Ground Floor Plan, Typical Floor Plan Stamp & Date of Approval of Plans 01 of 03 Approved subject to the conditions mentioned in this office Ground Floor (Wing 'B') 22.9 letter no. P-10543/2022/ (2616 And Other)/H/E Ward/Kolekalyan-H/E T1 5.7 2 13.55 8 1.25 7 2.25 11.4 Wing 'A' Wing 'B' BUA of Wing 'A' & 'B' North 1 T2 3 Staircase Total Staircase Total Staircase Total Electric Passage Lift & BUA for Electric Lift & BUA for Electric Passage Lift & BUA for 3.25 5.25 Floor Resi Comm Balcony Toilet Floor Resi Comm Balcony Toilet Passage Wing Resi Comm Balcony Toilet 4.15 E Duct Lift FSI Duct Lift FSI Duct Lift FSI 6 4.45 5 & Deck & Deck & Deck 1.1 lobby Purpose lobby Purpose lobby Purpose S1 4 4.2 L4 0.6x2.2 F1 (1) (2) (3) (4) (5) (6) (7) (8) (1) (2) (3) (4) (5) (6) (7) (8) (1) (2) (3) (4) (5) (6) (7) (8) S.E.(B.P.)-K/E - C A.E.(B.P.)-H/E E.E.(B.P.)-H/E L1 L3 3.35 Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. 4.263 3.828 4.485 S2 P3 L2 P4 M1 G 93.36 84.19 - - 0.74 10.78 44.57 233.64 G 144.34 - - 25.31 0.99 27.22 37.90 235.76 A 548.86 84.19 47.38 - 2.16 26.82 115.67 825.08 P1 7.25 5.3 1 227.75 - 23.69 - 0.71 8.02 35.55 295.72 1 221.12 - 30.47 - 0.99 17.34 37.94 307.86 B 365.46 - 30.47 25.31 1.98 44.56 75.84 543.62 P5 9 4.18 22 24 2.35 23 P6 2 227.75 - 23.69 - 0.71 8.02 35.55 295.72 2 - - - - - - - - Total 914.32 84.19 77.85 25.31 4.14 71.38 191.51 1368.70 3.01 3.7 P2 21 5.31 Bldg. line 2.15 3 - - - - - - - 3 - - - - - - - above T1 2.65 1.65 - - 3.54 4.04 10 4 - - - - - - - - 4 - - - - - - - - 4.56 12.35 25 Bldg. line 1.5 1.95 5 - - - - - - - 5 Bldg. line above 2.64 1.0 - - - - - - - - - above 1.35 11 6 - - - - - - - - 6 3.3 5.9 3.15 3.62 2.75 - - - - - - - - 20 19 3.05 2.9 0.4 2.3 2.9 7 - - - - - - - - 7 - - - - - - - 3.21 18 16 15 13 - 2.85 2.6 17 14 12 Total 548.86 84.19 47.38 - 2.16 26.82 115.67 825.08 3.15 1.1 Total 365.46 - 30.47 25.31 1.98 44.56 75.84 543.62 4.35 3.4 Shop 1 3.0 3.8 Ground Floor (Wing 'B') 3.0 3.15x2.85 Shop 4 3.0x2.15 Wing B 2.86 2.3 Ground Floor 6 0.85x11.05 S2 3.475x1.65A 23.75 x 18.65 = 442.94 Meter Room Shop 2 Shop 3 2.6x6.3 CH 7 1.4x0.3 M1 3.35 x 1.50 = 5.03 Wing 'A' Wing 'B' Fungible BUA of Wing 'A'& 'B' 2.85x6.3 P2 0.438x1.4 Deductions 3.92 0.4 0.85 3.62 14 2.3x0.1 1 1.25 x 2.90 = 3.63 15 2.9x0.7 P4 1.495x1.5 Passage Form I RW Pipe 2 13.55 x 1.65 = 22.36 P5 0.745x0.15 P1 4.263 x 3.05 = 13.00 Floor Resi Comm Balcony Toilet Terrace Passage Total