-P-14887/2023/(258 A)/R/C Ward/BORIVALI-R/C/337/1/New 2.17 0.52 F.S.I.-1.31 SHEET NO.1/6 0.44 33.05 2.77 1 29 15.29 5.66 2.62 5.00 3.64 26 2 4.45 3.10 10.06 28 1.05 25 3.10 5.55 2.40 3 27 24 1 4.84 2.05 9.01 4 4.70 23 9.91 2.47 2.883.93 5.60 2.83 5.99 22 5 9.01 6.30 21 2.05 6 11.75 19 11.40 18 7.50 7 8.37 6.90 20 9.23 3.93 1.53 17 5.30 10.80 2.45 STAIRCASE AREA FOR EXISTING BUILDING 5.83 2.62 6.71 4.702.20 5.55 8 16 AS PER CE/6227/BP (WS)/AR DATED. 05/10/1989 11.70 2.87 9 15 16.13 10.80 2.45 10 12 7.60 14 11 13 3.50 11.85 7.05 3.34 11.15 1.15 1.90 18.30 M.W 3 2.38 NO COM POUND WALL (Rem . EXISTIN NORTH G MAHIS ADDITIONAL L.O.S. AREA DIAGRAM HMARD ovable boal lards with chain link) 4.50 IN I MANDIR SCALE 1:500 13.03 PODIUM LINE ABOVE 4.50 NO COM POUND WALL (Rem ROAD SITE U/R ovable boal R.S. lards with chain link) 2.61 M.S. STEPS R.S. R.S. PODIUM LINE ABOVE 4.50 R.S. 3.60M wide driveway SHOP NO.1 R.S. M.S. STEPS 3.05X5.31(Avg.) PODIUM LINE ABOVE SHOP NO.2 (+) 0.25 M LVL 3.67X10.21(Avg.) R.S. EKSAR RERA CARPET AREA SHOP NO.3 BLDG. LINE ABOVE 19.36 SQ.MT. (+) 0.25 M LVL 3.07X8.41(Avg.) SHOP NO.4 R.S. M.S. STEPS RERA CARPET AREA 2.77X6.84(Avg.) R.S. (+) 0.25 M LVL SHOP NO.5 + 6 7.18 51.12 SQ.MT. (+) 0.25 M LVL 6.17X6.18(Avg.) BLDG. LINE ABOVE RERA CARPET AREA R.S. 30.20 SQ.MT. RERA CARPET AREA (+) 0.25 M LVL 22.36 SQ.MT. SHOP NO.7 6.15 EMS1.1 EXISTING STRUCTURE TO BE DEMOLISHED 2.80X5.80(Avg.) SHOP NO.8 EXISTING STRUCTURE TO BE DEMOLISHED RERA CARPET AREA RERA CARPET AREA (+) 0.25 M LVL 3.15X5.36(Avg.) W.C. 43.45 SQ.MT. SHOP NO.9 27.38 SQ.MT. 1.45X1.30 RERA CARPET AREA 1.50X1.20 (+) 0.25 M LVL 3.80X12.02(Avg.) 19.15 SQ.MT. SHOP NO.10 RERA CARPET AREA 15.50 (+) 0.25 M LVL 3.05X8.01(Avg.) 18.30 M. W. ROAD 6.16 21.28 SQ.MT. 6.00M wide driveway 3.22X2.95 RERA CARPET AREA 53.47 SQ.MT. (+) 0.25 M LVL L/V 18.30 M. W. ROAD 18.30 M. W. ROAD 2.64X0.28 5.69 11.75 M.V. W.C. W.C. M.V. 1.22X0.60 1.106 1.77X1.20 1.77X1.20 1.77X1.20 1.65X1.30 1.85X1.08 0.46 M.V. 12.29 5.03 M.V. FIRE LIFT W.C. LIFT W.C. W.C. 4.80 M.V. 1.60X1.30 2.45X2.15 2.45X2.15 TOILET BLDG. LINE ABOVE 1.50X1.20 1.50X1.20 1.92X1.30 1.22X1.68 2.00X1.20 6.16 L/V 16.99 BLDG. LINE ABOVE PODIUM LINE ABOVE PODIUM LINE ABOVE W.R. 6 5 4 2 COMM. ENTRANCE LOBBY UP LOBBY 8.24X2.35 (+) 0.75 M LVL 6.89X2.86 1.66X0.66 6.87 3.60M wide driveway 1.50 (+) 0.15 M LVL W.C. UP 1.85X4.80 1.29X1.29 L/V 0.90 PLOT 'C' 1.50 GR. TO 1ST FLOOR LIFT 1.95X2.25 FIRE EVACUATION LIFT 1.80X2.75 TOILET 1.30X1.67 1.50 2.70 1.50 5.45 1.85X1.85 L/V LINK ROAD SMOKE 28.55 F.R.D 1 BLDG. LINE ABOVE PODIUM LINE ABOVE CHECK LOBBY UP 8.88 R.G. AREA 1.85X1.50 (+) 0.15 M LVL WING- 'A' WEST (LEVEL : 0.15M) DRIVEWAY TWO WAY ENTRANCE LOBBY L/V 5.00M WIDE DRIVEWAY 9.15X4.87 7.39 1053.83 SQ.MT. BLDG. LINE ABOVE (LEVEL : 0.45M) (+) 0.15 M LVL EXISTING STRUCTURE TO BE DEMOLISHED 6.00M wide driveway 9.75 SERV. TOI. EXISTING STRUCTURE TO BE DEMOLISHED 6.17 EP-RC65 1.90X1.15 2 EXISTING STRUCTURE TO BE DEMOLISHED WEST FRD 29.75 18.30 M. W. ROAD 6.80 L/V SPACE FOR METER PANEL ROS1.4 PODIUM LINE ABOVE FOR WING- 'A' & 'B' 7.35X6.15 (LEVEL : 0.15M) RE1.1 CAR PARKING STATEMENT 5.00 D/W 8.06 8.68 SPACE FOR F.F. PANEL JAY 10.86 6.15 2.61 6.13 7.30 EXISTING STRUCTURE TO BE DEMOLISHED F.F. & DOMESTIC (LEVEL : 0.15M) (LEVEL : 0.15M) U.G.W.T. FLUSHED WITH G.L. EP-RC77 BLDG. LINE ABOVE WS 63 R 6.16 AREA OF TOTAL PARKING REQD. KAMAKSHI 33.05 ROS1.4 36.60 M.W. LINK ROAD BLDG. LINE ABOVE TOTAL 38.09 L/V G+4 TENAMENT NO. EACH UNIT EAST BLDG. LINE ABOVE EAST RE1.1 1/4 4.00 4.27 FRD PUMP ROOM 5.25X3.65 5.45 SMOKE CHECK LOBBY 1.85X1.50 F.R.D 3.45X5.15 6.00M wide driveway 6.81 HT-16.14 MT. LINE AREA DIAGRAM (GR. FLOOR COMM.) EP-RC65 PODIUM LINE ABOVE UP TO 45 Sqmt. 16 3.0 3.05 3.05 (LEVEL : 0.15M) FIRE EVACUATION LIFT 6.15 18.30 M.W 3 . EXISTIN 1.85X1.85 EXISTING STRUCTURE TO BE DEMOLISHED 5 L/V L/V D/W L/V 36.60 M D/W 3.05 G MAHIS PODIUM LINE ABOVE 4 45 TO 60 Sqmt. 1/2 6.00 UP HMARD EXISTING STRUCTURE TO BE DEMOLISHED 9.00 4.1 12 WING- 'B' DRIVEWAY TWO WAY 7.54 INI MAN 5.00M WIDE DRIVEWAY LOBBY METRO LINE INFLUENCE ZONE 6.89X2.86 ENTRANCE LOBBY EXISTING STRUCTURE TO BE RETAIN L/V (LEVEL : 0.45M) 9.15X5.71 8.08 .10 L/V L/V FILE NO. CE/8557/BSII/AR (+) 0.15 M LVL DIR ROA 20.73 D 52 60 TO 90 Sqmt. 28 1/1 28.00 8.46 D/W BLDG. NO.1 D/W FIRE LIFT 2.45X2.15 LIFT 2.45X2.15 6.14 K RO 5.00 6.89 6.12 BLDG. LINE ABOVE BLDG. LINE ABOVE L/V .W.LIN 6.00M wide driveway Above 90 Sqmt. 00 2/1 0.00 D/W 18.41 EXIT DRIVEWAY (LEVEL : 0.45M) L/V EOS1.5 R/C UP TO 1ST PODIUM 6.90 6.15 D/W 37.22 M. LONG & 6.00 M W. TWO WAY RAMP 9.94 L/V TOTAL PARKING REQIRED 38.00 BLDG. LINE ABOVE PODIUM LINE ABOVE 8.98 EPU3.1 8.99 8.69 BLDG. LINE ABOVE 7.01 7.01 6.86 (LEVEL : 0.00M) (LEVEL : 0.00M) ENTRY DRIVEWAY L/V (LEVEL : 0.45M) 10% VISITORS PARKING ( MINIMUM = 1Nos.) 3.80 8 56.65 AD 3.77 T1 3.64 T2 T3 1.58 PODIUM LINE ABOVE T4 1.94 T5 2.15 PODIUM LINE ABOVE T7 EXISTING STRUCTURE TO BE DEMOLISHED 9.94 L/V EPU4.1 TOTAL PARKING (RESIDENTIAL) 41.80 T6 7.89 SOUTH PARKING FOR COM. (Shopping) Area Sqmt. (308.55/40.00) 07.71 BLDG. NO.2 PLOT 'B' EE1.2 PARKING FOR Office (1ST Floor) Area Sqmt. (195.90/37.50) 05.22 BLOCK PLAN N T8 BORIVALI 4 30 SCALE 1:500 14 .00 32 .90 TOTAL PARKING REQIRED COMM. 12.93 DON BOSCO EP- EKSAR 18 .80 .7 .3 5 RC1 37 5 10% VISITORS PARKING (COM.) MINIMUM=2.00 2.00 SCHOOL 26 9 10 LINK ROAD 12 TOTAL PARKING (COMM.) 14.93 NO COM 5 .2 15 POUND EE1.2 6 5 .55 7 TOTAL PARKING REQUIRED 56.73 SAY- 57.00 WALL (R emovab le boalla 18.30 M.W EOS1.4 8.2 0 TOTAL PARKING PROPOSED 143.00 rds with chain lin . EXISTI 6.88 1. 