PROPOSAL AS PER REG. 30(A) OF DCPR 2034 04 / 04 FILE NO.: P-16569/2023)/R/C Ward/FP V V O O TOIL TOIL I I D D 0.60 SS KIT 1.00 0.60 0.45 0.60 0.70 0.60 0.60 TOIL TOIL KIT 1.20 TERRACE 0.08 0.60 TERRACE OHT SS KIT 1.00 0.05 0.60 0.45 0.60 0.70 0.60 0.60 KIT 1.20 TOIL TOIL 0.08 0.60 SS M. S. LADDER KIT 1.00 0.05 0.60 0.45 0.60 V V LMR O O I I D D SECTION THROUGH CORNICE & CHAJJA SECTION X-X SERVICE DUCT OHT & LMR SCALE - 1:100 0.90 MS Safety Ralling 1.50 OHT 3.20 3.20 3.20 2.90 OHT / LMR 4.50 MT. HIGH PARAPET 4.50 MT. HIGH PARAPET WALL WITH 1.30 MT SOLID WALL WITH 1.30 MT SOLID 4.50 MT. HIGH PARAPET LMR 4.25 4.25 WALL + 3.20 MT. WALL WITH WALL WITH 1.30 MT SOLID 60% VOID WALL + 3.20 MT. WALL WITH WALL + 3.20 MT. WALL WITH 60% VOID 60% VOID 2.75 1.30 1.30 1.30 1.35 TERRACE FLR. TERRACE FLR. TERRACE FLR. 0.60 0.60 + 30.60 Mts. 0.60 0.60 + 30.60 Mts. 0.60 0.60 0.70 0.70 0.60 0.60 + 30.60 Mts. 1.20 1.20 2.90 2.90 2.90 2.90 1.00 1.00 TOIL PASS BED 0.23 MS Railing flushed to Bldg line KIT BED MS Railing flushed to Bldg line 1.00 KIT TOIL KIT 1.00 9th FLOOR 9th FLOOR 9th FLOOR 0.60 0.60 + 27.70 Mts. 0.60 0.60 + 27.70 Mts. 0.60 0.60 0.70 0.70 0.60 0.60 + 27.70 Mts. W E L L 1.20 1.20 2.90 2.90 2.90 2.90 1.00 1.00 TOIL PASS BED MS Railing flushed to Bldg line KIT BED MS Railing flushed to Bldg line 1.00 KIT TOIL KIT 1.00 8th FLOOR 8th FLOOR 8th FLOOR 0.60 0.60 + 24.80 Mts. 0.60 0.60 + 24.80 Mts. 0.60 0.60 0.70 0.70 0.60 0.60 + 24.80 Mts. L I F T 1.20 1.20 2.90 2.90 2.90 2.90 1.00 1.00 TOIL PASS BED 1.00 KIT TOIL KIT 1.00 MS Railing flushed to Bldg line MS Railing flushed to Bldg line KIT BED 7th FLOOR 7th FLOOR 7th FLOOR 0.60 0.60 + 21.90 Mts. 0.60 0.60 + 21.90 Mts. 0.60 0.60 0.70 0.70 0.60 0.60 + 21.90 Mts. 1.20 1.20 2.90 2.90 2.90 2.90 1.00 1.00 TOIL PASS BED MS Railing flushed to Bldg line KIT BED MS Railing flushed to Bldg line 1.00 KIT TOIL KIT 1.00 6th FLOOR 6th FLOOR 6th FLOOR 0.60 0.60 + 19.00 Mts. 0.60 0.60 + 19.00 Mts. 0.60 0.60 0.70 0.70 0.60 0.60 + 19.00 Mts. D U C T 1.20 1.20 2.90 2.90 2.90 2.90 1.00 1.00 MS Railing flushed to Bldg line TOIL PASS BED MS Railing flushed to Bldg line KIT BED 1.00 KIT TOIL KIT 1.00 5th FLOOR 5th FLOOR 5th FLOOR 0.60 0.60 + 16.10 Mts. 0.60 0.60 + 16.10 Mts. 0.60 0.60 0.70 0.70 0.60 0.60 + 16.10 Mts. S K Y 30.60 30.60 30.60 FORM 'II' 1.20 1.20 2.90 CONTENTS OF SHEET 2.90 2.90 2.90 1.00 SECTION & OHT TANK PLAN 1.00 KIT TOIL KIT TOIL PASS BED MS Railing flushed to Bldg line KIT BED MS Railing flushed to Bldg line 1.00 1.00 T O 4th FLOOR 4th FLOOR 4th FLOOR STAMP OF APPROVAL OF PLANS 0.60 0.60 + 13.20 Mts. 0.60 0.60 + 13.20 Mts. 0.60 0.60 0.70 0.70 0.60 0.60 + 13.20 Mts. NOTE:- 1.THIS PLANS ARE APPROVED SUBJECT TO THE CONDITION'S MENTIONED IN THE IOD ISSUED UNDER EVEN NO. ON EVEN DATE. 1.20 1.20 2.90 2.90 2.90 2.90 O P E M 1.00 1.00 KIT TOIL KIT TOIL PASS BED MS Railing flushed to Bldg line KIT BED MS Railing flushed to Bldg line 1.00 1.00 3rd FLOOR 3rd FLOOR 3rd FLOOR THIS PLAN IS DIGITALLY SIGNED & DOES NOT REQUIRE PHYSICAL SIGNATURE. 