2.84 4 0.22 c .00 17 2.76 3 8 8.4 b 5 .7 2 33 SETBACK 1 18.41 7 47.9 06 17. PLOT AREA a Coping Compound Level 1.5000 Compound wall 0.23 mts thick + 0.60 mts Road Level 0.6000 +0.0mts 2.43 till hard strata below Section through Compound Wall Plot Area Diagram Scale 1:100 (Scale 1:100) Staircase Area Diagram (Ground) 1.96 1.89 B RERA Carpet Area Diagram ne 0.33 Built up Area Diagram (Ground)commcercial (Ground)commcercial Factory La F 0.21 0.21 A 5.60 0.32 C 1.47 D 1.14 E 5 6 6.10 0.33 0.53 10.52 4.93 2 oad 1.88 8 9 1.50 7.50 ST-1 2.22 gR 1 1.79 2.31 G 3.38 5.75 12.57 1 stin 4.45 1.88 4 TPS 1.50 1.83 0.77 2.47 2 BORIVALI- III Exi . 2 1.28 1.28 I H 1.20 R.L 3.56 3 0.85 1.96 ts. 0.89 16.70 1 mts 4.35 1.83 0M ST-2 F.P.NO 151 Shop 9.1 F.P.NO 152 30 R/C 4.48 10.62 18. I.T./I.T.E.S 168.78 Am 3.63 4 3.71 7 80.82 ba ma ta m and ed a 10.92 ir 10 pos 7.56 493.19 Pro b 3 1.73 1.73 5 3.48 6.26 1914.17 Shimpoli R C 6 oad 2.50 2.50 3.56 6.18 18.32 A rea b ack N Set 8 9 11 10 6.41 1.55 N GATE 4.66 3.52 3.49 CANOPY ABOVE 4.55 Location Plan Scale 1:1000 W E Building 13.14 projection above 2.85 Existing Road 9.10 mts 18.3000 6.73 6.18 1.50 3.37 D B WR C 4.87 12.8625 S 83 4.00 6.50 5.95 E.C 3. lot ENT. 17 FIRE PANEL PROJECTION P PARKING 13/15 LOBBY FOR CHAJJA ABOVE 3.83 g Proposed 18.30 mts. Road tin 3.75 CHAIN LINK GATE WITH REMOVABLE RESIDENTIAL 3.73 Main Existing Structure to be demolished operating Exis dary switch GATE 5.95 X 3.73 ABOVE 1.50 1.50 5.60 2.01 FRD 12.58 1.75 n 0.25 bou Openable fixed Glass Panel S.E.B.P R-7 A.E.B.P R/C E.E.B.P R/C fixed Glass Panel 4.56 (Existing 13.40 mts. Road) PARKING 16 Toilet E.C Openable LIFT LIFT 2.30 x 1.20 1.50 16 PARESH Digitally signed BALLARDS 1.97 2.02 14 0.15 7 4.50 x x 2.07 VIJAY by PARESH VINOD Digitally signed by Digitally signed by VIJAY SURYAKA SURYAKANT VINOD KONDIRAM PROJECTION 2.07 2.07 UP MACHINDR PROJECTION MACHINDRA BADADE 1.58 DN 1.50 RCC Wall 13 A BADADE Date: 2021.12.30 19:52:16 +05'30' NT PANCHAL KONDIRAM KEKAN Date: 2022.01.04 Date: 2022.01.07 KEKAN ABOVE PANCHAL 12:33:49 +05'30' ABOVE 10.52 x 3.59 17:57:01 +05'30' 1.58 GATE NO COMPOUND WALL 14.81 1.50 1.50 W 15 FORM-II plot SHOP I.T / I.T.E.S 7.50 X 10.62 E 2.75 16.70 X 07.56 ting CONTENTS OF SHEET Exis ndary 10.92 A PARKING 17 12 A 4.50 z FLOOR PLANS z BLOCK PLAN z LOCATION PLAN Bou z AREA DIAGRAM z AREA CALCULATION PROJECTION 4.00 F.R.S 4.66 JOB No : BB/01/2021 Drawn By : Kinjal 4.55 GATE 9.10 mts PROJECTION 1.50 ABOVE UP FRD Drawing No : BB/IOD/01 Checked By : Pramod PARKING 14/18 4.87 83 Scale No : As shown Date : 15.12.2021 ABOVE 1.58 3. Proposed18.30 mts. Road 6 3.83 DESCRIPTION OF PROPOSAL AND PROPERTY LIFT 3.75 4.50 COMM. Toilet Toilet Toilet 1.60 x 2.73 ENT. FRD 1.35 x 1.35 x 1.42 x 5 SECURITY S.TOILET 1.00 2.27 LOBBY Openable Toilet 4.50 Proposed Construction of Residential/Commercial building on plot bearing F.P.No.151 & 152, TPS-III, Borivali , Existing Road CABIN 1.22 x UP Openable 1.90 1.90 1.90 1.67 x 1.25 1.25 2.10 fixed Glass Panel fixed Glass Panel 2.30 x 1.20 Tal. Borivali, MSD, Next to Amba Mata Mandir, Rajada Chawl, Factory lane, Borivali (west), Mumbai 400092 D 1.75 4.52 1.00 WR GATE 0.73 PROJECTION 1.20 Architect's Plot Area Certificate : Signature of Architect Existing 13.40 mts. Road 3.56 4 ABOVE 24.50 Gr.