08 TOTAL NO OF BIG PARKING PROPOSED 80.00 k) NG MAH NORTH LOCATION PLAN PLOT AREA DIAGRAM 8. 09 11.40 TOTAL NO OF SMALL PARKING PROPOSED 63.00 4.50 ISHMAR N SCALE 1:500 A Park. Provided Small Park Big Park Total PODIUM LINE ABOVE DIN I MANDI SCALE 1:4000 Ground floor Podium Fl-1 13 nos 13 Nos 31 Nos 11 Nos 44 Nos 24 Nos R ROAD D NO COM 4.50 POUND Podium Fl-02 18 Nos 19 Nos 37 Nos 13.03 WALL (R PROFORMA-A emovab le boalla Podium Fl-03 19 Nos 19 Nos 38 Nos R.S. rds with A AREA STATEMENT Sq.Mts. M.S. STEPS chain lin k) 3002.70 Total Provided 63 Nos 80 Nos 143 Nos 3.60M wide driveway R.S. H 3.19 1 AREA OF PLOT (C.T.S. NO.258A + C.T.S. NO.258C) - (C.T.S. NO.258C) R.S. AS PER REGISTERED DEED OF CONVENYANCE 2235.72 44.06% 55.94 % 100 % PODIUM LINE ABOVE a) Area of Reservation in plot D1 D1 R.S. R.S. A 33.38 4.50 b) Area of Road Set Back SHOP NO.1 M.S. STEPS 3.05X5.31(Avg.) c) Area of D P Road PODIUM LINE ABOVE (+) 0.25 M LVL SHOP NO.2 CHHAJJA ABOVE S. DUCT CHHAJJA ABOVE Z 2 DEDUCTIONS FOR 3.67X10.21(Avg.) BLDG. LINE ABOVE R.S. RERA CARPET AREA SHOP NO.3 R.C.C. WALL 19.36 SQ.MT. CHHAJJA R.S. ABOVE S. DUCT CHHAJJA ABOVE M.S. STEPS (A) For Reservation/Road Area to be handed over to MCGM ( 100% ) (+) 0.25 M LVL 3.07X8.41(Avg.) SHOP NO.4 a) Road Set Back/widening area ( Regulation No 16 ) RERA CARPET AREA 2.77X6.84(Avg.) R.S. (+) 0.25 M LVL SHOP NO.5 + 6 b) Proposed D P road area ( Regulation No 16 ) 51.12 SQ.MT. (+) 0.25 M LVL 6.17X6.18(Avg.) BLDG. LINE ABOVE RERA CARPET AREA R.S. c) ( i ) Reservation Area ( plot ) to be handed over to ( Regulation No 17 ) 30.20 SQ.MT. RERA CARPET AREA (+) 0.25 M LVL 22.36 SQ.MT. SHOP NO.7 6.15 ( ii ) Reservation Area to be handed over as per AR ( Regulation No 17 ) EXISTING STRUCTURE TO BE DEMOLISHED 3.69 2.80X5.80(Avg.) SHOP NO.8 ( Not to be deducted for computation of FSI i.e. sr. no. 5 below ) EXISTING STRUCTURE TO BE DEMOLISHED RERA CARPET AREA RERA CARPET AREA (+) 0.25 M LVL 3.15X5.36(Avg.) 27.38 SQ.MT. Total area under road / reservation W.C. 1.45X1.30 43.45 SQ.MT. SHOP NO.9 RERA CARPET AREA (+) 0.25 M LVL 1.50X1.20 3.80X12.02(Avg.) (B) For Amenity area to be handed over to MCGM ( 5.00% = 113.30 Sqmt.) 19.15 SQ.MT. SHOP NO.10 RERA CARPET AREA a) Area of amenity plot as per DCR 14(A) 15.50 R.C.C. WALL (+) 0.25 M LVL 3.05X8.01(Avg.) 21.28 SQ.MT. 6.00M wide driveway (+) 0.25 M LVL b) Area of amenity plot as per DCR 14(B) 11.10 RERA CARPET AREA 53.47 SQ.MT. c) Area of amenity plot as per DCR 35 1.20 M.W. CHHAJJA ABOVE L/V S. DUCT S. SLAB S. DUCT 3.22X2.95 S. SLAB Total Amenity area 5.69 (C) Deduction of existing BUA to be retained if any / land component of existing BUA/Existing 2.64X0.28 11.75 M.V. W.C. W.C. M.V. BUA as per regulation under which the development was allowed 1.22X0.60 1.77X1.20 1.77X1.20 1.77X1.20 1.65X1.30 1.85X1.08 B Existing Building Area = 536.09/3066.01 x 3002.70 = 525.02 M.V. 12.29 Building No.1 = 2529.92 FIRE LIFT W.C. LIFT M.V. Building No.2 = 536.09 = 3066.01 } W.C. W.C. 11.43 M.V. 1.60X1.30 1.50X1.20 1.92X1.30 2.45X2.15 2.45X2.15 TOILET BLDG. LINE ABOVE 1.50X1.20 1.22X1.68 Total deductions: [ 2(A) + 2(B) + 2(C) ] 2.00X1.20 6.16 L/V 3 CHHAJJA ABOVE 16.99 4 Balance area of plot (for calculating required LOS) [1 - 3] 2235.72 PODIUM LINE ABOVE 2.52 5 Plot area under development [ Sr. no. 4 + 2(A) (c)(ii) ] 2235.72 PODIUM LINE ABOVE W.R. CHHAJJA ABOVE COMM. 6 Zonal (basic) FSI 1.00 (ONE) ENTRANCE LOBBY 7 a) permissible built up area as per zonal (basic) FSI (5 X 6) 2235.72 UP LOBBY 8.24X2.35 6.87 BLDG. LINE ABOVE b) permissible built up area as per regulation 30(C) ( Protected development ) 2529.92 0.30 D (+) 0.75 M LVL (LEVEL : 0.40M) 6.89X2.86 1.66X0.66 3.00M wide driveway 1.50 (+) 0.15 M LVL W.C. permissible built up area ( 7a or 7b above, whichever is more ) 2529.92 0.15 0.23 0.23 4.54 UP 1.85X4.80 1.29X1.29 L/V 8 Additional built up area as per regulation 30(A)(3)(a) 0.90 02 STACK 02 STACK PLOT 'C' FREE BOARD a) Additional BUA for 2(A)(c)(i) & 2(B) above within the cap of "admissible TDR" as per Table B 04 03 02 01 no.12 on balance plot. LIFT B B 1.80X2.75 0.29 COMPOUND TOILET b) additional BUA for 2(A)(a) & 2(A)(b) above to be utilized over and above the permissible FSI 1.50 GR. TO 