Allied Associates Licence Surveyor Awed As0elet FORM 1 [see Regulation 3] ARCHITECT'S/ LICENSE SURVEYOR CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) 31 December 2024 To. Mr. Ahmed Ali Khan of M/s. True Lifespace A/101, Baitunnoor CHS Ltd. CST Road, Kurla (W) Mumbai - 400 070 Subject: - Certificate of Percentage of Completion of Construction Work of proposed development on plot bearing CTS No. 2616, 2617, 2618, 2619, 2635, 2636, 2637, 2638, 2639 & 2640 of village Kolekalyan, Nehru Road at Vakola, Santacruz (E) Mumbai 400 055 for Paradise Palace having MahaRERA Registration Number P51800054368 being developed by Mr. Ahmed Ali Khan of M/s. True Lifespace. Sir, We, M/s. Allied Associates have undertaken assignment as Licensed Surveyor of certifying Percentage of Completion of Construction Work of Paradise Palace having MahaRERA Registration number P51800054368, being developed by Mr. Ahmed Ali Khan of M/s. True Lifespace. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, we certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Wing A Tasks / Activity Percentage of Actual work Sr. done (Ason the date of No Certificate) Excavation 100 2 Basement (if Any) NA 3 Podiums (if Any) NA 4 Plinth 100 5 Stilt Floor 0 D/ 401,4h Floor, Baitunnoor CHS Ltd., CST Road, Kurla (W) Mumbai 400 070 Allied Associates Licence Surveyor ed Associat Y 6 Slabs of Super Structure 0 7 Internal walls, Internal Plaster, Floorings, Doors and Windows within Flat/ Premises 8 Sanitary Fittings within the 0 Flat/Premises 9 Staircases, Lifts Wells and Lobbies at 0 each Floor level, Overhead and Underground Water Tanks 10 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing, 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities TABLE-B Common areas (Internal &External Development Works) in Respect of the entire Registered Phase/Project number Common areas and Facilities Proposed Percentage Details Sr. No (Yes/ No) of Work done 1. Internal Roads & Foothpaths No 2 Water Supply Yes BMC pipeline & Water tanks D/ 401, 4" Floor, Baitunnoor CHS Ltd, CST Road, Kurla (W) Mumbai 400 070 Allied Associates Licence Surveyor 3 Sewarage (chamber, lines, Yes Chamber line will Septic Tank, STP) be constructed at appropriate stage 4 Storm Water Drains Yes 0 Will beconstructed at the time of OC 5 Landscaping &Tree Planting Yes 0 Will be planted at the time of OC 6 Street Lighting No 7 Community Buildings No 8 Treatment and disposal of No sewage and sullage water 9. Solid Waste management & No Disposal 10. Water conservation, Rain Yes Shall provide till water harvesting OC 11. Energy management No 12. Fire protection and fire Yes Willbe installed safety requirements before OC 13. Electrical meter room, sub Yes 0 Electric meter room station, receiving station proposed on gr. Flr. 14. Others (Option to Add more) Table A Wing B Tasks/Activity Percentage of Actual work Sr. done (As on the date of No Certificate) 1 Excavation 100 2 Basement (if Any) NA 3 Podiums (if Any) NA 4 Plinth 100 5 Stilt Floor 6 Slabs of Super Structure 7 Internal walls, Internal Plaster, Floorings, Doors and Windows within Flat/Premises D/401, 4" Floor, Baitunnoor CHS Ltd., CST Road, Kurla (W) Mumbai 400 070 Allied Associates Licence Surveyor ad Anel Sanitary Fittinygs within the Flat/Prenmises StaircasCs, Lifts Wells and Lobbiesat 0 cach Floor level, Overhead and Underground Water Tanks 10 The externalplumbing and external (0 plaster, elevation, completion of terraces with waterproofing of the Building/Wing, 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/ Wing, Compound Wall and all other requirements as may be required to complete project as per specifications inagreement of Sale. Any other activities TABLE-B Common areas (Internal &External Development Works) in Respect of the entire Registered Phase/Project number Sr. Common areas and Facilities No Proposed Percentage Details (Yes/ No) of Work done 1. Internal Roads &Foothpaths No 2. Water Supply Yes BMC pipeline & Water tanks 3. Sewarage (chamber, lines, Yes 0 Chamber line wilI Septic Tarnk, STP) be constructed at 4 appropriate stage Storm Water Drains Yes 0 Will be constructed at the time of OC D/ 401,4 Floor, Baitunnoor CHS Ltd., CST Road, Kurla (W) Mumbai 400 070 Allied Associates Licence Surveyor 5 Landscaping &Tree Planting Yes Willbe planted at the time of OC 6. Street Lighting No 7. Community Buildings No 8 Treatment and disposal of No sewage and sullage water 9. Solid Waste management &t No Disposal 10. Water conservation, Rain Yes 0 Shall provide till water harvesting OC 11. Energy management No 12. Fire protection and fire Yes Will be installed safety requirements before OC 13. Electrical meter room,sub Yes Electric meter room station, receiving station proposed on gr. Flr. 14. Others (Option to Add more) Yours Faithfully for, M/s. Allied Associates S/691/LS Agreed and Accepted by: For TRUE LIFESPACE Partner M/s. True Lifespace Name: Date : 3(-12-2024