+2 upper floor Revas 4.08 CANOPY Projection ABOVE CERTIFIED THAT I HAVE SURVEYED THE PLOT UNDER REFERENCE ON 06.07.2021 Building 2 GATE AND THAT THE DIMENSIONS OF THE SIDES ETC OF THE PLOT STATED ON THE 3.75 3.75 projection above 3.60 B C 3.75 Terrace Open to Sky 3.03 3.24 Gr.+2 upper floor + service floor PLAN AREA AS MEASURED ON SITE AND AREA SO WORKED OUT FOR LESSER Pramodkumar Digitally signed by Pramodkumar GATE 2.40 PLOT IS 995.40 SQ.MTS. ( Nine Hundred Ninety Five point forty sq.Meter) AND TALLIES 2.65 + 4th to 11th floor + 12th (part) Pravinchandra Shah WITH THE AREA STATED IN THE DOCUMENT OF OWNERSHIP/TOWN PLANNING Pravinchandra Shah Date: 2021.12.30 14:03:55 +05'30' 3 1 4.87 4.50 SCHEME RECORDS. 13.3770 3.75 3.75 3.75 S Ground floor Plan N Block Plan N E (Scale 1: 100) W 18.2999 S E Name of Owner Authorized Signatory (Scale 1: 250) W B.B.Enterprise ISHAN RAJESH Digitally signed by ISHAN RAJESH MEHTA Date: 2021.12.30 14:06:09 S MEHTA +05'30' Name of Architect Signature of Architect Pramod Shah 703/7thfloor, Raj Avenue, Road No.7, Pramodkumar Digitally signed by Pramodkumar Daulat Nagar, Borivali (east), Mumbai-66, Email: pramodshah388@ gmail.com. Pravinchandra Pravinchandra Shah Date: 2021.12.30 M:9833388331 Shah 14:03:36 +05'30' (Reg. No. CA/90/13101) 6.96 4.60 D B C 3.71 0.60 PARKING 35 cross beam Chajja Projection 1.35 0.60 with double height 1.50 1.50 12.32 6.11 1.75 0.25 0.60 mt high Parapet wall PARKING 36 4.29 E.C 0.60 mt high Parapet wall LIFT LIFT 1.50 PLATFORM FOR CAR PARKING TOWER 1.97 2.02 x x SERVICE AREA RCC Wall 2.07 2.07 WR UP 12.17 x 3.82 4.20 DN 1.50 R.C.C Wall 13.34 FRD 14.71 6.00 RCC Wall Lift lobby E 4.45 x 2.60 lobby 4.94 x 3.51 RCC Wall 1.45 Service Service Area for Drainage Duct 7.09 x 2.75 FRD 2.75 PARKING 37 4.42 RCC Wall above 0.60 high Raised Platform for Roof Top of Premises A A RCC Wall Service Duct Drainage line laid to slope 1.45 FRD above 0.22 SERVICE AREA 14.69 x 5.58 FRD PARKING 38 1.47 SERVICE AREA RCC Wall 4.28 7.09 x 3.90 1.00 1.38 UP 2.20 0.60 mt high Parapet wall D 1.75 0.60 mt high Parapet wall 0.60 mt high Parapet wall 0.60 mt high Parapet wall WR 1.00 WR Chajja Projection 1.10 S.S 6.73 0.60 E 3.20 4.22 3.98 1.60 B 3.82 C 4.55 9.04 Service Floor Plan (Scale 1: 100) 1.60 2.30 1.60 3.28 0.50 0.50 S. slab S. slab 0.59 3.71 8.92 3.40 1.10 6.41 CHAJJA ABOVE B CHAJJA ABOVE C 1.47 6.73 D B C WR Staircase Area Diagram (8th floor ) TOILET TOILET fixed Glass Panel 3.48 0.50 KITCHEN 2.30 x 2.75 1.81 Bal. 1.30 X 2.75 1.22 X 2.75 Staircase Area Diagram (7th floor ) BEDROOM CHAJJA ABOVE 0.50 BEDROOM 0.96 0.60 4.16 3.05 X 3.90 4.28 x PARKING 27/31 3.90 3.05 X 3.90 4.65 