1ST FLOOR 1.50 1.50 WALL 1.95X2.25 FIRE 0.35 EVACUATION LIFT 1.30X1.67 as per column no. 7 of table 12 of regulation 30(A) and to the mentioned in table 12 A of 2.17 1.50 2.70 1.50 5.45 0.50 1.85X1.85 L/V regulation 32 (200% or 250%) c) additional BUA in case of 2(A)(c)(ii) as per regulation 17(1) note 20(vii) & (viii) as per AR GR. LVL. 3.05 H policy on remaining plot. [ Y% as per table no. 5 of regulation 17(1) ] 1.50 1.50 1.50 SMOKE 28.55 Total Additional BUA F.R.D BLDG. LINE ABOVE 0.45 TWO WHEELER PARKING 1.50 PODIUM LINE ABOVE 02 STACK CHECK LOBBY UP 9 Additional / Incentive BUA within the cap of "admissible TDR" as per Table 12 on balance plot 0.30 R.G. AREA 05 06 1.85X1.50 EXISTING STRUCTURE TO BE DEMOLISHED B (+) 0.15 M LVL a) in lieu of cost of construction of amenity buildings as per regulation 30(A)(3)(b) WEST SECTION THRO. WING- 'A' b) 50% of rehab component as per reg. 33(7)(A) Z L/V 5.68 4.72 COMPOUND WALL (LEVEL : 0.15M) DRIVEWAY TWO WAY ENTRANCE LOBBY SECTION THROUGH U.G.TANK CHHAJJA ABOVE c) 10 sqmts per rehab tenement as per reg. 33(7)(B) CHHAJJA ABOVE SCALE - 1:100 390.00 3.20 (LEVEL : 0.40M) 5.00M WIDE DRIVEWAY 9.15X4.87 7.39 39 X 10 = 390.00 sq.mt. 1053.83 SQ.MT. BLDG. LINE ABOVE SCALE - 1:100 S 44 (LEVEL : 0.40M) 02 STACK (+) 0.15 M LVL Total Additional BUA / Incentive area 390.00 F 07 08 F 02 STACK 6.00M wide driveway 10 BUA due to "Additional" FSI on payment of premium" as per Table No 12 of Regulation B No 30(A) [ sr. no. 5 X 50% ] 25 26 SERV. TOI. 11 BUA due to admissible "TDR" as per table no. 12 of regulation no. 30(A) & 32 EXISTING STRUCTURE TO BE DEMOLISHED 1.90X1.15 B 6.17 1.94 ( by restricting area utilised beyond zonal FSI in sr. no. 7(b), 8(a) & 9 above ) EXISTING STRUCTURE TO BE DEMOLISHED FRD a) Genenal TDR 29.75 CHHAJJA ABOVE 6.80 CHHAJJA ABOVE 02 STACK b) Slum TDR 02 STACK 27 28 L/V Total TDR 1.11 SPACE FOR 02 STACK 12 Permissible built up area [7(b)+9(c)+10+11] 2919.92 23 24 S METER PANEL 09 10 13 Proposed built up area (376.55 + 2543.37) 2919.92 B B PODIUM LINE ABOVE FOR WING- 'A' & 'B' 14 TDR generated if any as per regulation 30 (A) and 32 for unutilized BUA on plot 7.35X6.15 DUCT 15 Fungible compensatory area as per regulation no. 31(3) (LEVEL : 0.15M) CHHAJJA ABOVE 02 STACK a) ( i ) perm. fungible compensatory area for rehab comp. without charging premium (RESI.) 493.78 8.00 29 30 ( ii ) prop. fungible compensatory area for rehab comp. without charging premium (RESI.) 493.78 5.00 B 8.06 D/W a1) ( i ) perm. fungible compensatory area for rehab comp. without charging premium (COM.) 80.29 BLDG. LINE ABOVE 93 3. 02 STACK ( ii ) prop. fungible compensatory area for rehab comp. without charging premium (COM.) 76.51 SPACE FOR 02 STACK 11 12 ( iii ) Area Kept in Abeyance 3.78 F.F. PANEL 21 22 JAY EXISTING STRUCTURE TO BE DEMOLISHED B F.F. & DOMESTIC b) ( i ) perm. fungible compensatory area for sale comp. by charging premium (RESI.) 396.40 CHHAJJA (LEVEL : 0.15M) (LEVEL : 0.15M) B S. DUCT U.G.W.T. 02 STACK ( ii ) prop.fungible compensatory area for sale comp. by charging premium (RESI.) 329.67 FLUSHED WITH G.L. 31 32 b1) ( i ) perm. fungible compensatory area for sale comp. by charging premium (COMM.) 51.39 CHHAJJA ABOVE B 6.16 ( ii ) prop.fungible compensatory area for sale comp. by charging premium (COMM.) 51.39 S. DUCT 02 STACK 02 STACK 19 20 KAMAKSHI 16 17 Total built up area proposed including FCA [13+15(a)(ii)+15(a1)(ii)+15(b)(i)+15(b1(ii) ] FSI consumed on net plot [ 13/5 ] TENAMENT STATEMENT (2919.92/2235.72) 3871.27 1.31 BLDG. LINE ABOVE (B) B ABOVE 13 14 G+4 3871.27 02 STACK i PROPOSED AREA (16) 38.09 B L/V WEST BLDG. LINE ABOVE LESS DEDUCTION OF NON-RESIDENTIAL AREA [SHOP,ETC.] 504.45 19.03 33 34 ii CHHAJJA ABOVE EAST S iii AREA AVAILABLE FOR TENAMENTS [ (i) minus (ii) ] 3366.82 24.96 CHHAJJA ABOVE 1.41 FRD PUMP ROOM 1.50 1.50 1.50 1.50 1.50 SMOKE CHECK LOBBY F.R.D 3.45X5.15 CHHAJJA ABOVE 02 STACK 35 36 6.00M wide driveway 6.81 HT-16.14 MT. iv V VI TENAMENTS PERMISSIBLE AS PER [ 200 / HECTARE ] TENAMENTS PERMISSIBLE AS PER [ 450 / HECTARE ] TENAMENTS PROPOSED 152 56 5.25X3.65 5.45 1.85X1.50 VII TENAMENTS EXISTING NIL 0.50 4.27 S E E S. DUCT VIII TOTAL TENAMENTS PROPOSED ( 6 + 7 ) PODIUM LINE ABOVE 56 (LEVEL : 0.15M) FIRE PARKING STATEMENT 13.36 (C) 3.05 3.05 EVACUATION LIFT 5 6.15 i PARKING REQUIRED BY REGULATION FOR 57 3.0 2.50 1.50 1.85X1.85 EXISTING STRUCTURE TO BE DEMOLISHED L/V L/V D/W L/V ii OUTSIDERS [VISITORS] 10% .W.LIN D/W 02 STACK iii TOTAL PARKING REQUIRED TOTAL PARKING PROVIDED 57 143 PODIUM LINE ABOVE 3.05 iv CHHAJJA ABOVE CHHAJJA ABOVE 15 16 UP EXISTING STRUCTURE TO BE DEMOLISHED TOTAL PARKING TO BE CONDONED 9.00 B DRIVEWAY TWO WAY WING- 'B' v 7.54 5.00M WIDE DRIVEWAY LOBBY (D) TRANSPORT VEHICLES PARKING 6.89X2.86 ENTRANCE LOBBY L/V EXISTING STRUCTURE TO BE RETAIN L/V (LEVEL : 0.40M) 9.15X5.71 8.08 L/V i SPACE FOR TRANSPORT VEHICLES PARKING REQD. NIL FILE NO. CE/8557/BSII/AR (+) 0.15 M LVL ii TOTAL NO. OF TRANSPORT VEHICLES PARKING SPACES PROVIDED NIL 36.60 M 02 STACK 20.73 FORM II (PERFORMA B) 17 18 B CONTENTS OF SHEETS D/W D/W BLDG. NO.1 FIRE LIFT LIFT GROUND FLOOR,LOCATION & BLOCK PLAN,PLOT AREA DIAGRAM & CALC. CHHAJJA ABOVE CARPET AREA CALC. ,PARKING STATEMENT,GR. FLR. BUILT UP AREA DIAGRAM. 