Allied Associates N Licence Surveyor FORM 1 Isce Regulation 3| ARCHITECTS/ LICENSE SURVEYORCERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) 30 September 2024 To. Mr. Ahmed Ali Khan of M/s. True Lifespace A/101, Baitunnoor CHS Ltd. CST Road, Kurla (W) Mumbai - 400 070 Subject: - Certificate of Percentage of Completion of Construction Work of proposed development on plot bearing CTS No. 2616, 2617, 2618, 2619, 2635, 2636, 2637, 2638, 2639 & 2640 of village Kolekalyan, Nehru Road at Vakola, Santacruz (E) Mumbai 400 055 for Paradise Palace having MahaRERA Registration Number P51800054368 being developed by Mr. Ahmed Ali Khan of M/s. True Lifespace. Sir, We, M/s. Allied Associates have undertaken assignment as Licensed Surveyor of certifying Percentage of Completion of Construction Work of Paradise Palace having MahaRERA Registration number P51800054368, being developed by Mr. Ahmed AliKhan of M/s. True Lifespace. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, we certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Wing A Tasks / Activity Percentage of Actual work Sr. done (As on the date of No Certificate) 1 Excavation 80 D/ 401,4 Floor, Baitunnoor CHS Ltd., CST Road, Kurla (W) Mumbai400 070 Allied Associates Licence Surveyor Basement (if Any) NA Podiums (if Any) NA 4 Plinth 65 Stilt Floor 6 Slabs of Super Structure 7 Internal walls, Internal Plaster, 0 Floorings, Doors and Windows within Flat/ Prenmises Sanitary Fittings within the Flat/ Premises 9 Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and Underground Water Tanks 10 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing, 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/ Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreenment of Sale. Any other activities TABLE-B Common areas (Internal & External Development Works) in Respect of the entire Registered Phase/Project number Sr. Common areas and Facilities No Proposed Percentage Details (Yes/ No) of Work done Allied Associates Licence Surveyor 1. Internal Roads &Foothpaths No 2. Water Supply Yes BMC pipeline & Water tanks 3. Sewarage (chamber, lines, Yes Chamber line will Septic Tank, STP) be constructed at appropriate stage 4 Storm Water Drains Yes Willbe constructed 5. at the time of OC Landscaping &Tree Planting Yes 0 Will be planted at the time of OC 6 Street Lighting No 7 Community Buildings No 8 Treatment and disposal of No sewage and sullage water 9 Solid Waste management & No 10. Disposal Water conservation, Rain Yes 0 water harvesting Shall provide till OC 11. Energy management No 12. Fire protection and fire Yes 0 Willbe installed safety requirements before OC 13. Electrical meter room, sub Yes 0 Electric meter room station, receiving station proposed on gr. Flr. 14. Others (Option to Add more) Table A Wing B Tasks / Activity Percentage of Actual work Sr. No done (As on the date of Excavation Certificate) 2 95 Basement (if Any) NA 3 Podiums (if Any) NA 4 Plinth 5 Stilt Floor 85 0 Allied Associates Licence Surveyor 6 0 Slabs of Super Structure 7 Internal walls, Internal Plaster, 0 Floorings, Doors and Windows within Flat/ Premises 8 Sanitary Fittings within the Flat/ Prenmises Staircases, Lifts Wells and Lobbies at 0 each Floor level, Overhead and Underground Water Tanks 10 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing, 11 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing toentrance lobby/s,plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities TABLE-B Common areas (Internal &External Development Works) in Respect of the entire Registered Phase/Project number Common areas and Facilities Proposed Details Sr. Percentage No (Yes/ No) of Work done 1. Internal Roads & Foothpaths No 2. Water Supply Yes BMC pipeline & Water tanks Allied Associates Licence Surveyor 5 Landscaping &Tree Planting Yes 0 Willbe planted at the time of OC 6. Street Lighting No 7. Community Buildings No 8 Treatment and disposal of No sewage and sullage water 9. Solid Waste management &t No Disposal 10. Water conservation, Rain Yes Shall provide till water harvesting OC 11. Energy management No 12. Fire protection and fire Yes Will be installed safety requirements before OC 13. Electrical meter room, sub Yes 0 Electric meter room station, receiving station proposed on gr. Flr. 14. Others (Option to Add more) Yours Faithfully for, M/s. Allied Associates S/691/LS Agreed and Accepted by: For TRUE LIFESPAƇE. Partner M/s. True Lifespace Name: Date: Bo-09-024 D/ 401, 4 Floor, Baitunnoor CHS Ltd., CST Road, Kurla (W) Mumbai 400 070