STRUCTURAL CONCEPT Designs Private Limited Dote: Septembet 30, 2024 Ref: 2023lSCDPL-1 467 1726 FORM-2 ENGINEER'S CERTIFICATE (As on 30.09.2024) To, M/S. TWO TAURUS REATTY TtP 414. Mohindro Chombers Premises Ltd. W.T. Potil Morg. Opp. Duke Fociory, Chembur. Mumboi - 40O 071. Subject : Certificote of Cost lncuned for Developmeni of "lNSlGNlA" hoving MohoRERA Registroiion Number Pst80OO544l5 being CTS no. 1505, Ploi no. 299A. sIh Rood, Neor Diomond Gorden, Chembur 400 071, under DCPR 2034, 33(ll) (SRA) Admeosuring 515.80 sq.mt. oreo being developed by developed by M/S. IWO- TAURUS REATTY LtP. Sir, l, Shri. Rojesh K. Lodhod of STRUCTURAT CONCEPT DESIGNS PW. LTD., hove undertoken ossignment of ceriifying Estimoted Cost for lhe Project "lNS|GN|A" hoving MohoRERA Registrotion Number PsI80005/t415 being CTS no. 1605, Plot no. 299A, sth Rood, Neor Diomond Gorden, Chembur 4O0 071, under DCPR 2034, 33(l l) (SRA) Admeosuring 515.80 sq.mt. oreo being developed by developed by M/S. TWO TAURUS REATTY tLP.. 1. We hove estimoted the cosi of the Civil, MEP ond ollied works required for compleiion of the oportmenls ond proporiionote completion of inlernol & externol works of the project os per specificolions mentioned in ogreementbf sole. Our estimoted cosi colculdiions ore bosed on the drowings/plons mode ovoiloble t6 us for the project under reference by ihe Developer/ Consultonts. The Schedule of items ond quontity required for the entire work os colculotbd by us, ihe ossumption of the cost of moteriol, lobour ond other inputs mode by Developer, ond the site inspection conied out by us to oscertoin / the obove onolysis given io us. Offrce :803, Maithili's Signet, Plot No 39/4, Sec 30A, Vashi, Navi Mumbai400 705. fel.: O22 21A10993, 022-27a71,994, 022-4963L304,022 49631712. Email :strconcept@gmail com Websrte: I We estimote Toiol Estimoied Cosi of complelion of the oforesoid project under reference ot Rs. 15,68,64,139.79l- (Rupees Fifleen Crore Slxty Elght tokh Slxly Four Thousond One Hundred Thldy Nlne & Polse Sevenly Nlne Only) (Totol of Toble A ond B) ot the time of Regislrotion. The estimoled Toiol Cost of project is wilh reference to the Civil, MEP ond Allied work required for completion of ihe oportments ond proportionote completion of internol & externol works, os per specificotions mentioned in ogreement of sole ond for ihe purpose of obioining Occupotion Certificole / Completion Certificote for the buildings/wings from MCGM being ihe Plonning Authority under whose jurisdiction the oforesoid proiect is being implemented. 2 The Estimoted Cosl lncuned till doie is colculoied ot Rs. 1,75.00.0fi)/. (Rupees One Crore Seventy Flve lokh Only) (Totol of Toble A ond B). The omount of Estimoted Cosi lncuned is colculoted on the bosis of input moteriols/services i used ond unii cost of ihese items. 4. The Bolonce cost of Completion of the Civil, MEP ond Allied work for completion of the oporiments ond proportionote'compleiion of internol & externol work os per specificotions menlioned in ogreement of sole, of the Project is esiimoted ot Rs. 13,93,64,139,79/- (Rupees Thlrleen Crore Nlnely Three lokh Slxty Four Thousond One Hundred Thiriy Nlne & Polse Sevenly Nlne 'Only) (Totol of Toble A ond B). 5. I certify thot the Cost of ihe Civil, MEP ond Allied work for ihe oportments ond proportionote internol & exiernol works, os per specificotions mentioned in ' ogreement of sole of the oforesoid Projeci os completed on lhe dote of this certificote is os given in Toble A ond B below : (t Buildino / Wino colled INSIGNIA Toble A Sr.No. Porticulors Amounts (in Rs.) I Toiol Esiimoted cosi of the building os on Rs. 12,66,08,674.22/- registrotion 2 Cost incurred os on 30.09.2024 of certificote Rs. 1.75,00,000/- 3 Work done in Percentoge (os Percentoge of the 13.82% estimoted cost) 4 Bolonce Cosi to be lncurred (Bosed on Estimoted Rs. 10,91 ,08,674.22/- Cost) 5 Cost lncuned on Additionol /Extro ltems not Rs.0/- (NlL) included in ihe Esiimoted Cost (Toble C) Toble B Sr.No. Porticulors Amounts (in Rs.) I Totol Eslimoted cost of the lnternol ond Externol Rs.3,02,55,465.57 /- Development Works including omenities ond I Fociliiies in the loyout os on registrotlon 2 Cost incuned os on 30.09.2024 of certificote Rs.0/- (NlL) 3 Work done in Percentoge (os Percentoge of the 0% estimoted cost) 4 Bolonce Cost to be lncurred (Bosed on Estimoied Rs.3,O2,55,465.57 /- Cost) 5 Cosi lncuned on Addiiionol /Extro not included in Rs. 0/- (NlL) the Eslimoted Cost (Toble C) Yours Foithfully, Fo] STRUCTURAT CONCEPT DESIGNS PW, tTD. /'u t\' \ RAJESH K. TADHAD Consutllng Structurol Englneer Slote Reg. No. STATE/R/2o2 4/ A?L/ 1 1 O89 i Agreed ond occepted by: Rohan Sunil Digitally signed by Rohan Sunil Abbott Abbott Date: 2024.10.21 17:57:40 +05'30' M/S. TWO TAURUS REATITY tLP Nole : 1. The scope of work is to complete Registered Reol Estote Project os per drowings opproved from time to lime ond os per specificotions menlioned in ogreement of sole. 2. Quontity survey con be done by office of Engineer or con be done by on independent Quonlity Surveyor, whose certificote of quontity colculoted con be relied upon by the engineer. ln cose of independent quontiiy surveyor being oppointed by Developer, the nome hos to be mentioned ot the ploce morked (*) ond in cose quontiiy ore being colculoted by office of Engineer, ihe nome of the person in the office of Engineer, who is responsible for the quontity colculoted should be mentioned ot the ploce morked (*). 3. Bolonce cosi to be incurred (4) moy vory from Difference between Totol estimoled cost ( I ) ond Actuol Cost incuryed (2) due io deviotion in quontity required/ escolotion of cost etc. As this is on estimoted cosi, ony deviotion in quontity required for developmenl of the Reol Estote Project will resull in omendment of the cost incuned/ to-be incuned. 4. AII components of work wiih specificotions ore indicotive ond not exhoustive. 5. Pleose specify if there ore ony devioiions/quolificotions. Exomple : Any deviotions in input moteriol used from specificoiions in ogreement of sole. TABTE - C List of Extro/Additionol/Deleted ltems considered in cost (which were noi pori of ihe originol Esiimote of Totol Cost) Sr. No. tlst of Exho/Addiiionol/Deleted llems Amount l. t NA NA 2. NA NA