8.46 5.00 2.45X2.15 2.45X2.15 6.14 CHHAJJA ABOVE 3.80 DESCRIPTION OF PROPOSAL AND PROPERTY 6.89 6.12 PROPOSED REDEVELOPMENT OF EXISTING SOCIETY BUILDING KNOWN AS "OM SHRADDHA CHS. LTD." ON S. DUCT BLDG. LINE ABOVE S. DUCT C.T.S. NO.258 A OF VILLAGE BORIVALI, JAYRAJ NAGAR, OFF NEW LINK ROAD, BORIVALI (W) MUMBAI. BLDG. LINE ABOVE 3.00 L/V 3. 6.00M wide driveway NAME & ADDRESS OF THE DEVELOPER SIGNATURE D/W 18.41 93 L/V Shri Mahek D. Modi Director Digitally signed by C 8.00 EXIT DRIVEWAY (LEVEL : 0.40M) C Of Modi's Navnirman Ltd. C.A. to Owners MAHEK MAHEK DINESH MODI SHOP No.1 RASHMI HEIGHTS, M.G. ROAD, 6.90 KANDIVALI (W) MUMBAI.400067. DINESH MODI Date: 2023.09.26 18:20:11 +05'30' UP TO 1ST PODIUM 6.15 D/W 37.22 M. LONG & 6.00 M W. TWO WAY RAMP 8.73 SIGNATURE, NAME AND ADDRESS OF LICENSED SURVEYOR SIGNATURE K ROA 3.00 9.94 L/V M/S.SANJAY B SHAH. 10.64 Digitally signed by SANJAY BHAILAL SHAH 6.25 BLDG. LINE ABOVE DN: c=IN, postalCode=400067, st=MAHARASHTRA, PODIUM LINE ABOVE street=ARIHANT BUILDING11 BALASINOR CHSL SV LICENSED SURVEYORS & ENGINEERS SANJAY ROADMUMBAI 400067, l=MUMBAI, o=Personal, title=4460, serialNumber=b21f8181f998f1d33b5bee7221209e6e0b13 2c100c1891ff19a29bb1f3707b98, 2A/3, PANCHVATI,S.V.ROAD, KANDIVLI(W), pseudonym=446020230428141641420, 0.15 BLDG. LINE ABOVE BHAILAL SHAH 2.5.4.20=6769f9b077d0a48f96bc259d11f1a6089a6a9eebe 8.98 CHHAJJA ABOVE S. DUCT CHHAJJA ABOVE MUMBAI-67.Ph.-28022525,28021515. e194e22cab79f1ed4a5ee21, 8.99 email=SANB.SHAH@GMAIL.COM, cn=SANJAY BHAILAL 8.69 SHAH email-sanb.shah@gmail.com / sanjaibshah@gmail.com Date: 2023.09.26 18:25:47 +05'30' S. DUCT 1.20 CHHAJJA ABOVE CHHAJJA ABOVE 7.01 11.80 (LEVEL : 0.00M) (LEVEL : 0.00M) CERTIFICATE OF AREA 7.01 6.86 ENTRY DRIVEWAY L/V CERTIFIED THAT I HAVE SURVEYED THE PLOT UNDER REFERENCE ON 23.04.2022 AND THAT THE 2.17 (LEVEL : 0.45M) DIMENSIONS OF THE SIDES ETC.OF THE PLOT STATED ON THE PLAN ARE AS MEASURED ON SITE AND SANJAY Digitally signed by SANJAY BHAILAL SHAH AREA SO WORKED OUT IS 3002.70 Sqmt.(THREE THOUSAND TWO POINT SEVEN ZERO Sqmt.) DN: c=IN, postalCode=400067, st=MAHARASHTRA, street=ARIHANT BUILDING11 BALASINOR CHSL SV & F.S.I. CLAIMED ON 3002.70 Sqmt. AND TALLIES WITH THE DOCUMENT OF OWNERSHIP/TOWM ROADMUMBAI 400067, l=MUMBAI, o=Personal, 3.64 title=4460, 3.77 BHAILAL serialNumber=b21f8181f998f1d33b5bee7221209e6e PLANNING SCHEME RECORDS. 0b132c100c1891ff19a29bb1f3707b98, 9.94 pseudonym=446020230428141641420, 2.78 2.5.4.20=6769f9b077d0a48f96bc259d11f1a6089a6a9 eebee194e22cab79f1ed4a5ee21, SHAH email=SANB.SHAH@GMAIL.COM, cn=SANJAY BHAILAL SHAH D T1 T2 T3 1.58 PODIUM LINE ABOVE T4 1.94 A 18.20 2.15 PODIUM LINE ABOVE T7 EXISTING STRUCTURE TO BE DEMOLISHED L/V JOB NO. 3468 DRG NO. S.No.1/6 AS SHOWN SCALE CHK. BY DRN. BY Kishor D. REV DESCRIPTION DATE 26-09-2023 SANJAY B. SHAH. Date: 2023.09.26 18:26:05 +05'30' LIC NO= 840011719 SIGN. T5 7.89 1) THE DOCUMENT IS DIGITALLY AND NO PHYSICAL SIGN IS REQUIRED. T6 N 2) THE PLANS ARE APPROVED SUBJEAT TO THE CONDTION MENTOINED IN THE IOD SMALL PARKING- 13 ISSUED UNDER EVEN NO.P-14887/2023/(258 A)/R/C Ward/BORIVALI-R/C/337/1/New GROUND FLOOR PLAN BIG PARKING- 31 SOUTH 37 38 39 40 41 42 43 ON EVEN DATE. TOTAL PARKING- 44 3) THE DRAWING SHALL BE READ IN CONJECTION WITH INTIMATION OF S S S S DISAPPROVAL ISSUED/UNDER SECTION 346 OF MMC ACT 1888 UNDER P-14887/2023/(258 A)/R/C Ward/BORIVALI-R/C/337/1/New ON EVEN DATE. PLAN FOR APPROVAL 2.30 BLDG. NO.2 PLOT 'B' NOTE: SUB-DIVISION OF PLOT 'A' WILL NOT BE ALLOWED IN FUTURE 2.44 T8 1.50 Digitally signed by Ashvini Ashvini Kishor Sonar DN: cn=Ashvini Kishor Sonar c=IN o=Personal Swapnil Digitally signed by Swapnil Bhagawat Patil DN: c=IN, o=Personal, title=1222, pseudonym=4E47F2C4237A80DF682106E8B59 BCE6EC8FC5E64, HANUMANT Digitally signed by HANUMANT SADASHIVRAO Kishor Reason: I am the Bhagawat 2.5.4.20=820d5f33f377a63b0bdc5aa9137429c9 author of this document Location: 4a0b86b6ebd7be20567cb1c0718b2f53, postalCode=425001, st=Maharashtra, SADASHIVRAO BURE Sonar Date: 2023-09-26 serialNumber=8FB399BD24C2D289313094AF6 07480B787166C8E1173291F2D3BF3DD7B387F Date: 2023.09.27 17:17:33 18:47+05:30 Patil 1A, cn=Swapnil Bhagawat Patil Date: 2023.09.27 16:30:09 +05'30' Adobe Acrobat Reader version: 2023.006.20320 BURE +05'30' S.E.B.P.-R7. A.E.B.P.-R/E 2. E.E.B.P.(WS) R1. FILE NO.-P-14887/2023/(258 A)/R/C Ward/BORIVALI-R/C/337/1/New D 3.28 PODIUM LINE ABOVE F.S.I.