PLATFORM FOR CAR PARKING TOWER 1.50 1.50 I.T./I.T.E.S 0.60 0.33 1.75 2.01 0.33 05.95 X 03.75 1.50 1.50 0.25 0.24 1.46 CHAJJA ABOVE 1.00 1.60 x 0.91 0.75 G G 1.15 x 2.89 4.03 1.75 0.25 5.60 12.73 x 1.00 22 4.28 RCC Wall PASSAGE 1.30 D 16 3.38 fixed Glass Panel 2.01 E 1.68 Openable fixed Glass Panel LIFT LIFT 0.33 PARKING 28/32 Openable 1.50 0.23 E.C 1.97 2.02 3.38 1.94 B CHAJJA ABOVE LIFT LIFT 1.50 CHAJJA 0.50 BAL. x x ABOVE 1.97 2.02 1.46 LIVING + DINING UP 1.50 x 2.07 2.07 WR M 4.28 5.49 X 3.13 1.50 x x x 5.21 RCC Wall 2.37 2.07 2.07 UP 18.17 x 3.59 3.13 DN 1.50 0.20 4.88 4.45 F N DN 1.50 FRD 1 ST-4 2.97 2.97 2 Openable fixed Glass Panel RESIDENTIAL LIFT LOBBY FRD 1.46 0.75 4.20 R.C.C Wall 2.47 x 0.85 5.95 x 2.38 8 4.28 6.25 1.58 2.21 x 1.53 4.75 4.97 7 6 E2 FRD 3.56 4.60 0.33 14.81 0.25 1.20 FRD 3.20 3 0.30 RCC Wall TERRACE 1.45 E 1.50 1.58 BAL. x E.C OPEN TO SKY I 15 1.46 LIVING + DINING 1.83 FRD A 2.53 9 3.25 K I 14.81 FRD 2.68 x 4.29 X 3.13 3.13 2.75 2.59 H 1.76 1.76 L I.T /I.T.E.S A W.C 4.42 W.C 1.04 x A 0.45 2.13 1.53 0.30 4.55 2.75 0.50 1.53 4.68 1.50 2.21 10.92 PARKING 29/33 25.70 X 07.56 1.10 1.00 1.98 Duct for 1.50 2.21 A A X Duct for Toilet ventilation X toilet 1.20 1.82 ventilation C 4.42 J 2.75 X 11.15 1.00 1.00 x 4.49 4.80 UP x 1.00 PASSAGE 3.19 12 1.45 R.C.C WALL 0.50 1.50 DN FRD R.C.C WALL Bal. PARKING 30/34 4.28 0.50 x Society 4.28 9.07 BEDROOM KITCHEN TOILET TOILET 3.90 BEDROOM Office 1.37 3.05 X 3.90 2.30 x 2.75 LIFT 3.05 x 3.90 3.59 x 3.90 5 1.30 X 2.75 1.22 X 2.75 1.50 x Toilet Toilet Toilet 18.23 sq.mts 1.60 x 4.20 4.28 4.28 FRD 1.00 1.75 1.00 2.58 1.35 x 1.35 x 1.42 x 13 1 17 4.20 2.75 1.00 2.27 1.90 1.90 0.60 23 1.48 2.99 UP 1.90 2.10 Openable fixed Glass Panel Openable fixed Glass Panel 0.55 0.55 0.59 2.20 D fire staircase for 1.10 CHAJJA ABOVE 1.10 WR 1.00 WR S. slab S. slab CHAJJA ABOVE 6.68 1.45 2.44 3.25 0.73 0.51 parking tower 7.33 4.57 1.10 mt. wide Chajja Projection 1.10 E 0.60 1.60 2.30 1.60 B C 11.34 6.02 3.25 4 2.75 4.21 E 3.33 24.55 B C 6.02 2nd Floor Plan (Scale 1: 100) 8TH FLOOR PLAN Built up Area Diagram (8th floor)Residential Built up Area Diagram (7th floor)Residential 0.50 6.41 6.96 4.65 3.71 8.92 2.85 1.47 6.73 B C Staircase Area Diagram (3rd,4th to 6th floor ) D B WR C cross beam fixed Glass Panel 3.48 with 0.60 0.33 double height G 1.81 CHAJJA ABOVE 3.40 PARKING 27/31 0.96 4.16 2.01 D 1.50 1.50 0.20 E PLATFORM FOR CAR PARKING TOWER 1.68 0.33 I.T/I.T.E.S 0.60 2.01 R.C.C Wall 1.75 0.20 0.24 05.95 X 03.75 0.25 3.38 RCC Wall 1.50 1.50 1.46 L.M.R. OF CHAJJA ABOVE 0.75 B 1.75 0.25 5.60 12.73 PARKING TOWER 1.30 6.50 x 10.23 fixed Glass Panel LIFT LIFT Openable Openable fixed Glass Panel 1.50 PLATFORM FOR CAR PARKING TOWER PARKING 28/32 F E.C ST-4 2.97 2.97 1.97 2.02 2 10.31 1.94 CHAJJA ABOVE LIFT LIFT BEDROOM BEDROOM 1.50 4.20 CHAJJA KITCHEN 4.28 x x LIVING + 1.97 2.02 ABOVE 2.44 x 2.75 3.05 x 2.75 3.10 X 3.82 8 4.97 2.07 2.07 WR UP DINING x x 1.50 x 1.50 5.11 x 3.05 4.28 4.75 