CONCRETE CONCEPTS ENGINEERS/PROJECT MANAGEMENT CONSULTANTS . . 233, New Islampura, Bari Compound, Bhiwandi, District Thane - 421302. E-mail: concreteconcepts@rediffmail.com Phone: +919967867711. ANNEXURE A FORM-2A [See Regulation 3A.] ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor’s Certificate) (To be submitted at end of the Financial Year) Date: 31-07-2025 To, M/s. Pearl Infra F-48, Profit Centre, 90ft Road, Kandivali West, Mahavir Nagar, Mumbai Suburban, Borivali – 400067 Quality Assurance Certificate (Certificate No. 01 for the year ending 2023–2024) Subject : Certificate for quality of materials used and quality of construction and workmanship for the work of Ashiyana Apartment CHSL Ltd having MahaRERA Registration Number P51800054430 being developed by M/s. Pearl Infra Sir, I / We have undertaken the assignment of supervision of this real estate project. Our Responsibility. To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows: 1. Structural Design, Stability and Testing Sr. Parameters Yes No Remarks No. 1 Whether soil investigations of the site has been conducted Yes before the structural design and soil parameters have been accounted for in the structural design/ drawings? 2 Whether Structural Engineer has been appointed for the Yes Name: Mr. Fazal project? M. Momin License No: M/388/SS-II Mobile: 9819074654 E-mail: concreteconcept s@rediffmail.co m 3 Whether the inspection registers, site order book and Yes quality control test registers are maintained at the site properly and endorsed by the Engineer–in-Charge? 4. Whether testing facilities to check quality of material is Yes Only Cube testing available at site? is done by 3rd party Lab. 5. Whether the statuary provisions for disaster resistance/ Yes earthquake resistant design have been incorporated, specially in case of multistoried construction? 6. Has suitable cognizance been taken on demarcated flood lines Yes and appropriate precautions taken for protecting the site from flooding considering local flooding issues? 2. Input Materials Sr. Parameters Yes No Remarks No. 1 Whether the following building materials confirm to relevant IS/BS/NBC Code, or as per Industry Standards? If yes, provide details: (a) Cement, concrete and coarse aggregate Yes (b) Steel and its alloys Yes (c) Electrical wire, fittings and accessories Yes (d) Plumbing and sanitary fittings Yes 2 Whether regular tests of materials and construction products Yes Structwell are being done from accredited labs also? If yes, details of such Designers & labs Consultants Pvt Ltd.:- Turbhe Navi Mumbai. 3 Whether manufacturer test certificate for cement, steel, pipes Yes etc. have been obtained and whether supply records are being maintained? 4 Whether suitable water is being used for construction? Yes What is the source of water? Has water been tested and approved by Engineer-in- Charge before construction? Has water been tested subsequently as per requirement? 3. Quality of Workmanship Sr. Parameters Yes No Remarks No. 1 Whether works of all the electrical wiring/ connections/ lift Yes installation / other electrical installations have been carried out under authorized /registered electrical engineer and whether records of the same has been maintained? 2. Whether all related works of plumbing & sanitary Yes including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized /registered plumbers / sanitary contractors and whether records of the same has been maintained? 3. Whether all the work is being carried out under supervision Yes of experienced and skilled professional? Further, whether the workmanship and quality is satisfactory and up to the mark and the work is within the acceptable and permissible limits of deviations as per relevant Code of Practice? 4. Whether remedial measures are undertaken to prevent NA at this Stage dampness and leakages ? If yes, provide details 5. Whether safety precautions are undertaken during Yes construction activities for all type of workers ? 4. Miscellaneous Sr. Parameters Yes No Remarks No. 1 Whether third party quality inspection is being carried out on Yes Inspection is site during/after completion of the works? done by the If yes, provide details. appointed Structural Site Engineer Mr. Fazal M.Momin 2 Whether anti-termite treatment has been undertaken for the Yes soil? 3 Whether fire-fighting arrangements has been undertaken Yes under supervision of fire consultant? 4 Whether proper signages have been installed on site/ Yes completed building as per requirement? 5 Whether precautions are undertaken to avoid air pollution Yes during construction? Please specify. 6 Whether records of all test reports / results have been properly Yes kept in the prescribed formats and whether the same are available at site for viewing by allottees and to be handed over to the association of allottees? 7 Whether all relevant records including sanctioned building plans, Yes utility drawings, various test reports / results have been properly kept in the prescribed formats to be handed over to the association of allottees? 8 Any innovative/ cost effective/ green technology has been NA at this Stage used for improving quality/energy efficiency? Please specify Yours Faithfully, CONCRETE CONCEPTS Fazal Digitally signed by Fazal Mushtaque Momin Mushtaque Date: 2025.07.31 Momin 16:07:24 +05'30' FAZAL M. MOMIN Licence No. M/388/SS-II Agreed and accepted by Digitally signed by SALEEM SALAM SHAIKH DN: c=IN, o=PERSONAL, title=8280, SALEEM 2.5.4.20=c0d02084297aeca9b6fca6c5a62cfa 91b9acae3bd9af186bf7ee4560ac792ac6, postalCode=400104, st=Maharashtra, SALAM SHAIKH serialNumber=7fc2ee6db7b00f128ee049eb e14fc0cdcc6bba07e827fc0c5e3886c39f0d67 69, cn=SALEEM SALAM SHAIKH Date: 2025.07.31 16:29:55 +05'30' Signature of Promoter Name: M/s. Pearl Infra Date: 31-07-2025