-1.31 SHEET NO.2/6 R.C.C. B EAM OS CR .C. OPENAB R.C ht LE GLAS S WINDO H D D 7.71 eig W SB EA floo rh OPENAB LE GLAS S WINDO W A 0.10 M.W. VERTICAL FINS 0.10 M.W. VERTICA 3.23 L FINS M@ OPENAB LE GLAS MID of S WINDO D1 D1 W 30.10 R.C.C. BEAM of fl MI 1.50 MT. 0.10 M.W. D OPENAB H R.C.C. WALL oor LE GLAS HIGH PAR VERTICAL 1.50 MT. 0.10 M.W. SLOPING heig @ SLOPING OFFICE NO.1 S WINDO W PODIUM LINE ABOVE Z APET WAL L FINS HIGH PA RAPET W VERTICA L FINS H PODIUM LINE ABOVE AM ALL ht TERRACE TERRACE OPENAB 0.10 M.W. VERTICAL FINS BE BLDG. LINE ABOVE LE GLAS OFFICE NO.2 0.10 M.W. VERTICAL FINS 1:5 R.C 1:5 3.65X10.29(Avg.) OFFICE NO.3 S WINDO W SLIDING WINDOW 1.50 MT. A 33.38 A 30.15 .C. SLIDING HIGH PA 1.50 MT. CR 3.05X7.39(Avg.) WINDOW RAPET W ALL HIGH PAR APET WAL OS S RERA CARPET AREA 47.13 SQ.MT. 3.05X7.69(Avg.) OFFICE NO.4 BLDG. LINE ABOVE SLIDING WINDOW Z L Z TWO WHEELER PARKING TWO WHEELER PARKING TWO WHEELER PARKING RERA CARPET AREA SLIDING TWO WHEELER PARKING TWO WHEELER PARKING TWO WHEELER PARKING WINDOW 0.10 M.W. 30.04 SQ.MT. RERA CARPET AREA 9.20X6.06(Avg.) BLDG. LINE ABOVE VERTICAL FINS BLDG. LINE ABOVE 0.10 M.W. VERTICA L FINS 1.50 MT. 28.14 SQ.MT. PROFESSIONAL HIGH PAR APET WAL 1.50 MT. HIGH PA RERA CARPET AREA L RAPET W OFFICE NO.1 ALL R.C.C. WALL 72.38 SQ.MT. COOKING PLATFORM R.C.C. WALL eig h t 2.00X5.93(Avg.) BUILT UP AREA BLDG. LINE ABOVE GIRDER BEAM BLDG. LINE ABOVE R.C.C. WALL H 42.34 SQ.MT. R. SLOPING Flo o r BEDROOM KITCHEN C. C. CR TERRACE MID OF 2.45X5.20 (AVG) 1.85X3.98 S S S S OS 1:5 BUILT UP AREA PROFESSIONAL S M @ BE A 12.91 SQ.MT. 43.34 SQ.MT. (AVG) B B 03 04 S S S AMBE @ RERA CARPET AREA 7.37 SQ.MT. OFFICE NO.2 B B 03 04 ROS MI D 40.52 SQ.MT. 3.25X5.40(Avg.) 01 02 05 01 05 C. C. C of flo or 01 02 R. RERA CARPET AREA 3.25 he igh (+) 8.65 M LVL 0.10 M.W. VERTICAL FINS t 17.54 SQ.MT. (+) 11.55 M LVL 1.50 MT. HIGH PARAPET WALL 3.60 ONE WAY DRIVEWAY 1.50 MT. HIGH PARAPET WALL R.C.C. WALL 3.60 ONE WAY DRIVEWAY M.V. M.V. TOILET 3.24 1.85X1.50 M.V. B 3.01 3.24 3.01 0.10 M.W. VERTICAL FINS 3.15 0.10 M.W. VERTICAL FINS 21.32 TOILET TOILET R.C.C. WALL EXCLUDING TOILET 1.90X2.85 M.V. FIRE LIFT LIFT 20 S TOILET 1.22X2.23 20 S BLDG. LINE ABOVE 1.20X2.85 W.C. 1.45X2.23 COOKING PLATFORM 1.70X2.40 1.70X1.65 2.45X2.15 2.45X2.15 R.C.C. WALL 1.20X2.25 1.20X1.21 C.B. 3.31X4.08 FRD FRD KITCHEN +2.10X1.38 B B FRD PODIUM LINE ABOVE FRD 5.25X2.83 FIRE LIFT LIFT 0.10 M.W. VERTICAL FINS 2.52 (+) 4.45 M LVL FIRE LIFT LIFT R.C.C. WALL W.R. COMM. WING- 'A' RERA CARPET AREA 2.45X2.15 2.45X2.15 2.45X2.15 2.45X2.15 (+) 4.45 M LVL FRD TOILET PODIUM LINE ABOVE 17.75 SQ.MT. ENTRANCE LOBBY LOBBY FRD BLDG. LINE ABOVE BLDG. LINE ABOVE Counted In Fsi. 2.00X1.20 0.10 M.W. VERTICAL FINS D TWO WAY DRIVEWAY BLDG. LINE ABOVE 8.01X2.12 6.89X2.86 R.C.C. WALL R.C.C. WALL TWO WAY DRIVEWAY 3.16 3.35 21 B 3.16 (+) 4.45 M LVL R.C.C. WALL 21 B BLDG. LINE ABOVE 6.00 (+) 4.45 M LVL t R.C.C. WALL h R.C.C. WALL 9.00 4.31 eig DN igh t r H WING- 'A' WING- 'A' 1.24 VOID r He F loo FRD loo R. OF (+) 8.65 M LVL 0.90 R.C C. .C. CR DO FF C. CR MI D LOBBY (+) 11.55 M LVL FRD F.D. E.D. MI @ 1.20 M. HIGH R.C.C. PARDI OS OS AM LOBBY 3.35 B 2.64 @SB SB FRD EA EAM MB @ (+) 5.05 M LVL EA BE M S @ D 6.89X2.86 D 6.89X2.86 R.C.C. WALL S MI S MI OS Do CR O D LIFT . CR f flo C. of flo . C or C. or R.C he R. 1.50 igh he 1.50 1.95X2.25 TWO WHEELER PARKING TWO WHEELER PARKING FIRE t igh t 0.35 UP EVACUATION LIFT 2.17 F.D. E.D. L.V. 22 B 22 B 0.29 F.D. E.D. L.V. 1.50 2.70 1.50 DN 1.85X1.85 R.C.C. BEAM @ MID OF Floor Height R.C.C. BEAM @ MID OF Floor Height B B 08 FRD B 0.50 B 08 FRD H 13.14 13.14 0.10 M.W. VERTICAL FINS 1.50 FIRE SMOKE 1.50 UP 1.50 MT. HIGH PARAPET WALL FIRE EVACUATION LIFT UP FRD BLDG. LINE ABOVE EVACUATION LIFT 1.50 CHECK LOBBY B 01 (+) 5.05 M LVL 1.85X1.50 4.50 10 S DN 1.85X1.85 1.85X1.85 X 1.50 MT. HIGH PARAPET WALL DN 0.50 0.10 M.W. VERTICAL FINS H 0.50 1.50 1.50 1.50 H 0.10 M.W. VERTICAL FINS BLDG. LINE ABOVE (+) 5.05 M LVL 06 07 0.10 M.W. VERTICAL FINS SMOKE 1.50 MT. HIGH PARAPET WALL 06 07 SMOKE 5.68 Z 1.50 MT. HIGH PARAPET WALL FRD BLDG. LINE ABOVE 1.50 FRD B B CHECK LOBBY BLDG. LINE ABOVE 23 B 1.50 B B CHECK LOBBY B 09 1.85X1.50 23 B 1.50 MT. HIGH PARAPET WALL 0.10 M.W. VERTICAL FINS B 09 BLDG. LINE ABOVE 1.85X1.50 1.50 MT. HIGH PARAPET WALL 0.10 M.W. VERTICAL FINS DRIVEWAY TWO WAY 1.50 1.50 1.50 1.50 1.50 1.50 5.00M WIDE DRIVEWAY 4.50 11 S (+) 8.65 M LVL (+) 8.65 M LVL F B 02 F Z (+) 11.55 M LVL (+) 11.55 M LVL Z 09 B BLDG. LINE ABOVE BLDG. LINE ABOVE DRIVEWAY TWO WAY 1.94 3.85 DRIVEWAY TWO WAY 5.00M WIDE DRIVEWAY 24 B 3.50 F B 10 F F B 10 5.00M WIDE DRIVEWAY F 24 B 12 B 1.94 18 17 S 0.10 M.W. VERTICAL FINS 1.94 17 S 18 3.00 3.00 ONE WAY DRIVEWAY S 3.50 S X 3.50 0.10 M.W. VERTICAL FINS 25 B 25 B 0.10 M.W. VERTICAL FINS 0.10 M.W. VERTICAL FINS 3.00 ONE WAY DRIVEWAY 8.00 13 B 16 S 5.00 16 S GIRDER BEAM 0.10 M.W. VERTICAL FINS 0.10 M.W. VERTICAL FINS 93 3. 3.00 7.00 ONE WAY DRIVEWAY DN TO GR. LVL. 07 S ONE WAY DRIVEWAY 7.00 43.90 6.00 M W. TWO WAY RAMP 26 B 26 B 5.50 5.40 71 71 4. 