3.56 7 6 2.07 2.07 2.37 UP RCC Wall 18.17 x 3.59 DN 1.50 3.20 3 1.50 FRD A I 3.25 2.53 9 DN Openable fixed Glass Panel R.C.C Wall R SI ESIDENTIAL LIFT LOBBY FRD 2.06 x 1.00 3.96 x 1.00 5.95 x 2.38 H 1.76 1.76 14.81 2.47 x 0.85 FRD PASSAGE 0.75 PASSAGE 1.58 E 2.21 x 1.53 1 FOYER 0.45 2.13 FRD 4.55 14.81 0.25 AREA 4.68 1.50 2.21 0.30 RCC Wall 1.45 E 1.50 1.58 E.C 2 1.35 x TOILET TOILET 3.25 C 11.15 2.06 2.75 FRD 1.83 x 1.30 FRD 2.14 x 1.30 4.65 X 1.90 I.T /I.T.E.S 25.70 X 07.56 A A 4.42 2.75 2.59 A 10 10.42 2.75 1.53 TOILET 1.45 10.92 Duct for TOILET A PARKING 29/33 A R.C.C WALL Duct for Toilet ventilation FOYER AREA 1.83 x 1.30 toilet 2.14 x 1.30 ventilation R.C.C WALL 2.24 x 2.89 3.96 x 1.00 2.06 x 1.00 1.20 MT. HIGH PARAPET WALL UP PASSAGE PASSAGE 5 1.50 Refuge Area FRD DN R.C.C WALL .C. 4.28 11 4.28 CHAJJA ABOVE FRD provided 34.77 sq.mts. 4.20 1 PARKING 30/34 4.50 4.28 R.C.C WALL TOILET LIVING + DINING KITCHEN BEDROOM BEDROOM 1.37 4.32 x 5.43 2.44 x 3.26 3.05 x 3.26 LIFT 3.10 x 3.90 15.07 1.45 2.44 3.25 1.22 X 2.14 0.51 1.50 x Toilet Toilet Toilet 1.00 1.75 1.00 1.60 x FRD 2.58 1.35 x 1.35 x 1.42 x 0.60 0.75 2.75 1.00 2.27 1.90 1.90 1.20 MT. HIGH PARAPET WALL 1.20 MT. HIGH PARAPET WALL 4 1.48 UP 1.90 2.10 Openable fixed Glass Panel Openable fixed Glass Panel 0.55 0.59 2.20 D WR 1.10 6.02 1.10 CHAJJA ABOVE fire staircase for WR 1.00 WR S. slab CHAJJA ABOVE 0.73 parking tower CANOPY SLAB 1.10 mt. wide Chajja Projection 1.10 E Built up Area Diagram (3rd,4th to 6th floor)Residential 1.60 B C 11.34 6.02 3.25 E 2.75 4.21 3.33 B C 24.55 7TH FLOOR PLAN (REFUGE FLOOR) 1st Floor Plan (Scale 1: 100) Plan for Consideration S.E.B.P R-7 A.E.B.P R/C Digitally signed by PARESH Digitally signed by VINOD VINOD KONDIRAM Digitally signed by PARESH SURYAKANT 6.96 4.65 3.71 VIJAY VIJAY MACHINDRA SURYAKAN PANCHAL KONDIRAM KEKAN Staircase Area Diagram (1 & 2nd floor ) 8.92 Date: 2022.01.04 Date: 2022.01.07 D B C MACHINDR BADADE T PANCHAL 12:34:11 +05'30' KEKAN 17:57:15 +05'30' 13.14 Date: 2021.12.30 D B C A BADADE 19:53:10 +05'30' cross beam with 0.60 3.40 E.C Ventilation Through 3.48 Parking Pit 1.89 PARKING 43/47/51 double height CHAJJA ABOVE 6.41 3.15 FORM-II PARKING 01/05/09 4.16 Space for 1.50 1.50 0.60 0.33 CONTENTS OF SHEET Electric Meter 3.00 0.60 12 G Flushing 1.75 2.01 3.87 X 0.25 1.55 0.24 1.47 CHAJJA ABOVE 2.79 X 3.58 U.G.Water 0.75 z FLOOR PLANS z BUILT UP AREA DIAGRAM 1.47 5.57 FRD 3.58 Tank 0.16 D 1.14 E 0.33 z AREA DIAGRAM z AREA CALCULATION 0.53 12.58 1.30 for PARKING 44/48/52 Commercial 6.33 1.98 10000 lit cap. LIFT LIFT 1.50 11 3.33 8 9 JOB No : BB/01/2021 Drawn By : Kinjal PLATFORM FOR CAR PARKING TOWER PARKING 02/06/10 1.97 2.02 1.94 Drawing No : BB/IOD/02 Checked By : Pramod CHAJJA ABOVE BEDROOM BEDROOM 1.50 Domestic x x CHAJJA ABOVE LIVING + KITCHEN 3.05 x 2.75 3.10 X 3.82 5.75 12.57 U.G.Water 2.07 2.07 WR UP DINING 2.44 x 2.75 Scale No : As shown Date : 15.12.2021 X Flushing Tank Fire U.G.Water Tank 1.50 5.11 x 