ASPIRE ARCHITECTS & C ONSULTANTS Kumudini Building, Ground Floor, 7th Rajawadi Road, Rajawadi, Besides Neelkanth Valley, Ghatkopar East, Mumbai 400 077. Contact No.: 9326528368 / 9820841112 Email: aspirearch03@gmail.com Annexure A FORM 1 ARCHITECT'S CERTIFICATE Date: 04/09/2023 To, Two Taurus Reality LLP 414, Mahindra Chambers Premises Ltd. W.T. Patil Marg, Opp. Duke Factory, Chembur, Mumbai – 400 071. Sub: Certificate of Percentage of Completion of Construction Work of Proposed Redevelopment High rise building situated on the plot bearing C.T.S. No. 1605 plot No. 299-A, Shah baug of village Chembur, Tal. Kurla Chembur (M/W). Mumbai-400071, under DCPR 2034, 33(11) (SRA) Admeasuring 515.80 sq.mt. area being developed by Two Taurus Reality LLP Sir, We M/s. Aspire Architect & Consultants have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the Proposed Redevelopment High rise building situated on the plot bearing C.T.S. No. 1605 plot No. 299-A, Shah baug, of village Chembur, Tal. Kurla Chembur (M/W). Mumbai-400071, under DCPR 2034, 33(11) (SRA) admeasuring 515.80 sq. mts. area being developed by Two Taurus Reality LLP Following technical professionals are appointed by Owner / Promoter: - (i) M/s Aspire Architects & Consultants as Architect (ii) M/s. Structural Concept Designs Pvt Ltd as Structural Consultant (iii) M/s. ARP Consultants as MEP Consultant (iv) Mr. Shri Anup C. Gamre as Site Supervisor Based on Site Inspection, with respect to each of the building of the aforesaid Real Estate Project and the certificate issued by the Site Supervisor, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Page 1 of 3 ASPIRE ARCHITECTS & C ONSULTANTS Kumudini Building, Ground Floor, 7th Rajawadi Road, Rajawadi, Besides Neelkanth Valley, Ghatkopar East, Mumbai 400 077. Contact No.: 9326528368 / 9820841112 Email: aspirearch03@gmail.com Table A Percentage of Sr.No. Tasks /Activity work done 1 Excavation 0.00 % 2 Plinth 0.00 % 3 Ground / Stilt Floor (R.C.C.) 0.00 % 4 Super Structure (R.C.C.) Completed 0.00 % Internal walls, Internal Plaster, Floorings within Flats/Premises, 5 0.00 % Doors and Windows to each of the Flat/Premises Sanitary Fittings within the Flat/Premises, Electrical Fittings within 6 0.00 % the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor level connecting 7 0.00 % Staircases and Lifts, Overhead and Underground Water Tanks The external plumbing and external plaster, elevation, completion of 8 0.00 % terraces with waterproofing of the Building/Wing Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of 9 environment /CRZ NOC, Finishing to entrance lobby/s, plinth 0.00 % protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 10 Overall Percentage of Completion of the Work Done 0.00 % Page 2 of 3 ASPIRE ARCHITECTS & C ONSULTANTS Kumudini Building, Ground Floor, 7th Rajawadi Road, Rajawadi, Besides Neelkanth Valley, Ghatkopar East, Mumbai 400 077. Contact No.: 9326528368 / 9820841112 Email: aspirearch03@gmail.com TABLE-B Internal & External Development Works in Respect of the entire Registered Phase Sr. Common areas and Proposed Percentage of Details No Facilities, Amenities (Yes/No) Work done Internal Roads & 1. No Foothpaths 2. Water Supply Yes 0% Sewarage (chamber, 3. lines, Septic Tank, Yes 0% STP) 4. Storm Water Drains Yes 0% Landscaping & Tree 5. Yes 0% Planting 6. Street Lighting Yes 0% 7. Community Buildings No Treatment and disposal 8. of sewage and sullage Yes 0% water Solid Waste 9. management & Yes 0% Disposal Water conservation, 10. Rain water harvesting Yes 0% 11. Energy management Yes 0% Fire protection and fire 12. Yes 0% safety requirements Electrical meter room, 13. sub-station, receiving Yes 0% station Others (Option to Add 14. more) Total Percentage of work done for Internal & 0% External Development Thanking you, Yours Faithfully, For ASPIRE ARCHITECTS & CONSULTANTS, Agreed and Accepted by For Two Taurus Reality LLP SUYOG Digitally signed by SUYOG GANPAT PADWAL DN: c=IN, st=Maharashtra, 2.5.4.20=b489c40d21c86928e38352350d36f7daf8e845037 c8a3e5f091fdbdd3cfc7c26, postalCode=400703, SHRAVAN Digitally signed by SHRAVAN RAVINDER AGGARWAL DN: c=IN, o=PERSONAL, GANPAT street=NEAR JAIN MANDIR,JN-3/37/8PANCHARATNA 2.5.4.20=8d760bb33bbed2019b6d3cbe878c90d7b429b APT,SECTOR-9,NAVI MUMBAI, RAVINDER ea28fd32d5d3d9bd4a750e7943b, postalCode=400071, pseudonym=4aa2b933a5fa8df3f528ad60352ef9b0, serialNumber=a2bdc0a98c0fb0e0f7a5e2c55ea8d66ff0d69 st=MAHARASHTRA, PADWAL 7710da02baa480d8bed2cadae0d, o=Personal, cn=SUYOG serialNumber=70bc038e5b8698eaeeb52e60e6421d458 0dcc25b45a90a5cb24555a3dddd8b65, cn=SHRAVAN AGGARWAL GANPAT PADWAL Date: 2023.09.04 16:55:13 +05'30' RAVINDER AGGARWAL Date: 2023.11.10 12:42:38 +05'30' ARCHITECT Authorized Signature (Suyog G. Padwal) Name: Council of Architecture Date: 04.09.2023 Registration No. CA/2012/56332. Page 3 of 3