Floor Resi Comm Balcony Toilet Terrace Passage Total Wing Resi Comm Balcony Toilet Terrace Passage Total 2.75x3.05 21 1.25x1.4 3 11.40 x 2.45 = 27.93 & Deck & Deck I Area Statement Sq.mtr. 2.15x3.05 S P2 0.438 x 1.40 = 0.61 & Deck 3.05 3.05 4 4.15 x 3.75 = 15.56 1 Area of the plot 1406.70 S CP L3 0.905x1.65 P3 3.828 x 1.80 = 6.89 5 5.25 x 1.70 = 8.93 (1) (2) (3) (4) (5) (6) (7) (1) (2) (3) (4) (5) (6) (7) (1) (2) (3) (4) (5) (6) (7) (a) Area of Reservation in plot - CP 2 P4 1.495 x 1.50 = 2.24 4 6 0.85 x 11.05 = 9.39 Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. (b) Area of Road Setback 10.45 P5 0.745 x 0.15 = 0.11 Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. Sq.mtr. 7 1.40 x 0.30 = 0.42 (c) Area of DP Road - 3.11 ED 2.05x0.75 4.1 P6 1.65 x 2.65 = 4.37 G G A - - - - - - - 3.89 1.2 CH 8 2.25 x 0.90 = 2.03 - - - - - - - - - - - - - - 2 Deductions for 0.35 Total = 27.22 RW Pipe Wing A 9 1.10 x 8.25 = 9.08 1 - - - - - - - 1 18.99 - - - - - 18.99 B 18.99 - - - - - 18.99 A For Reservation/ Road Area - 2.0 10 1.95 x 1.30 = 2.54 1.85x2.9 3.15x1.1 Ground Floor (a) Road setback area to be handed over (100%) (Regulation No. 16) 10.45 2.9 Lift 11 2.90 x 2.90 = 8.41 Electric Duct 2 - - - - - - - 2 - - - - - - - Total 18.99 - - - - - 18.99 Bldg. line A 12.35 x 26.25 = 324.19 Meter Room (b) Proposed D P road to be handed over (100%) (Regulation No. 16) - above 1.42x1.99 12 3.40 x 1.25 = 4.25 E 0.45 x 2.2 = 0.99 3 Deductions M1 2.25 x 2.15 = 4.84 3 - - - - - - - - - - - - - - (c) (i) Reservation area to be handed over (100%) (Regulation No. 17) - 13 2.90 x 1.85 = 5.37 4 - - - - - - - 4 (ii) Reservation area to be handed over as per AR (Regulation No. 17) - 2.67 1 3.30 x 0.40 = 1.32 M2 0.55 x 0.15 = 0.08 Society Office - - - - - - - Sq.mtr. 2.0 14 2.30 x 0.10 = 0.23 (d) Encroachment 27.55 3.8 3.65 Ent. Lobby S 2 3.15 x 1.10 = 3.47 Total = 4.92 T1 2.35 x 3.65 = 8.58 5 - - - - - - - 5 - - - - - - - 0.85 15 2.90 x 0.70 = 2.03 1 BUA proposed : 1368.70 2.8 CP 3 0.85 x 3.05 = 2.59 T2 1.35 x 1.25 = 1.69 (e) Total 38.00 3.51 Passage 16 2.75 x 1.95 = 5.36 6 - - - - - - - 6 - - - - - - - 2 Fungible BUA permissible : 479.04 1 4 2.05 x 7.25 = 14.86 Total = 10.27 B For Amenity area 4.5 17 2.30 x 1.35 = 3.11 3 Fungible BUA proposed for : Encroachment 1.5 Wing 'A' P1 2.3 x 0.145 = 0.33 7 - - - - - - - 7 - - - - - - - Area of amenity plot/plots to be handed over as per DCPR 14(A) - 7 1.50 x 3.80 = 5.70 18 3.05 x 2.45 = 7.47 Kitchen Up 1.5 P2 0.5 x 0.545 = 0.27 Fire pump room Total - - - - - - a Commercial BUA with charging premium : - Area of amenity plot/plots to be handed over as per DCPR 14(B) - 8 2.55 x 1.10 = 2.81 19 1.35 x 2.70 = 3.65 - Total 18.99 - - - - - 18.99 3.0x2.0 P3 1.5 x 0.757 = 1.14 F1 4.450 x 2.65 = 11.79 b Residential BUA with charging premium : 18.99 C Deductions for existing BUA to be retained if any/ Land component of existing - 2.25 0.1 9 1.65 x 2.30 = 3.80 20 1.00 x 3.95 = 3.95 S 3.1 3.25 P4 1.5 x 5.62 = 8.43 c Total : 18.99 BUA/ existing BUA as per Regulation under which the development was allowed Bldg. line 10 2.50 x 2.90 = 7.25 21 1.25 x 1.40 = 1.75 CP RW Pipe above P5 0.24 x 1.855 = 0.45 22 2.15 x 2.30 = 4.95 Staircase, Lift & Lift Lobby 4 Fungible BUA Porposed in % : 3.96 3 Total deductions: [{2(A) +2(B)}+2(C)] 38.00 1.5 11 3.65 x 2.45 = 8.94 3 CH 6 0.21 x 0.795 = 0.17 23 5.30 x 3.55 = 18.82 S1 3.25 x 3.90 = 12.68 4 Balance area of plot (1 - 3) 1368.70 0.55 12 2.00 x 5.20 = 10.40 Living Total = 10.78 24 2.65 x 2.65 = 7.02 S2 3.475 x 1.65 = 5.73 5 Plot area under Development after areas to be handed over to MCGM/ 3.0x3.0 3.92 13 1.60 x 11.70 = 18.72 1368.70 25 1.50 x 1.25 = 1.88 L1 4.20 x 2.05 = 8.61 Appropriate Authority as per Sr. No. 4 above Bldg. line 14 2.80 x 0.85 = 2.38 L2 4.485 x 1.80 = 8.07 above Electric Electric duct Total = 180.09 6 Zonal (basic) FSI 1.00 Lift Meter Rm. 15 0.75 x 2.90 = 2.18 L3 0.905 x 1.65 = 1.49 3 1.82x1.99 E 1.65 x 0.45 = 0.74 7 BUA as per Zonal (basic) FSI (5 x 6) 1368.70 2.1x2.15 16 0.40 x 3.05 = 1.22 Toilet L4 0.60 x 2.20 = 1.32 A Nos. of flats up to 45 Sq.mt. : 23 8 BUA equal to area of land handed over as per Regulation 30(A) 2.78 FRD 3.8 Total = 85.63 T1 5.70 x 1.20 = 6.84 Total = 37.90 Floor upto 45 45 to 60 60 to 90 (i) As per 2(A) and 2(B) except 2(A)(c) - Staircase, Lift & Lift Lobby Wing 'A' Wing 'B' Summary Parking requirement (23 / 4) : 5.75 Toilet 0.9x1.1 T2 4.45 x 4.15 = 18.47 Total Deduction = 298.60 (Nos.) (Nos.) (Nos.) - 2.0x1.1 S1 3.90 x 3.40 = 13.26 B Nos. of flats between 45 to 60 Sq.mt. : - (ii) above with in cap of "Admissible TDR" as per column 6 of Table 12 10.85 WC RW Pipe Total = 25.31 Net BUA Resi. = 144.34 Floor Resi Comm Floor Resi Comm Wing Resi Comm G 07 - - on remaining /balance plot.) 2.8x1.2 1.2x1.2 S2 1.50 x 5.867 = 8.80 Parking requirement - : - CH Residential (Nos.) (Nos.) (Nos.) (Nos.) (Nos.) (Nos.) 1 (iii) in case of 2(A)(c)(ii) permissible over and above permissible BUA - Toilet 0.9x1.25 S3 2.20 x 2.15 = 4.73 11 - - C Total (A + B) : 5.75 2.0x1.1 3.63 R1 3.30 x 10.85 = 35.81 G 03 04 G 04 - A 13 04 on remaining / balance plot Bath 1.05 L1 1.50 x 2.45 = 3.68 2 05 - - D Visitor's Parking 10% of 'C' above : 0.57 1.1 R2 2.90 x 5.20 = 15.08 1 05 - 1 06 - B 10 - 9 BUA in lieu of Cost of construction of built up amenity to be handed over - 2.0x1.1 L2 2.21 x 2.755 = 6.09 3 - - - E Total (C + D) : 6.32 0.9 2.72 R3 1.50 x 4.35 = 6.53 Carpet Area Statement 2 05 - 2 - - Total 23 04 (within the limit of permissible BUA on remaining plot) 3.72 L3 2.06 x 0.305 = 0.63 4 - - - R4 2.30 x 5.35 = 12.31 - - - - 10 BUA due to "Additional FSI on payment of Premium" as per Table No. 12 - 5 3.69 x 2.00 = 7.38 Wing A 3 3 - - - Bed Bldg. line R5 1.15 x 2.90 = 3.34 5 A One parking space for every 40 Sq.mtr : 2.10 of Regulation No 30(A) on remaining/ balance plot. (0 x 0.5) 3.0x2.75 above Total = 44.57 Ground Floor 4 - - 4 - - - - - Kitchen 2.3 R6 4.30 x 2.30 = 9.89 6 of floor area up to 800 Sq.mtr. (84.19 /40) 11 BUA due to admissible "TDR" as per Table No. 12 of Regulation No. 30 (A) - 2.9x2.0 RW Pipe Total Deduction = 240.00 Shop 1 3.15 x 2.85 = 8.98 5 - - 5 - - - - - R7 3.40 x 1.10 = 3.74 7 B Visitor's Parking 10% of (ii) above : 0.20 Say 02 and 32 on remaining / balance plot. Permissible Net Comm BUA = 84.19 2.75 x 3.05 = 8.39 6 - - 6 - - R8 4.45 x 1.50 = 6.68 Total 23 - - or minimum of 02 parking space FSI credit by Reservation TDR 3.61 2.58 1.85 x 2.90 = 5.37 0.85 Total = 93.36 7 - - 7 - - C Total (ii + iii) : 4.10 (iv) FSI credit by Slum TDR 0.4 1 3.75 Total = 22.73 Total 13 04 Total 10 - Total Parking required (i + vi) : 10.42 12 Additional BUA for road setback over and above permissible BUA - Living Living 3.15x2.75 Say : 10 Nos. as per Table No. 12 of Reg. 30 (A) within 25% of permissible BUA 2 2.9 Shop 2 2.85 x 6.3 = 17.96 2.6x2.9 East 13 Permissible BUA (7 + 10 + 11 + 12) 1368.70 UGWT Parking Proposed : 10 Nos. West Shop 3 2.6 x 6.3 = 16.38 14 Proposed BUA 1368.70 1.65x1.9 2.05 x 0.75 = 1.54 15 TDR generated if any as per regulation 30(A) and 32 - 3.35 5.2 4.29 Total = 17.92 16 Fungible Compensatory Area as per Regulation No. 31(3) Bath 1.15 over flor to int. swd (a) i) Permissible Fungible compensatory area for rehab component without charing premium - 2.0x1.1 