3.05 4.28 G H 1 1.64 3.51 F 1.94 U.G.Water 2.37 1.50 SUMP Tank for 100000 lit cap. 4.12 DN ST-4 1.88 ST-3 DESCRIPTION OF PROPOSAL AND PROPERTY R.C.C Wall 49.47 sq.mts 13.34 for Residential Commercial FRD 0.97 20000 lit cap. RESIDENTIAL LIFT LOBBY Pit for Parking 10000 lit cap. FRD 3.96 x 1.00 2.06 x 1.00 2 13.34 1.28 5.95 x 2.38 R.C.C Wall 14.81 0.75 2.47 X 0.85 Proposed Construction of Residential/Commercial building on plot bearing F.P.No.151 & 152, TPS-III, Borivali , Tower 1.58 FRD E 2.21 x 1.53 1 FOYER PASSAGE PASSAGE 3 0.85 3.25 1.00 FRD AREA Tal. Borivali, MSD, Next to Amba Mata Mandir, Rajada Chawl, Factory lane, Borivali (west), Mumbai 400092 0.30 SUMP 1.45 0.89 1.96 E E.C 3 2 1.35 x TOILET TOILET 3.25 2.06 1.83 x 1.30 FRD FRD 2.14 x 1.30 ST-2 Pump Room 2.75 2.59 4.48 FOYER AREA FOYER AREA A PARKING 45/49/53 A TOILET 4.42 SUMP 14.89 2.75 FRD 4.68 X 2.03 Domestic 1.53 1.14 x 1.83 TOILET Duct for TOILET 3.63 4 3.71 7 1.00x 2.13 1.15X 1.83 A PARKING 03/07/11 U.G.Water A Duct for Toilet ventilation 10.92 1.83 x 1.30 toilet 2.14 x 1.30 Tank ventilation a SUMP 4.05 for Residential 30000 lit cap. 3.96 x 1.00 2.06 x 1.00 3.56 10 PASSAGE 4.35 1.83 PASSAGE Name of Owner Authorized Signatory 1.50 UP PARKING 46/50/54 FRD b CHAJJA ABOVE PARKING 04/08/12 1.73 1.73 5 B.B.Enterprise Digitally signed by ISHAN A.H.U Room LIVING AREA 4.28 3.48 ISHAN RAJESH RAJESH MEHTA 1.58 TOILET 1.37 BEDROOM + LIVING + DINING KITCHEN BEDROOM 6.26 BEDROOM Date: 2021.12.30 14:05:56 4.68 X 4.93 4.48 3.05 x 3.90 ALCOVE 4.32 x 5.43 2.44 x 3.26 3.05 x 3.26 3.10 x 3.90 MEHTA +05'30' LIFT 1.00 1.75 1.00 1.00 1.22 X 3.90 3.59 x 3.90 2.43 COMM. 2.75 1.60 x 1.48 UP 2.27 ENT. FRD 0.60 0.75 2.50 c 2.50 6 Name of Architect Signature of Architect 1.48 LOBBY D fire staircase for 1.00 0.55 0.59 parking tower D WR 0.73 0.38 3.56 S. slab 1.10 CHAJJA ABOVE CHAJJA ABOVE 1.10 6.18 18.32 Pramod Shah 703/7thfloor, Raj Avenue, Road No.7, Pramodkumar Digitally signed by Pramodkumar 6.73 8.69 E Daulat Nagar, Borivali (east), Mumbai-66, 2.75 3.98 1.60 B C 11.34 6.02 3.25 0.60 Email: pramodshah388@ gmail.com. Pravinchandra Pravinchandra Shah Basement & Pit parking floorE Plan B C 3RD TO 6TH FLOOR PLAN Built up Area Diagram (1 & 2 nd floor)commercial M:9833388331 Shah Date: 2021.12.30 14:04:25 +05'30' (Reg. No. CA/90/13101) (Scale 1: 100) Railing Railing Railing 0.95 LIFT MACHINE ROOM & OHT. ABOVE 0.20M. FREE BOARD L.M.R. & OHT. ABOVE LIFT MACHINE 3.15 4.75 ROOM DOMESTIC DOMESTIC FIRE TANK TANK TANK 6.25 Parapet wall 10.40 Parapet wall Parapet wall Parapet wall 1.50 mt. high 1.50 mt. high 1.50 mt. high 1.50 mt. high 3.10 3.10 3.10 LIFT LIFT C 1.50 1.50 1.50 1.50 TERRACE A.V.S LOBBY 0.60 SHAFT TERRACE FLOOR LEVEL TERRACE FLOOR LEVEL H 0.60 Chajja 1.10 O Parapet wall 1.10 0.60 1.50 mt. high 3.20 3.20 0.59 3.20 WC 3.20 3.20 W LIFT 1.50 0.15 TERRACE 0.60 BEDROOM LOBBY BEDROOM 8TH FLOOR LEVEL BALC. LIVING TOILET 8TH FLOOR LEVEL 0.60 0.60 K 8TH FLOOR LEVEL Society office