STRUCTURAL CONCEPT Desig ns Private Limited Date: December 31, 2024 Ref: 2023/SCDPL-1467/726 FORM-2 ENGINEER'S CERTIFICATE (Ason 31.12.2024) To, M/S. TWO TAURUS REALTY LLP 414,Mahindra Chambers Premises Ltd. W.I. Patil Marg. Opp. Duke Factory, Chembur, Mumbai 400 071, Subject: Certificate of Cost Incured for Development of "INSIGNIA" having MahaRERA Registration Number P51800054415 being CTS no. 1605, Plot no. 299A, 5th Road, Near Diamond Garden, Chembur 400 071, under DCPR 2034, 33(11) (SRA) Admeasuring 515.80 sq.mt. area being developed by developed by M/S. TWO TAURUS REALTY LLP. Sir, 1, Shri. Rajesh K. Ladhad of STRUCTURAL CONCEPT DESIGNS PVT. LTD., have undertaken assignment of certifying Estimated Cost for the Project "INSIGNIA" having MahaRERA Registration Number P51800054415 being CTS no. 1605, Plot no. 299A, 5th Road, Near Diamond Garden, Chembur 400 071, under DCPR 2034, 33(11) (SRA) Admeasuring 515.80 sq.mt. area being developed by developed by M/S. TWO TAURUS REALTY LLP. 1, We hgve estimated the cost of the Civil, MEP arnd allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer/ Consuttants. The Schedule of items and quantity required for the entire work as calculdted by us, the assumption of the cost of materia, labour and other inputs made by Developer, and the site inspection carried out by US TO ascerain / coD the above analysis given to US. Vashi Navi Mumba Office :803, Maithili's Signet, Plot No. 39/4, Sec- 30A, Vashi, Navi Mumbai400 7O5. Tel.:022-27810993, 022-27811994, 022 49631304, 022-49631712. Email : strconcept @gmail.com Website: www.structuralconcept.in 2. We estimate Total Estimated Cost of completion of the aforesaid project under reference at Rs. 15,68,64,139.79/- (Rupees Flfteen Crore Slxty Elght Lakh Sixty Four Thousand One Hundred Thirty Nine &Palse Seventy Nine Only) (Total of Table A and B) (As per Basement + Ground + 1 Floor) at the time of Registration. The estimated Total Cost of project is with reference to the Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale and for the purpose of obtaining Occupation Certificate /Completion Certificate for the buildings/wings trom MCGM being the Planning Authority under whose jurisdiction the oforesaid project is being implemented. 3. TheEstimated CostIncured tildate is calculated at Rs. 3,50,00,000/- (Rupees Three Crore Flfity Lkh Only) (Total of Table Aand B). The amount of Estirnated Cost Incured is calculated on the basis of input materials/services Used and unit cost of these ifems. 4. The Balance cost of Completion of the Civil, MEP and Alied works for compietion of the apartments and proportionate completion of internal & external works as per specifications mentioned in ageement of sale, of the Project is estimated at Rs. 12,18,64,139.79/- (Rupees Twelve Crore Elghteen Lakh Sixty Four Thousand One Hundred Thirty Nine & Paise Seventy Nine Only) (Total of Table A and B). 5. Icertify that the Cost of the Civil, MEP and Allied work for the apartments and proportionate internal & external works, as per specifications mentioned in agreement of sale of the aforesaid Project as completed on the date of this certificate is as given in Table A and Bbelow : GONCS Vashi Navi GNSPA Mumba Building / Wing calledINSIGNIA Table A Sr.No. Particulars Amounts (in Rs.) Total Estimated cost of the building as on Rs. 12,66,08,674,22/ registration (As per Basement + Ground + 11 Floor) 2 Cost incuTed as on 31.12.2024 of certificate Rs. 3,50,00,000/ 3 Work done in Percentage (as Percentage of fhe 27.64% estimated cost) Balance Cost to be Incurred (Based on Estimated Rs. 9,16,08,674.22/ Cost) 5 Cost Incued on Additional /Extra items not Rs. 0/- (NIL) included in the Estimated Cost (Table C) Table B Sr.No. Particulars Amounts (in Rs.) Total Estimated cost of the Internal and External Rs.3,02,55,465.57/ Development Works including amenities and Facilities in the layout as on registraion (As per Basement +Ground + 11 Floor) 2 Cost incurred as on 31.12.2024 of certificate Rs. O/- (NIL) 3 Work done in Percentage (as Percentage of the 0% estimated cost) 4 Balance Cost to be Incurred (Basedon Estimated Rs. 3,02,55, 465.57/ Cost) 5 Cost Incurred on Additional /Extra not included in Rs. O/- (NIL) the Estimated Cost (Table C) Yours Faithfully, For STRUCTURAL CONCEPT DESIGNS PVT. LTD. GNCEA Vasti Navi RAJESH K. LADHAD Mumbat Consuting Structural Engineer State Reg. No. STATE/R/2024/APL/11089 For TWO TAURUS REALTY LLP Agreed and accepted by: M/S. TWO TAURUS REALITY LLP Note: 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. QUantity survey can be done by office of EngĂ­neer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the engineer. In case of independent quantity SUveyor being appointed by Developer, the name has to be mentioned at the place marked (") and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (). 3. Balance cost to be incurred (4) may vary from Difference between Total estimated cost (1) and Actual Cost incured (2) due to deviation in quantity requred/ escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project willresult in amendment of the cost incurred/ to-be incurred. 4. All Components of work with specifications are indicative and not exhaustive. 5. Please specify if there are any deviations/qualificatiorns. Example : Any deviations in input material used from specifications in agreement of sale. TABLE-C List of Extra/Additional/Deleted Items considered in cost (which were not part of the original Estimate of Total Cost) Sr. No. List of Extra/Additional/Deleted Items Amount NA NA 2. NA NA Vashi Navi Mumbat