Kitchen Shop 4 3.00 x 2.15 = 6.45 ii) Fungible compensatory area availed for rehab component without charging premium - Bldg. line 3.0x2.0 2.45 filter chamber above Encroachment 2.15 x 3.05 = 6.56 AA class (b) i) Permi. Fungible Compensatory residential area availed by charging premium 479.04 WC 1.15x1.1 RCC slab ii) Fungible Compensatory residential area availed on payment of premium 18.99 4.19 0.95 x 0.90 = 0.86 3.15 x 1.10 = 3.47 (c) i) Permi. Fungible Compensatory commercial area availed by charging premium - 3.41 RW Pipe CH Gl. ii) Fungible Compensatory commercial area availed on payment of premium - 6.7 Total = 17.33 17 Total BUA proposed including Fungible Compensatory Area 1387.69 Flat No 1 UGT [13+15(a)(ii) +15(b)(ii)+15(c)(ii)] Submersible pump 2.4 Well to be covered Living 3.15 x 2.75 = 8.66 17 FSI consumed on Net Plot (13/ 4) 1.00 4.0 Stilt 4.15 II Other Requirements 4.71 Kitchen 2.90 x 2.00 = 5.80 3.86 3.61 Gl A Reservation/Designation UGWT 5.71 Bath 2.00 x 1.10 = 2.20 2.86 a) Name of Reservation - 3.68 WC 1.20 x 1.20 = 1.44 2.69 Bldg. line CH CH Bldg. line b) Area of Reservation affecting the plot - 5.7 above Passage 3.55 x 1.00 = 3.55 3.68 above c) Area of Reservation land to be handed/handed over as per Regulation No. 17 - 2.15 1.4 2.25 Passage 2.80 x 1.20 = 3.36 WC 2.15 RW Pipe 0.4 3.17 Total = 25.01 d) Built up area of Amenity to be handed over as per Regulation No.17 - Ladies Toilet 1.1x0.9 1.2 RW Pipe e) Area/Built up Area of Designation - 1.35 4.22 Bldg. line Bath Flat No 2 B Plot area/Built up Amenity to be Handed Over as per Regulation No WC WC 1.25 Living 2.60 x 2.90 = 7.54 above 1.1x2.0 Concrete i) 14 (A) - 1.2x0.95 1.2x0.9 Up 2.9 Room 1.65 x 1.90 = 3.14 Coping ii) 14 (B) - WC WC 2.1x2.4 Kitchen 3.00 x 2.00 = 6.00 iii) 15 - 1.2x0.9 1.2x0.9 2.9 Tower Parking 4.05 Bath 2.00 x 1.10 = 2.20 6 Nos. 1.25x0.9 2.4 C Requirement of Recreational Open Space in Layout/Plot as per Reg. No. 27 - Kitchen WC 1.15 x 1.10 = 1.27 WC Wing 'B' 0.23 m thick D Tenement Statement 3.15 B 4.15 2.0x3.0 2.58 Passage 1.10 x 2.15 = 2.37 1.2x0.9 Gents Toilet 1.0 1.0 brick wall i) Proposed built up area (17 above) 1387.69 8.0 2.25x1.35 WC Gl. Passage 0.90 x 1.10 = 0.99 3.1 0.95x1.2 ii) Less deduction of non-residential area 84.19 Total = 23.50 1.5 3.63 Rubble iii) Area available for tenements [i - ii] 1303.5 3.18 1.1 Compacted Earth Bldg. line 1.5 0.1 5.25 iv) Tenements permissible (450/10000) [1303.50 x (450/10000)] = 58.65 Say 59 above Flat No 3 v) Total number of Tenements proposed on the plot 23 Living Paved RG Living 3.00 x 3.00 = 9.00 Fire Pump Room 4.4x2.9 E Parking Statement 102.46 Sq.mtr. Kitchen 3.00 x 2.00 = 6.00 Parking required by Regulations for 4.15x2.5 2.25 2.05 Lift Lift ED Bed 3.00 x 2.75 = 8.25 2.08x1.82 2.03x1.82 i) Car, Scooter/Motor cycle, Outsiders (visitors) 10 3.39 0.90 x 1.25 = 1.13 4.15 1 ii) Covered garage permissible - 4.43 Toilet 2.00 x 1.10 = 2.20 3.37 iii) Covered garages proposed - 0.85 4.45 Up Toilet 2.00 x 1.10 = 2.20 3.64 Elec. Meter Rm. Car, Scooter/Motor cycle, Outsiders (visitors) - 1.5m wide passage Passage 0.90 x 1.10 = 0.99 3.3 3.05x1.5 iv) Total parking provided 10 FRD 8.25 Total = 29.77 F Transport Vehicles Parking Bldg. line 2.45 11.35 Bldg. line Wing B (i) Spaces for transport vehicles parking required by Regulations - Passage above 1.4 above Ground Floor (ii) Total No. of transport vehicles parking spaces provided - 1.4 Flat No 1 2.65 Living Living 4.40 x 2.90 = 12.76 CERTIFICATE OF AREA 2.99 4 0.9 Inner Chowk 3.8x3.4 2.15 2 Kitchen 2.00 x 3.00 = 6.00 Certified that surveyed of the plot under reference was carried out on 04/09/2020 and Toilet 2.65 Room 2.10 x 2.40 = 5.04 that the dimension of the sides etc of the plot stated on the plan are measured on site Society 1.1x2.0 Toilet 1.25 Bath 1.10 x 2.00 = 2.20 and the area so workout is 1406.70 Sq.mtr. 3.65 Office 2.0x1.1 1.65 2.15 0.9 3 WC 0.95 x 1.20 = 1.14 2.2x3.35 Toilet 3.11 Living 0.85 Passage 2.25 x 1.35 = 3.04 Toilet 1.1x2.0 Bath 3.7 2.9x4.85 2.0x0.9 1.25 Living 1.3 Passage 1.25 x 0.90 = 1.12 2.0x1.1 1.95x1.15 Site u/r 1.5 2.9x4.2 4.22 Total = 31.30 3.27 Bed 0.95 Bldg. line WC 2.75x3.2 2.0x0.9 4.21 Flat No 2 above 1.25 1.2x1.1 Living 3.80 x 3.40 = 12.92 WS 09 M/s. Allied Associates Kitchen Kitchen 2.0x2.8 Bed 2.0x2.75 2.9 Bldg. line Kitchen 2.00 x 2.75 = 5.50 2.75x3.2 above Bath 1.95 x 1.15 = 2.24 Content of Sheet 1.0 1.35 1.1 Kitchen WC 1.50 x 1.10 = 1.65 0.6 Ground Floor Plan, Block Plan, Location Plan, 2.0x2.8 0.90 x 1.45 = 1.17 3.33 3.61 1.25 0.5 3.2 BUA & Fungible Area Statement, Tenement Statement, Parking Area Statement 3.05 2.3 2.75 1.75 1.85 WC 4.14 Total = 23.62 3.83 0.6 1.5x1.1 1.25 Name & Signature of Developer Name & Signature of Lic. Surveyor Bldg. line 3.97 above 2.9 2.3 2.9 1.8 4.46 Flat No 3 3.67 4.33 Living 2.90 x 4.20 = 12.18 2.69 Kitchen 2.00 x 