Terrace Area Lift lobby 0.60 Chajja 1.10 2.65 1.10 0.60 RCC 3.20 3.20 3.20 3.20 3.20 0.59 RCC WALL Parapet wall WALL Refuge LIFT L.M. R.PARKING TOWER Area 1.20 0.60 REFUGE LOBBY BEDROOM 7TH FLOOR LEVEL FOYER AREA LIVING TOILET TOILET 7TH FLOOR LEVEL 7TH FLOOR LEVEL(REFUGE FLOOR) 0.60 REFUGE AREA FOYER AREA Lift lobby 0.60 Chajja 2.95 3.10 1.10 0.60 1.10 2.90 SERVICE 2.90 2.90 2.90 1.30 LIFT Cross Beam PLATFORM 0.60 BEDROOM 1.00 FOYER FOYER LIVING TOILET TOILET 0.60 LOBBY 6TH FLOOR LEVEL 1.47 TOILET AREA AREA 6TH FLOOR LEVEL 6TH FLOOR LEVEL LIVING + ALCOVE FOYER AREA Lift lobby 2.20 2.20 Chajja 0.60 1.10 0.60 1.10 2.90 SERVICE 2.90 2.90 2.90 1.30 LIFT Cross Beam PLATFORM 0.60 BEDROOM 1.00 FOYER FOYER LIVING TOILET TOILET 0.60 LOBBY 5TH FLOOR LEVEL 1.47 2.20 TOILET AREA AREA 5TH FLOOR LEVEL 5TH FLOOR LEVEL LIVING + ALCOVE FOYER AREA Lift lobby 2.20 Chajja 0.60 13.40 1.10 1.10 2.90 2.90 2.90 2.90 0.60 SERVICE 1.30 LIFT Cross Beam PLATFORM 2.20 2.20 BEDROOM 1.00 FOYER FOYER LIVING 0.60 LOBBY 4TH FLOOR LEVEL TOILET AREA AREA TOILET TOILET 4TH FLOOR LEVEL 4TH FLOOR LEVEL LIVING + ALCOVE FOYER AREA Lift lobby 1.47 31.20 Chajja 31.20 31.20 0.60 1.10 A.V.S 1.80 1.10 0.60 2.90 SERVICE 2.90 2.90 2.90 1.30 28.00 28.00 LIFT Cross Beam PLATFORM BEDROOM 1.00 FOYER FOYER LIVING TOILET TOILET LOBBY 3RD FLOOR LEVEL 1.47 TOILET AREA AREA 3RD FLOOR LEVEL 3RD FLOOR LEVEL LIVING + ALCOVE FOYER AREA Lift lobby 1.80 1.80 25.35 25.20 0.60 SERVICE 6.00 Service Area 1.80 1.80 1.80 1.80 1.80 1.80 LIFT 1.30 Service Area 1.35 0.60 for Drainage line 0.60 PLATFORM SERVICE AREA 2.90 0.60 LOBBY SERVICE FLOOR LEVEL SERVICE FLOOR LEVEL SERVICE FLOOR LEVEL SERVICE AREA 1.80 1.80 Chajja 1.47 0.75 0.75 0.60 3.45 3.45 3.45 3.30 3.45 1.80 1.80 4.95 SERVICE 2.90 0.60 IT OFFICE IT OFFICE 1.30 0.60 STAIR WELL 0.60 PLATFORM IT OFFICE LIFT LOBBY 2ND FLOOR LEVEL 2ND FLOOR LEVEL 2ND FLOOR LEVEL IT OFFICE 1.80 1.47 Chajja 1.80 0.75 0.75 0.60 3.45 3.45 3.45 3.45 3.45 0.60 2.75 1.80 2.90 11.40 1.80 IT OFFICE IT OFFICE SERVICE 0.60 0.60 1.30 IT OFFICE 1ST FLOOR LEVEL 0.60 0.60 LIFT LOBBY 1ST FLOOR LEVEL PLATFORM IT OFFICE 3.75 1ST FLOOR LEVEL Canopy projection 1.47 1.80 Chajja projection 0.60 Canopy Canopy 1.80 1.15 1.20 2.85 1.20 2.85 2.85 Existing 4.20 4.20 Exisitng compound wall 4.20 4.20 4.20 compound wall 3.65 Shop 3.80 2.90 COMMERCIAL RESIDENTIAL PLITH/GROUND FLOOR LEVEL 2.90 3.11 ENTRANCE ENTRANCE PLINTH/GROUND PLINTH/GROUND +0.30M. 0.30 1.35 1.50 0.15 LOBBY LOBBY 1.50 FLOOR LEVEL,+0.30M. 0.15 IT OFFICE 1.50 FLOOR LEVEL,+0.30M. 1.50 0.30 1.50 4.20 IT OFFICE FINISH GROUND LEVEL FINISH GROUND LEVEL FINISH GROUND LEVEL FINISH GROUND LEVEL FINISH GROUND LEVEL FIN. GR. LVL ±0.00M. ±0.00M. ±0.00M. ±0.00M. ±0.00M. ±0.00M. LIFT 1.70 0.15 1.50 1.65 PIT 2.20 2.20 3.90 3.90 3.90 3.90 UG Tank behind 3.90 PUMP ROOM AHU FLUSHING TANK FLUSHING TANK SPACE FOR PUMP ROOM 2.40 DOMESTIC U.G.W. TANK 2.25 LIFT 2.10 ELECTRIC METERS 2.20 LOBBY 2.20 BASEMENT 6.65 Parapet wall 1.50 