Aniket Kumbhar BE Civil Consulting Civil Engineer Bld. No. 4/B, Flat NO. 9, Parijat CHSL, N.N.P., Plot No. 5, Goregaon (E), Mumbai. Ph-9892647357 FORM-2 ENGINEER’S CERTIFICATE Date :28-08-2024 To, M/s. Avvad Realcon LLP, Office No. 1 & 2, Building No. 130, Shubham Aura, Pantnagar, Ghatkopar ( E ), Mumbai – 400 075. Subject: Certificate of Cost Incurred for construction work of the proposed residential building Shubham Aurum (Redevelopment of existing building No. 175) 1 building of MHADA Layout Pantnagar on final Plot No. 320 (pt), of T.P. Scheme Ghatkopar III, plot bearing C.T.S. No – 5684 (Pt.) of village Ghatkopar – Kirol, Ghatkopar (E) Mumbai – 400 075 in ‘N’ Ward being developed by M/s Avvad Realcon LLP. Ref: MahaRERA Registration Number – P-51800054393. Sir, I Aniket Kumbhar have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being. SHUBHAM Aurum (Building No 175, Pantnagar, MHADA Layout) Redevelopment Project for Construction of 1 Building, situated on the Final Plot No. 320 (pt), of T.P.S. Ghatkopar III, bearing C.T.S. No. 5684 (Part) of Village Ghatkopar-Kirol, (East) Mumbai–400 075) being developed by M/s Avvad Realcon LLP. 1. Following technical professional are appointed by Owner/Promoter: - (i) Kvin Designer & Consultant as Architect (ii) Dilip P. Parekh as Structural Consultant (iii) Riddhi Consulting Engineer As MEP Consultant (iv) Prakash Patil as Quantity Surveyor (v) Reji Kunjukutty as Quality Assurance 2. We have estimated the cost of completion to obtain Occupation Certificate / Completion Certificate, of the Civil, MEP and Allied Works, of the Building of the Project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the schedule of items and quantity for the entire work as calculated by Shri Prakash Patil quantity surveyor appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate the Total Estimated Cost of completion of the building of the aforesaid project under reference as Rs. 25,94,75,000/- (Total of Table A & B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate/ completion certificate for the building from the BMC being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost incurred till date is calculated at Rs. 2,43,49,000/- (Total of Table A & B). The amount of Estimated Cost Incurred is calculated on the basis of amount of Total Estimated Cost.