2.80 = 5.60 EOS 1.4 3.37 4.49 Space for Bed 2.75 x 3.20 = 8.80 H/E Elec. Substation Toilet 2.00 x 1.10 = 2.20 LOS 4.52 Bldg. line 4.85 Toilet 1.10 x 2.00 = 2.20 216.02 Sq.mtr. above 5.1 5.22 3.54 2.00 x 0.90 = 1.80 M/s. True life Space 3.86 M/s. Allied Associates Total = 32.78 Description of Proposal 1.5 Flat No 4 EE 1.2 Proposed low rise building on plot bearing CTS No. 2616, 2617, 2618, 2619, 2635, 2636, 2637, 1.5 Living 2.90 x 4.85 = 14.07 2638, 2639 & 2640 of village Kolekalyan, Nehru Road at Vakola, Santacruz (E) Mum - 55 Kitchen 2.00 x 2.80 = 5.60 Bed 2.75 x 3.20 = 8.80 Toilet 2.00 x 1.10 = 2.20 South Toilet 1.10 x 2.00 = 2.20 N D/401, 4th Floor, Baitunnoor CHS Ltd, Passage 2.00 x 0.90 = 1.80 N Scale : - 1:4000 CST Road, Kurla (W) Mumbai 400 070. Total = 34.67 Dwg. No. Drawn By Checked By Scale Date 001 Shaikh Shaikh 1:100 22.06.2023 Wing A First & Second Floor A 13.60 x 31.65 = 430.44 Deductions 1 1.25 x 1.00 = 1.25 2 1.25 x 1.25 = 1.56 3 0.85 x 2.90 = 2.47 4 4.40 x 1.25 = 5.50 5 0.85 x 3.05 = 2.59 6 5.65 x 0.85 = 4.80 7 1.85 x 10.85 = 20.07 8 4.50 x 0.25 = 1.12 9 1.00 x 2.35 = 2.35 10 2.50 x 2.90 = 7.25 11 2.25 x 2.30 = 5.18 12 0.20 x 0.15 = 0.03 13 6.40 x 4.15 = 26.56 14 1.25 x 1.25 = 1.56 15 3.65 x 6.60 = 24.09 16 1.75 x 2.90 = 5.08 17 0.65 x 2.30 = 1.50 18 2.55 x 1.10 = 2.81 19 0.40 x 3.80 = 1.52 20 2.05 x 7.25 = 14.86 21 0.85 x 3.05 = 2.59 Total = 134.72 Electric Duct E 1.57 x 0.45 = 0.71 Wing B Electric Duct First Floor E 0.45 x 2.20 = 0.99 A 26.40 x 23.70 = 625.68 Deductions Balcony & Deck 1 3.35 x 4.15 = 13.90 B1 2.15 x 1.00 = 2.15 2 1.40 x 2.30 = 3.22 B2 1.00 x 2.30 x 4 = 9.20 3 2.40 x 2.90 = 6.96 B3 0.80 x 3.05 = 2.44 4 1.40 x 2.30 = 3.22 B4 0.60 x 3.05 = 1.83 5 2.40 x 1.10 = 2.64 B5 3.05 x 0.75 = 2.29 6 0.40 x 3.05 = 1.22 B6 2.75 x 0.75 = 2.06 7 1.75 x 1.25 = 2.19 B7 2.90 x 0.75 x 3 = 6.53 8 3.90 x 3.60 = 14.04 B8 0.50 x 3.20 = 1.60 9 3.05 x 2.60 = 7.93 B9 1.10 x 2.15 = 2.37 10 4.15 x 2.05 = 8.51 Total = 30.47 11 1.25 x 1.40 = 1.75 12 2.15 x 2.30 = 4.95 Passage 13 9.40 x 5.65 = 53.11 P1 0.963 x 1.65 = 1.59 14 2.00 x 3.95 = 7.90 P2 1.40 x 1.40 = 1.96 15 5.30 x 1.90 = 10.07 P3 3.827 x 1.80 = 6.89 16 1.50 x 1.25 = 1.88 P4 1.395 x 1.65 = 2.30 17 7.95 x 1.65 = 13.12 P5 2.30 x 0.35 = 0.81 18 2.65 x 1.00 = 2.65 P6 1.65 x 2.30 = 3.80 19 2.30 x 1.25 = 2.88 Total = 17.34 20 2.75 x 2.10 = 5.78 21 2.90 x 0.85 = 2.47 Staircase, Lift & Lift Lobby 22 2.90 x 2.00 = 5.80 S1 3.25 