mt. high Pit parking 0.20 0.50 2.20 2.20 0.10 1.50 SECTION C-C 0.20 0.45 TERRACE FLOOR LEVEL 0.60 Drain pit SECTION B-B 3.20 SECTION AA 0.10 0.20 8TH FLOOR LEVEL 0.60 1.10 S.S 0.50 SUMP SECTION DD 0.55 3.20 0.20 0.10 7TH FLOOR LEVEL(REFUGE FLOOR) 1.10 0.50 0.60 SUMP S.S 0.55 2.90 0.20 0.10 6TH FLOOR LEVEL 1.10 0.50 0.60 SUMP S.S 0.55 2.90 0.20 0.10 5TH FLOOR LEVEL 1.10 0.50 0.60 SUMP S.S 0.55 2.90 0.20 0.10 4TH FLOOR LEVEL 1.10 0.50 0.60 SUMP S.S 0.55 0.20 0.10 3RD FLOOR LEVEL 1.10 0.50 0.60 SUMP S.S 0.55 1.80 1.60 2.30 1.60 4.65 service floor 0.50 0.50 S. slab S. slab 0.59 3.71 8.92 3.40 1.10 B C Plan for Consideration 3.45 S.E.B.P R-7 A.E.B.P R/C CHAJJA ABOVE VIJAY Digitally signed by PARESH Digitally signed by PARESH SURYAKANT VINOD Digitally signed by VIJAY MACHINDRA VINOD KONDIRAM 4.28 4.16 0.60 2nd FLOOR LEVEL STAIRCASE MACHINDR BADADE SURYAKAN PANCHAL KONDIRAM KEKAN Date: 2022.01.04 Date: 2022.01.07 1.50 1.50 Date: 2021.12.30 2.01 0.60 Lift shaft A BADADE 19:53:29 +05'30' T PANCHAL 12:34:34 +05'30' KEKAN 17:57:35 +05'30' 1.75 0.25 CHAJJA ABOVE 0.75 3.45 1.30 LIFT LIFT 1.50 FORM-II 1.97 2.02 1.94 CHAJJA ABOVE x x CHAJJA ABOVE 1st FLOOR LEVEL STAIRCASE CONTENTS OF SHEET 2.07 2.07 WR UP 4.28 1.50 TERRACE DN 1.50 z FLOOR PLANS z BLOCK PLAN z LOCATION PLAN Above 8th floor z AREA DIAGRAM z AREA CALCULATION RESIDENTIAL LIFT LOBBY FRD 0.75 5.95 x 2.38 6.25 JOB No : BB/01/2021 Drawn By : Kinjal 2.21 x 1.53 4.20 FRD Drawing No : BB/IOD/03 Checked By : Pramod 0.30 TERRACE 1.45 E.C Above 7th floor Scale No : As shown Date : 15.12.2021 FRD FRD 0.30 DESCRIPTION OF PROPOSAL AND PROPERTY A 4.42 2.75 A 2.59 STAIRCASE 1.53 Duct for FINISH GROUND LEVEL Duct for Toilet ventilation toilet Proposed Construction of Residential/Commercial building on plot bearing F.P.No.151 & 152, TPS-III, Borivali , ventilation Basement Tal. Borivali, MSD, Next to Amba Mata Mandir, Rajada Chawl, Factory lane, Borivali (west), Mumbai 400092 Name of Owner Authorized Signatory 4.28 4.28 B.B.Enterprise ISHAN RAJESH Digitally signed by ISHAN RAJESH MEHTA Date: 2021.12.30 14:05:43 MEHTA +05'30' 0.60 Name of Architect Signature of Architect 0.55 1.10 S. slab S. slab CHAJJA ABOVE CHAJJA ABOVE 1.10 SECTION E-E Pramod Shah 703/7thfloor, Raj Avenue, Road No.7, Pramodkumar Digitally signed by Pramodkumar 1.60 B C 0.60 Daulat Nagar, Borivali (east), Mumbai-66, Pravinchandra Pravinchandra Shah 2.30 1.60 11.34 6.02 3.25 Email: pramodshah388@ gmail.com. Date: 2021.12.30 14:04:39 M:9833388331 Shah +05'30' TERRACE FLOOR PLAN (Reg. No. CA/90/13101) 1.15 0.08 0.08 6 3.75 4.65 0.24 0.16 0.24 4 3 1.43 301 501 5 6 7 0.24 0.16 0.24 0.45 401 601 5.64 2.80 5 3.82 5 6 7 0.45 5.64 2.80 2 2.30 3.73 3.66 0.50 4.73 1 4 7.10 701 0.53 0.53 3.66 3.66 12.17 5.95 4 1.35 1 6 7 5.03 2.14 12.17 702 1 2.06 2 5.59 1.35 1.45 1.45 3 12.58 801 2 2.37 2.24 1 2.06 2 7.00 3.06 2.29 1.45 1.45 3 2.14 1.50 5.03 7 6.30 1.45 2.14 5 1.15 2.89 6 18.17 2.36 4 802 0.85 3 7.00 1.98 3 1.83 7 1.30 6 0.23 1.45 