4. BLDG. LINE ABOVE 3.00 14 B 15 S 15 S 43.90 DN TO 1ST PODIUM 43.90 6.00 M W. TWO WAY RAMP DN TO 2ND PODIUM 06 S 08 36.50 M. LONG & 6.00 M W. TWO WAY RAMP BLDG. LINE ABOVE S 27 B BLDG. LINE ABOVE 27 B BLDG. LINE ABOVE Y 1.50 MT. HIGH PARAPET WALL B 03 15 S 14 S 19 14 S 19 BLDG. LINE ABOVE 0.10 M.W. VERTICAL FINS BLDG. LINE ABOVE S S BLDG. LINE ABOVE 1.50 MT. HIGH PARAPET WALL 1.50 MT. HIGH PARAPET WALL B 11 B 11 1.50 1.50 1.50 28 S BLDG. LINE ABOVE 28 S 0.10 M.W. VERTICAL FINS SMOKE BLDG. LINE ABOVE 0.10 M.W. VERTICAL FINS 1.50 FRD CHECK LOBBY 0.10 M.W. VERTICAL FINS 16 S 1.85X1.50 E E 0.50 1.50 1.50 1.50 12.86 DRIVEWAY TWO WAY FIRE SMOKE 1.50 1.50 1.50 24.96 SMOKE 1.50 FRD 5.00M WIDE DRIVEWAY UP EVACUATION LIFT CHECK LOBBY 1.50 FRD 0.10 M.W. VERTICAL FINS CHECK LOBBY 0.10 M.W. VERTICAL FINS 3.45 1.85X1.50 29 S 29 S DN 1.50 1.85X1.85 1.85X1.50 B 04 E E 0.50 E E 0.50 DRIVEWAY TWO WAY FIRE DRIVEWAY TWO WAY 12.36 FRD FIRE 3.45 12.36 5.00M WIDE DRIVEWAY UP EVACUATION LIFT F.D. E.D. L.V. (+) 5.05 M LVL 5.00M WIDE DRIVEWAY UP EVACUATION LIFT 17 B 3.45 DN 1.50 1.85X1.85 1.50 1.85X1.85 Y DN B 12 24.96 LOBBY B 12 FRD 6.89X2.86 FRD 24.96 F.D. E.D. L.V. (+) 8.65 M LVL 0.10 M.W. VERTICAL FINS B 05 30 B F.D. E.D. L.V. (+) 11.55 M LVL 30 B WING- 'B' FRD LOBBY 18 B LOBBY 6.89X2.86 ONE WAY DRIVEWAY 6.89X2.86 0.10 M.W. VERTICAL FINS 0.10 M.W. VERTICAL FINS B 13 B 13 (+) 5.05 M LVL WING- 'B' FRD FIRE LIFT LIFT 3.50 WING- 'B' FRD 2.45X2.15 2.45X2.15 31 B ONE WAY DRIVEWAY 5.45 31 B ONE WAY DRIVEWAY (+) 8.65 M LVL 1.50 MT. HIGH PARAPET WALL (+) 11.55 M LVL BLDG. LINE ABOVE FIRE LIFT LIFT FIRE LIFT LIFT 2.45X2.15 2.45X2.15 5.45 2.45X2.15 2.45X2.15 3.00 5.45 BLDG. LINE ABOVE 4. 1.50 MT. HIGH PARAPET WALL 72 3.10 ONE WAY DRIVEWAY 1.50 MT. HIGH PARAPET WALL BLDG. LINE ABOVE BLDG. LINE ABOVE 6.99 BLDG. LINE ABOVE C C 4.00 4.00 BLDG. LINE ABOVE GIRDER BEAM 4. 72 3.10 ONE WAY DRIVEWAY 0.10 M.W. VERTICAL FINS 3.10 ONE WAY DRIVEWAY 4. UP TO 2ND PODIUM 6.99 72 36.50 M. LONG & 6.00 M W. TWO WAY RAMP 3.00 C C C C BLDG. LINE ABOVE 6.99 0.10 M.W. VERTICAL FINS 0.10 M.W. VERTICAL FINS 23 22 21 20 19 BLDG. LINE ABOVE S S S S S UP TO 3RD PODIUM 36.28 M. LONG & 6.00 M W. TWO WAY RAMP (+) 5.05 M LVL BLDG. LINE ABOVE 0.10 M.W. VERTICAL FINS 0.10 M.W. VERTICAL FINS 0.10 M.W. VERTICAL FINS 13.00 BLDG. LINE ABOVE 24 S 36 35 34 33 32 36 35 34 33 32 BLDG. LINE ABOVE 38 37 2.17 DRIVER TOIL. BLDG. LINE ABOVE S S S S S S S S S S S S 2.10X1.20 (+) 8.65 M LVL 1ST COMM./PODIUM FLOOR PLAN 0.10 M.W. VERTICAL FINS 0.10 M.W. VERTICAL FINS 0.10 M.W. VERTICAL FINS 13.00 0.10 M.W. VERTICAL FINS 1.50 MT. HIGH PARAPET WALL 1.50 MT. HIGH PARAPET WALL 0.10 M.W. VERTICAL FINS 0.10 M.W. VERTICAL FINS 13.00 SMALL PARKING- 18 37 S SMALL PARKING- 19 2.17 0.10 M.W. VERTICAL FINS 0.10 M.W. VERTICAL FINS 0.10 M.W. VERTICAL FINS 21.99 BIG PARKING- 19 DRIVER TOIL. A 2ND PODIUM FLOOR PLAN 2.10X1.20 BIG PARKING- 19 2.17 DRIVER TOIL. TOTAL PARKING- 37 1.50 MT. HIGH PARAPET WALL 1.50 MT. HIGH PARAPET WALL 3RD PODIUM FLOOR PLAN TOTAL PARKING- 38 2.10X1.20 SMALL PARKING- 13 1.50 MT. HIGH PARAPET WALL 1.50 MT. HIGH PARAPET WALL BIG PARKING- 11 0.10 M.W. VERTICAL FINS 0.10 M.W. VERTICAL FINS 0.10 M.W. VERTICAL FINS TOTAL PARKING- 24 21.99 0.10 M.W. VERTICAL FINS 21.99 0.10 M.W. VERTICAL FINS 0.10 M.W. VERTICAL FINS A A 3.20 29.85 ADDITIONAL L.O.S. 4TH PODIUM FLR. R.C.C. BEAM R.C.C. BEAM 2 2.90 3.50 3.50 4.24 2.40 1 3RD PODIUM FLR. 1.50 DRIVE WAY DRIVE WAY 1.44 VERTICAL FINS. 7.71 TWO WHEELER PARKING PO1 3RD PODIUM FLR. 3RD PODIUM FLR. R.C.C. BEAM R.C.C. BEAM 2.90 10.15 2.90 2.90 2.40 VERTICAL FINS. 2ND PODIUM FLR. 1.50 DRIVE WAY DRIVE WAY PO2 4.25 2ND PODIUM FLR. TWO WHEELER PARKING 2ND PODIUM FLR. 1.20 R.C.C. BEAM 3.60 RCC WALL 2.61 2.61 8.28 VOID 3.60 3.60 4.20 17.68 2.40 TWO WHEELER PARKING 2.38 2.38 OFFICE NO.4 S1 S4 1ST PODIUM/COMM. FLR. 1.20 R.C.C. PARDI DRIVE WAY PO3 4.08 1.50 1ST PODIUM FLR. 2.10 RAMP 1ST COMM. FLR. SERVICE SLAB 9.30 1.70 S5 1.65 PO4 1.65 4.60 S8 2.41 2.41 S1a S1b 5.05 5.05 4.65 4.90 0.60 2.61 3.26 8.66 3.40 3.40 5.05 4.20 4.75 2.80 V SHOP NO.5,6 2.95 3.90 S9 0.65 0.65 FORM II (PROFORMA B) 2.10 PUMP ROOM 0.15 6.82 PLINTH LVL. CONTENTS OF SHEETS 6 GR. LVL. 0.25 0.15 DRIVE WAY S6 1ST COMM/PODIUM FLOOR,2ND & 3RD PODIUM FLOOR. 5.17 5.17 TOILET PLINTH LVL. 5.12 S2 5.12 1ST COMM. BUILT UP AREA DIAGRAM & CALCULATION. 