x 3.75 = 12.19 Dn Up S2 0.187 x 1.65 = 0.31 23 2.30 x 0.90 = 2.07 24 4.00 x 2.15 = 8.60 S3 3.287 x 1.80 = 5.92 Dn 25 3.05 x 4.20 = 12.81 L1 4.20 x 2.05 = 8.61 26 1.10 x 5.35 = 5.89 L2 4.485 x 1.80 = 8.07 27 1.45 x 2.90 = 4.21 L3 0.905 x 1.68 = 1.52 28 1.25 x 2.90 = 3.63 L4 0.60 x 2.20 = 1.32 29 1.10 x 1.25 = 1.38 Total = 37.94 30 4.75 x 4.45 = 21.14 Total Deduction = 386.85 31 2.15 x 4.80 = 10.32 Net BUA = 238.83 32 11.55 x 4.30 = 49.67 33 1.25 x 3.05 = 3.81 34 3.15 x 0.15 = 0.47 Total = 300.14 Terrace Floor Plan, Sections Stamp & Date of Approval of Plans 03 of 03 Approved subject to the conditions mentioned in this office letter no. P-10543/2022/ (2616 And Other)/H/E Ward/Kolekalyan-H/E S.E.(B.P.)-K/E - C A.E.(B.P.)-H/E E.E.(B.P.)-H/E 8.15 9.25 1.65 0.3 1 5.82 x 2.05 x 0.50 = 5.97 2 3.92 x 1.20 x 0.50 = 2.35 1 5 1.2 3 3.83 x 0.42 x 0.50 = 0.80 2.0 2 4 8.61 x 1.53 x 0.50 = 6.59 5.8 2 3.92 5 8.61 x 3.29 x 0.50 = 14.16 1 6 4.98 x 1.98 x 0.50 = 4.93 8.6 3 1.5 7 2.10 x 0.12 x 0.50 = 0.13 3 3.83x0.42 5 4 8 8.25 x 4.53 x 0.50 = 18.69 9 9 7.54 x 3.62 x 0.50 = 13.65 3.2 10 2.45 x 0.31 x 0.50 = 0.38 4.9 8 6 11 4.53 x 0.25 x 0.50 = 0.57 8 1.9 7 2.1x0.12 12 4.53 x 1.25 x 0.50 = 2.83 4.53 13 5.29 x 2.94 x 0.50 = 7.78 8 14 3.14 x 0.36 x 0.50 = 0.57 8.25 15 5.78 x 1.93 x 0.50 = 5.58 16 5.78 x 1.62 x 0.50 = 4.68 7.54 17 2.20 x 0.72 x 0.50 = 0.79 4.53x0.25 9 11 18 4.22 x 0.77 x 0.50 = 1.62 3.62 10 19 1.35 x 0.46 x 0.50 = 0.31 4.53x1.25 2.45x0.31 6.71x0.25 12 20 4.22 x 1.25 x 0.50 = 2.64 3.24x1.03 5.29 21 6.19 x 2.36 x 0.50 = 7.30 37 32 13 6.9x1.21 2.96x0.58 1.35x0.46 .62 5.7 2.94 22 7.13 x 1.42 x 0.50 = 5.06 36 23 7.13 x 2.46 x 0.50 = 8.77 28 5.2x0.1 19 1 8 15 35 2.6 33 3 14 5.9 3 25 1.9 3.14x0.36 24 5.23 x 2.10 x 0.50 = 5.49 6.9x1.25 3 30 3.23 4.7 6 2.83 2 17 25 5.20 x 0.10 x 0.50 = 0.26 3.67 3.5 31 7.7 29 26 5 1.4 2.2x0.72 26 6.50 x 4.05 x 0.50 = 13.16 7 4.85 4.0 22 21 18 27 6.50 x 4.51 x 0.50 = 14.66 9.82 6.19 3 4.22x0.77 5.23 7.1 6 1 6.5 2.3 20 4.22x1.24 28 2.96 x 0.58 x 0.50 = 0.86 4.5 27 24 23 29 4.85 x 2.83 x 0.50 = 6.86 2.1 6 30 7.77 x 3.56 x 0.50 = 13.83 2.4 31 9.82 x 3.67 x 0.50 = 18.02 32 3.24 x 1.03 x 0.50 = 1.67 LOS Required : 209.44 Sq.mtr. 33 4.73 x 2.63 x 0.50 = 6.22 LOS Proposed : 216.03 Sq.mtr. 34 5.90 x 3.23 x 0.50 = 9.53 Paved RG : 102.46 Sq.mtr. (47.33%) 35 6.90 x 1.25 x 0.50 = 4.31 LOS : 113.57 Sq.mtr. 36 6.90 x 1.21 x 0.50 = 4.17 37 6.71 x 0.25 x 0.50 = 0.84 Total = 216.03