4 2.47 2.14 3.89 3.25 3.28 5.35 5 0.91 2 8.16 1 3.90 3 3.82 0.50 0.23 2 I.T /I.T.E.S 5.35 2 3 1 1 3.82 101 & 201 3.90 0.08 3.90 0.51 0.08 11.65 7.56 0.08 5 8 4 6.30 0.51 3.89 3.25 3.82 5.64 0.45 4 5 303 503 302 502 1 5.64 0.45 0.08 0.08 403 603 402 602 3 8.40 24.35 2 1.15 RERA Carpet Area Diagram (3rd,4th to 6th RERA Carpet Area Diagram (7th floor)Residential RERA Carpet Area Diagram (8th floor)Residential Carpet Area Diagram (1 & 2 nd floor)commercial floor)Residential 8.20 2.35 0.20 1.11 1.26 6.96 1.30 3.71 5.18 3.74 3.25 4.68 5.21 1 3.96 3.28 service area 2.86 4.12 3 4.28 4 56.49 2 ST 4.92 58.11 Parking Tower 6.73 14.81 124.34 5.06 1.91 1.91 1 2.29 1 5.33 2 2 1.98 4.65 Parking Lift Machine 2.14 Service area 3 Room 2.75 2.59 18.96 73.32 sq.mts. 4.65 3.59 3.74 3.25 6.96 18.23 sq.mts 3 Society Office 4.36 3.90 Service area service area 2 26.64 5.73 5.88 90.89 4.20 4.28 1 Parking Lift Machine Room Built Up Area Line Society Office Built Up Area Line Diagram 3.98 10.42 3.74 3.25 Diagram (12th floor) 0.73 Service Floor Area Built Up Area Line Diagram 0.76 1.53 1.55 Sec. cabin 1.48 S.Toil. 1.48 1.45 0.23 0.08 8.43 8 3.96 Plan for Consideration 6.73 6.41 1 S.E.B.P R-7 A.E.B.P R/C 2.00 0.53 Parking Tower VIJAY Digitally signed by PARESH Digitally signed by VINOD Digitally signed by 4 VIJAY MACHINDRA PARESH SURYAKANT VINOD KONDIRAM MACHINDR BADADE SURYAKANT PANCHAL KONDIRAM 6 98.50 KEKAN 13.34 3.48 7 Date: 2022.01.04 Date: 2021.12.30 PANCHAL 12:34:52 +05'30' Date: 2022.01.07 17:57:49 A BADADE 19:54:14 +05'30' KEKAN +05'30' 5.60 12.57 1 4.12 5 Parking Tower FORM-II 11.98 Pit Parking Basement 230.49 125.23 CONTENTS OF SHEET Area 13.34 21.65 89.74 1 z FREE OF FSI FLOOR PLANS z CARPET AREA DIAGRAM 2 10.85 z FREE OF FSI AREA DIAGRAM z CARPET AREA CALCULATION JOB No : BB/01/2021 Drawn By : Kinjal 6.76 Drawing No : BB/IOD/04 Checked By : Pramod 6.73 Scale No : As shown Date : 15.12.2021 4.05 3 DESCRIPTION OF PROPOSAL AND PROPERTY 2 2.20 Proposed Construction of Residential/Commercial building on plot bearing F.P.No.151 & 152, TPS-III, Borivali , 8.20 3.98 Tal. Borivali, MSD, Next to Amba Mata Mandir, Rajada Chawl, Factory lane, Borivali (west), Mumbai 400092 8.69 3.98 Name of Owner Authorized Signatory 2.75 2 0.73 3 Parking Lift Machine Room (Ground floor) B.B.Enterprise ISHAN RAJESH Digitally signed by ISHAN Parking Lift Machine Room (Pit area ) RAJESH MEHTA Built Up Area Line Diagram Built Up Area Line Diagram MEHTA Date: 2021.12.30 14:05:22 +05'30' Basement Area (Pump Room, space Electrical Parking Lift Machine Room (1st to 6th floor) Name of Architect Signature of Architect meters, AHU & U.G.W.Tank ) Built Up Area Line Diagram Built Up Area Line Diagram Pramod Shah 703/7thfloor, Raj Avenue, Road No.7, Pramodkumar Digitally signed by Pramodkumar Daulat Nagar, Borivali (east), Mumbai-66, Pravinchandra Pravinchandra Shah Email: pramodshah388@ gmail.com. Date: 2021.12.30 14:04:51 M:9833388331 Shah +05'30' (Reg. No. CA/90/13101)