0.60 + 10.30 Mts. 2.75 0.60 + 10.30 Mts. 0.60 0.70 0.70 0.60 + 10.30 Mts. Vertical Fins 0.60 0.60 0.60 0.60 W E L L Digitally signed Swapnil Digitally signed by Swapnil Rahul Bhagawat Patil 1.20 1.20 by Rahul DN: c=IN, o=Personal, title=1222, 2.90 2.90 2.90 2.90 pseudonym=4E47F2C4237A80D CROSS BEAM IN VOID F682106E8B59BCE6EC8FC5E64, Babusha Pandit Babush Date: Bhaga 2.5.4.20=820d5f33f377a63b0bdc 5aa9137429c94a0b86b6ebd7be2 0567cb1c0718b2f53, postalCode=425001, KIT TOIL KIT 1.00 1.00 2023.09.11 wat HANUMANT st=Maharashtra, TOIL PASS BED KIT Digitally signed by a Pandit MS Railing flushed to Bldg line COLUMN COUNTED IN FSI serialNumber=8FB399BD24C2D2 HANUMANT 19:20:33 89313094AF607480B787166C8E 2nd FLOOR 2nd FLOOR 2nd FLOOR 1173291F2D3BF3DD7B387F1A, SADASHIVRAO SADASHIVRAO BURE Patil cn=Swapnil Bhagawat Patil +05'30' Date: 2023.09.27 14:26:13 0.70 Date: 2023.09.12 21:51:08 +05'30' 0.60 + 7.40 Mts. + 7.40 Mts. 0.60 + 7.40 Mts. Adobe Acrobat Reader version: BURE +05'30' 0.60 0.60 2023.003.20284 L I F T S.E.B.P. (R-4) A.E.B.P. (R-II) E.E.B.P. (R-I) 1.20 2.90 2.90 2.90 2.90 1.00 0.45 DESCRIPTION OF PROPOSAL AND PROPERTY NORTH TOIL KIT TOIL PASS BED MS Railing flushed to Bldg line 1.00 PROPOSED REDEVELOPMENT ON PLOT BEARING F.P.No. 539, TPS 1st FLOOR 1st FLOOR 1st FLOOR 0.60 + 4.50 Mts. + 4.50 Mts. 0.60 + 4.50 Mts. 1.47 BORIVALI No. III, R/C WARD, AT BORIVALI (WEST), MUMBAI - 400 092. 0.60 7.25 0.60 N 1.50 1.00 NAME & ADDRESS OF OWNER LOFT NEETA Digitally signed 3.83 by NEETA MEHUL 4.20 4.35 4.35 4.50 OMKARA INFRATECH MEHUL SHAH Date: 2023.09.08 2.40 309, Corporate Corner, Next To Dalmia College, Sunder Nagar, Malad SHAH 14:08:40 +05'30' 2.35 2.52 (West), Mumbai - 400 064. SHOP SIGNATURE OF OWNER/ DEVELOPER WC JOB NO. SCALE CHECKED BY SHEET NO. DATE DRAWN BY 0.67 4/4 05.07.2023 AS STATED 0.30 0.15 0.15 0.15 0.17 SIGNATURE, NAME & ADDRESS OF LICENCED ARCHITECTS SECTION A-A SECTION B-B SECTION C-C SECTION D-D Digitally signed SCALE - 1:100 SCALE - 1:100 SCALE - 1:100 SCALE - 1:100 DISHANT N. SHAH DISHANT by DISHANT A-01, POPPY CHSL, RAMNAGAR LANE, SAIBABA NAGAR, NITINKUM NITINKUMAR SHAH BORIVALI (WEST), MUMBAI - 400092 AR SHAH Date: 2023.09.08 14:32:03 +05'30' MO. +91 8866160525 E-MAIL: DISHANT.SHAH68@GMAIL.COM (LICENSED SURVEYOR) LIC. No.S/840000048/LS.