Date: 31/03/2026 ARCHITECT'S CERTIFICATE To, M/s. Shree Sai Realtors 201, Sai Plaza Jawahar Road, Opp. Ghatkopar Railway Station, Ghatkopar (East) Mumbai - 400 077. Subject: Certificate of Percentage of Completion of Construction Work of Sale Building of the Project “Sai Shankar”, situated on plot bearing F.P. No. 19 (CTS No. 5957) & F.P. No. 20 (CTS No. 5958) TPS-III Ghatkopar of village-Ghatkopar- Kirol, demarcated by its boundaries (latitude and longitude of the end points) 19 04 38.21N 72 54 14.04E, 19 04 39.27N 72 54 14.25E, 19 04 37.67N 72 54 15.64E, 19 04 38.48N 72 54 15.93E, 19 04 38.72N 72 54 15.96E, 19 04 37.07N 72 54 17.36E, 19 04 37.92N 72 54 17.69E village-Ghatkopar-Kirol, Ghatkopar (East), Mumbai - 400 077 admeasuring 3150.50 sq. mts. area being developed by M/s. Shree Sai Realtors Sir, I Shri. Rohit Dhiraj Patil have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the Sale Building of the Project “Sai Shankar”, situated on plot bearing F.P. No. 19 (CTS No. 5957) & F.P. No. 20 (CTS No. 5958) TPS-III Ghatkopar of village-Ghatkopar-Kirol, Tilak Road, Ghatkopar (East), Mumbai: 400077. admeasuring 3150.50 sq. mts. area being developed by M/s. Shree Sai Realtors 1. Following technical professionals are appointed by Owner / Promoter: (i) Shri. Rohit Dhiraj Patil as Licensed Surveyor of M/s. Architectural Concept. (ii) Shri. Hiren Shah as Structural Consultant. (iii) Mr. Vijay Puranik as Electric consultant. (iv) Mr. Kamlesh Patel as License Plumber. (v) Shri. Kishor Patil as Site Supervisor. Page 1 of 3 Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P51800054397 under Maha RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building having wing A, B & C Sr. Percentage No. Task / Activity of work done Wing A Wing B Wing C 1 Excavation 100% 100% 100% 2 Plinth 100% 100% 100% 3 04 number of Podiums 100% 100% 100% 4 02 number of Basement 100% 100% 100% 5 15 number of Slabs of Super Structure 40% 40% 40% 6 Internal walls, Internal Plaster, Floorings within 00% 00% 00% Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 00% 00% 00% Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 40% 40% 40% connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, 00% 00% 00% elevation, completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Electrical fittings to 00% 00% 00% Common Areas, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate Page 2 of 3 TABLE-B Common Areas (Internal & External Development Works) in Respect of the Registered Project Proposed Percentage of Details Sr. Common areas (Yes/No) Work done No. and Facilities, Amenities Wing Wing Wing Wing Wing Wing A B C A B C 1 Internal Roads & No No No NA NA NA Foothpaths 2 Water Supply YES YES YES 00% 00% 00% 3 Sewerage (chamber, lines) YES YES YES 00% 00% 00% 4 Storm Water Drains YES YES YES 00% 00% 00% 5 Landscaping & Tree YES YES YES 00% 00% 00% Planting 6 Street Lighting NO NO NO NA NA NA 7 Community Buildings NO NO NO NA NA NA 8 Treatment and disposal of YES YES YES 10% 10% 10% sewage and sullage water 9 Solid Waste management NO NO NO NA NA NA & Disposal 10 Water conservation, Rain YES YES YES 00% 00% 00% water harvesting 11 Energy management NO NO NO NA NA NA 12 Fire protection and fire Yes Yes Yes 00% 00% 00% safety requirements 13 Electrical meter room, YES YES YES 00% 00% 00% 14 Others (Parking Tower) YES YES YES 00% 00% 00% Yours Faithfully Digitally signed by ROHIT ROHIT DHIRAJ PATIL DHIRAJ PATIL Date: 2026.03.31 14:57:53 +05'30' Shri. Rohit Dhiraj Patil (License No. P/0840000456/LS) M/s. Architectural Concept 802, C-2 Wing, Skyline Wealth Space, Oasis Complex, Premier road, Vidyavihar (W), Mumbai 400 086. Page 3 of 3