4.41 PLINTH LVL. S3 3 GR. LVL. GR. LVL. 4 8.34 SECTION E-E DESCRIPTION OF PROPOSAL AND PROPERTY SECTION H-H WING'A' PROPOSED REDEVELOPMENT OF EXISTING SOCIETY BUILDING KNOWN AS "OM SHRADDHA CHS. LTD." ON 5 2.07 (THROUGH RAMP & PUMP ROOM) C.T.S. NO.258 A OF VILLAGE BORIVALI, JAYRAJ NAGAR, OFF NEW LINK ROAD, BORIVALI (W) MUMBAI. RERA CARPET AREA DIAGRAM & CALCULATION. NAME & ADDRESS OF THE DEVELOPER SIGNATURE 0.94 1 2.52 8.34 6.00 2.76 1.52 2.76 9.15 Shri Mahek D. Modi Director Digitally signed by 6.60 Of Modi's Navnirman Ltd. C.A. to Owners MAHEK MAHEK DINESH MODI 33.05 SHOP No.1 RASHMI HEIGHTS, M.G. ROAD, KANDIVALI (W) MUMBAI.400067. DINESH MODI Date: 2023.09.26 18:20:31 +05'30' 2 2.61 2.61 LINE AREA DIAGRAM (1ST FLOOR COMM.) SIGNATURE, NAME AND ADDRESS OF LICENSED SURVEYOR SIGNATURE 4.45 M/S.SANJAY B SHAH. 1.70 SANJAY Digitally signed by SANJAY BHAILAL SHAH 5 5.35 DN: c=IN, postalCode=400067, st=MAHARASHTRA, 6 5.50 street=ARIHANT BUILDING11 BALASINOR CHSL SV S8 LICENSED SURVEYORS & ENGINEERS ROADMUMBAI 400067, l=MUMBAI, o=Personal, 2.38 title=4460, 0.96 0.49 BHAILAL S1 S4 serialNumber=b21f8181f998f1d33b5bee7221209e 6e0b132c100c1891ff19a29bb1f3707b98, 2A/3, PANCHVATI,S.V.ROAD, KANDIVLI(W), pseudonym=446020230428141641420, 1 2.5.4.20=6769f9b077d0a48f96bc259d11f1a6089a6 a9eebee194e22cab79f1ed4a5ee21, MUMBAI-67.Ph.-28022525,28021515. SHAH email=SANB.SHAH@GMAIL.COM, cn=SANJAY BHAILAL SHAH 4.08 0.60 6.75 1 email-sanb.shah@gmail.com / sanjaibshah@gmail.com Date: 2023.09.26 18:26:23 +05'30' 0.46 1 4.75 3.48 JOB NO. DRG NO. SCALE CHK. BY DRN. BY REV DESCRIPTION DATE SIGN. S9 3468 S.No.2/6 AS SHOWN Kishor D. 26-09-2023 2.50 3.25 S5 1.65 1) THE DOCUMENT IS DIGITALLY AND NO PHYSICAL SIGN IS REQUIRED. 2.41 2.41 2 N 2.38 3 2) THE PLANS ARE APPROVED SUBJEAT TO THE CONDTION MENTOINED IN THE IOD S1a S1b 4.74 2.45 1.65 ISSUED UNDER EVEN NO.P-14887/2023/(258 A)/R/C Ward/BORIVALI-R/C/337/1/New 3.26 PROFESSIONAL PROFESSIONAL ON EVEN DATE. OFFICE NO.1 3) THE DRAWING SHALL BE READ IN CONJECTION WITH INTIMATION OF 1.50 8.34 OFFICE NO.2 4 0.65 0.65 DISAPPROVAL ISSUED/UNDER SECTION 346 OF MMC ACT 1888 UNDER 1.20 0.15 P-14887/2023/(258 A)/R/C Ward/BORIVALI-R/C/337/1/New ON EVEN DATE. STAIRCASE & LIFT LOBBY AREA PLAN FOR APPROVAL 2 8.28 RERA CARPET AREA CALCULATION (WING-A) S6 PROFESSIONAL OFFICE NO.1 (1ST COMM.FLR.) 8.00 S2 5.12 5.17 DIAGRAM (1ST FLOOR COMM.) 6.75 4.41 0.97 2 S3 3 5.83 4 1.41 4 1.41 1.63 3 1.73 4.10 1.65 4.10 2.76 1.52 2.76 3 4 1.20 Digitally signed by Ashvini Kishor Sonar Ashvini DN: cn=Ashvini Kishor Sonar c=IN o=Personal Swapnil Digitally signed by Swapnil Bhagawat Patil DN: c=IN, o=Personal, title=1222, pseudonym=4E47F2C4237A80DF682106E8B59B HANUMANT Digitally signed by HANUMANT 4.25 3.25 4.18 Kishor Reason: I am the author CE6EC8FC5E64, 2.5.4.20=820d5f33f377a63b0bdc5aa9137429c94 BUILT UP AREA DIAGRAM (WING-A) Sonar of this document Location: Date: 2023-09-26 Bhagawat a0b86b6ebd7be20567cb1c0718b2f53, postalCode=425001, st=Maharashtra, serialNumber=8FB399BD24C2D289313094AF60 7480B787166C8E1173291F2D3BF3DD7B387F1A SADASHIVRAO SADASHIVRAO BURE Date: 2023.09.27 17:18:24 RERA CARPET AREA CALCULATION (WING-A) 18:47+05:30 BURE Patil , cn=Swapnil Bhagawat Patil PROFESSIONAL OFFICE NO.1 TO 2 (1ST COMM.FLR.) Date: 2023.09.27 16:17:53 +05'30' Adobe Acrobat Reader version: 2023.006.20320 +05'30' PROFESSIONAL OFFICE NO.2 (1ST COMM.FLR.) S.E.B.P.-R7. A.E.B.P.-R/E 2. E.E.B.P.(WS) R1. FILE NO.-P-14887/2023/(258 A)/R/C Ward/BORIVALI-R/C/337/1/New F.S.I.-1.31 SHEET NO.3/6 4.50 4.50 D 3.23 4.50 13.03 6.55 1.50 MT. 0.10 M.W. HIGH PAR VERTICA 4.50 L FINS APET WAL L (+) 14.45 M LVL PODIUM LINE. A 1.50 MT. 30.15 4.50 2.05 HIGH PAR APET WAL L PODIUM BLDG.LINE ABOVE. LINE. 0.10 M.W. VERTICA 24.52 0.97 L FINS 1.50 MT. HIGH PAR APET WAL 14.38 10.36 8.18 BLDG.LINE ABOVE. L ADDITIONAL L.O.S. OPEN TO SKY BLDG.LINE ABOVE. PODIUM LINE. VOID 3.40 6.15 9.55 BLDG.LINE ABOVE. VOID 1.50 MT. HIGH PARAPET WALL VOID L/V ADDITIONAL L.O.S. 5.69 OPEN TO SKY 5.45 R.C.C. WALL SOCIETY OFFICE 1.50 MT. HIGH PARAPET WALL 5.15X3.50 FIRE LIFT LIFT B 2.45X2.15 2.45X2.15 3.65 (+) 14.45 M LVL PERMISSIBLE AREA 6.16 L/V 20.00 SQ.MT. 0.10 M.W. VERTICAL FINS 11.56 16.99 PROPOSED AREA 28.55 5.45X3.65=19.89 Sqmt. (+) 14.45 M LVL FRD WING- 'A' BLDG.LINE ABOVE. RCC WALL WING- 'A' LOBBY 6.89X2.86 ENTRANCE LOBBY 6.87 4.85X12.70 UP FRD (+) 15.05 M LVL L/V F.D. E.D. L.V. B FRD 3.82 6.17 13.14 9.99 PODIUM LINE. 1.50 FIRE +5.15X5.40 UP EVACUATION LIFT X DN 1.85X1.85 L/V 0.50 6.17 1.95X1.35 0.10 M.W. VERTICAL FINS 10.36 SMOKE 1.50 MT. HIGH PARAPET WALL 28.55 FRD 1.50 38.99 CHECK LOBBY 1.85X1.50 0.10 M.W. VERTICAL FINS 1.50 MT. HIGH PARAPET WALL BLDG. LINE ABOVE 1.50 1.50 1.50 SPACE FOR BLDG.LINE ABOVE. LETTER BOX 0.23 FOR WING 'A' L/V 2.70X5.40 7.39 F F 4.85 +5.00X4.85 10.36 (+) 14.45 M LVL 3.40 6.17 6.81 X 5.98 12.30 6.80 29.75 L/V PODIUM LINE. 0.10 M.W. VERTICAL FINS 42.05 1.45 (+) 14.45 M LVL 1.60 1.50 MT. HIGH PARAPET WALL 0.10 M.W. VERTICAL FINS +3.55X1.75 ADDITIONAL L.O.S. 1.60 OPEN TO SKY +3.25X1.60 TOILET 8.06 D/W 27.08 1.75X1.30 43.90 JAY 1.50 MT. HIGH PARAPET WALL 36.60 M 6.75 Y PODIUM LINE. 6.16 KAMAKSHI BLDG. LINE ABOVE FITNESS CENTRE 12.30 G+4 5.15X13.48 38.09 L/V BLDG.LINE ABOVE. PERMISSIBLE FITNESS CENTRE AREA=75.61 SQ.MT. 50.37 TOTAL ADDITIONAL LOS = 809.86 SQ.MT. PROPOSED FITNESS CENTRE AREA=166.49 SQ.MT. 0.10 M.W. VERTICAL FINS EXCESS FITNESS CENTRE AREA COUNTED IN FSI.=90.88 SQ.MT. SPACE FOR 1.50 1.50 1.50 1.50 FRD SMOKE CHECK LOBBY DUCT LETTER BOX FOR WING 'B' 4.36X4.92 3.80 9.95 6.15 6.81 HT-16.14 MT. 0.10 M.W. VERTICAL FINS 1.85X1.50 .W.LIN PODIUM LINE. 0.50 FIRE UP EVACUATION LIFT Y PODIUM LINE. DN 1.50 1.85X1.85 L/V L/V D/W L/V 26.96 D/W FRD F.D. E.D. L.V. OPEN TO SKY 9.00 (+) 14.45 M LVL BLDG.LINE ABOVE. 7.54 LOBBY (+) 15.05 M LVL 6.89X2.86 WING- 'B' UP EXISTING STRUCTURE TO BE RETAIN L/V 0.10 M.W. VERTICAL FINS 8.08 L/V L/V K ROA ENTRANCE LOBBY WING- 'B' 4.45X16.25 FILE NO. CE/8557/BSII/AR 20.73 (+) 15.05 M LVL ADDITIONAL L.O.S. 1.50 MT. HIGH PARAPET WALL OPEN TO SKY D/W 8.46 D/W BLDG. NO.1 1.20 FIRE LIFT 2.45X2.15 LIFT 2.45X2.15 (+) 14.45 M LVL 6.14 1.50 MT. HIGH PARAPET WALL 6.12 SERVICE UTILITY AREA 6.89 5.20X1.82 3.20 +5.35X2.90 BLDG.LINE ABOVE. 2.03 9.46 SQ.MT. L/V TOILET D D/W 18.41 C R.C.C. WALL 7.05 1.25X1.88 C L/V PODIUM LINE. PODIUM LINE. 0.10 M.W. VERTICAL FINS VOID 6.90 BLDG.LINE ABOVE. 12.30 6.15 D/W VOID 3.80 9.94 6.14 L/V 5.45 BLDG.LINE ABOVE. 8.98 8.99 (+) 14.45 M LVL 8.69 0.10 M.W. VERTICAL FINS BLDG.LINE ABOVE. 7.01 2.65 ADDITIONAL L.O.S. 3.39 7.01 2.33 6.86 L/V 4.59 OPEN TO SKY 5.70 F1 PODIUM LINE. 1.50 MT. HIGH PARAPET WALL PODIUM LINE. PODIUM LINE. 6.14 0.10 M.W. VERTICAL FINS 0.10 M.W. VERTICAL FINS 1.50 MT. HIGH PARAPET WALL PODIUM LINE. 1.50 MT. HIGH PARAPET WALL 0.10 M.W. VERTICAL FINS 0.10 M.W. VERTICAL FINS 0.10 M.W. VERTICAL FINS 21.99 1.77 1.90 A 1.94 2.15 L/V 5.30 7.91 AMENITY FLOOR PLAN SOUTH 4.85 F2 11.30 5.45 Soc. 3.65 PLOT 'B' 3.85 1.60 F3 5.45 SOCIETY OFFICE AREA DIAGRAM FORM II (PROFORMA B) R.C.C. BEAM R.C.C. BEAM CONTENTS OF SHEETS AMENITY FLOOR PLAN. FITNESS CENTRE & SOCIETY OFFICE AREA CALCULATION. 2.90 2.90 2.40 DESCRIPTION OF PROPOSAL AND PROPERTY 1.50 VERTICAL FINS. PROPOSED REDEVELOPMENT OF EXISTING SOCIETY BUILDING KNOWN AS "OM SHRADDHA CHS. LTD." ON 3RD PODIUM FLR. 3RD PODIUM FLR. C.T.S. NO.258 A OF VILLAGE BORIVALI, JAYRAJ NAGAR, OFF NEW LINK ROAD, BORIVALI (W) MUMBAI. R.C.C. BEAM R.C.C. BEAM NAME & ADDRESS OF THE DEVELOPER SIGNATURE 2.90 2.90 Shri Mahek D. Modi Director MAHEK Digitally signed by MAHEK F4 2.40 Of Modi's Navnirman Ltd. C.A. to Owners DINESH MODI VERTICAL FINS. 1.50 SHOP No.1 RASHMI HEIGHTS, M.G. ROAD, 18.13 DINESH MODI Date: KANDIVALI (W) MUMBAI.400067. 2023.09.26 18:20:47 2ND PODIUM FLR. 2ND PODIUM FLR. +05'30' FITNESS AREA CALCULATION R.C.C. BEAM SIGNATURE, NAME AND ADDRESS OF LICENSED SURVEYOR SIGNATURE 1.43 M/S.SANJAY B SHAH. Digitally signed by SANJAY BHAILAL SHAH TOTAL BUA = 3871.27 - 90.88 SQ.MT LICENSED SURVEYORS & ENGINEERS SANJAY DN: c=IN, postalCode=400067, st=MAHARASHTRA, street=ARIHANT BUILDING11 BALASINOR CHSL SV ROADMUMBAI 400067, l=MUMBAI, o=Personal, title=4460, = 3780.39 SQ. MT. serialNumber=b21f8181f998f1d33b5bee7221209e6e0b13 BHAILAL 2c100c1891ff19a29bb1f3707b98, 3.60 3.60 PERMISSIBLE FITNESS CENTRE AREA 2A/3, PANCHVATI,S.V.ROAD, KANDIVLI(W), pseudonym=446020230428141641420, 2.5.4.20=6769f9b077d0a48f96bc259d11f1a6089a6a9eebee R.C.C. CROSS BEAM 4.20 194e22cab79f1ed4a5ee21, MUMBAI-67.Ph.-28022525,28021515. = 3780.39 X 2% SHAH email=SANB.SHAH@GMAIL.COM, cn=SANJAY BHAILAL SHAH 2.40 PROFESSIONAL PROFESSIONAL email-sanb.shah@gmail.com / sanjaibshah@gmail.com Date: 2023.09.26 18:26:40 +05'30' = 75.61 SQ.MT. OFFICE NO.1 OFFICE NO.2 1.43 JOB NO. DRG NO. SCALE CHK. BY DRN. BY REV DESCRIPTION DATE SIGN. 3468 S.No.3/6 AS SHOWN Kishor D. 26-09-2023 0.60 1ST PODIUM FLR. 1) THE DOCUMENT IS DIGITALLY AND NO PHYSICAL SIGN IS REQUIRED. 1ST COMM. FLR. R.C.C. SLAB N 2) THE PLANS ARE APPROVED SUBJEAT TO THE CONDTION MENTOINED IN THE IOD ISSUED UNDER EVEN NO.P-14887/2023/(258 A)/R/C Ward/BORIVALI-R/C/337/1/New R.C.C. SLAB ON EVEN DATE. 3) THE DRAWING SHALL BE READ IN CONJECTION WITH INTIMATION OF DISAPPROVAL ISSUED/UNDER SECTION 346 OF MMC ACT 1888 UNDER 1.20 P-14887/2023/(258 A)/R/C Ward/BORIVALI-R/C/337/1/New ON EVEN DATE. 4.90 4.90 4.20 SHOP NO.9 4.20 4.20 PLAN FOR APPROVAL 0.40 3.20 F5 F6 2.26 0.25 ENTRANCE LOBBY 0.15 5.45 PLINTH LVL. PLINTH LVL. GR. LVL. GR. LVL. FITNESS CENTRE AREA DIAGRAM SECTION Z-Z WING'A' Digitally signed by Swapnil Bhagawat Patil Ashvini Digitally signed by Ashvini Kishor Sonar Swapnil DN: c=IN, o=Personal, title=1222, pseudonym=4E47F2C4237A80DF682106E8B59BCE6 Digitally signed by DN: cn=Ashvini Kishor Sonar c=IN o=Personal EC8FC5E64, 2.5.4.20=820d5f33f377a63b0bdc5aa9137429c94a0b HANUMANT Kishor Reason: I am the author of this Bhagawat 86b6ebd7be20567cb1c0718b2f53, postalCode=425001, st=Maharashtra, HANUMANT SADASHIVRAO Sonar document Location: serialNumber=8FB399BD24C2D289313094AF60748 0B787166C8E1173291F2D3BF3DD7B387F1A, SADASHIVRAO BURE Date: 2023-09-26 18:48+05:30 Patil cn=Swapnil Bhagawat Patil Date: 2023.09.27 16:35:04 +05'30' Adobe Acrobat Reader version: 2023.006.20320 BURE Date: 2023.09.27 17:18:42 +05'30' S.E.B.P.-R7. A.E.B.P.-R/E 2. E.E.B.P.(WS) R1.