AR DESIGN STUDIO ARCHITECTURE | INTERIORS | PMC | LANDSCAPE FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE Date: 22/04/2024 To BALI SPACES LLP Office No. 04, A Wing, 1st Floor, Onkar, Gen. A. K. Vaidya Marg, Dindoshi, Malad East, Mumbai 400097. Subject: Certificate of Percentage of Completion of Construction Work of One building having single wing situated on plot bearing CTS No. 638, 638/1 to 12 of Village Pahadi Goregaon West, Plot No. 163 at Jawahar Nagar, Road No. 2, Goregaon West, P/South Ward, Mumbai 400104 demarcated by its boundaries by land bearing Plot No. 146 of Jawahar Nagar on North side, by Road No. 2 of Jawahar Nagar to the South, by land bearing Plot No. 162 of Jawahar Nagar on East side & by land bearing Plot No. 164 of Jawahar Nagar on West side admeasuring 688.10 sq. mts. area; being developed by M/s. Bali Spaces LLP. Sir, I Shri. Ankit U. Jain, have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of Building having single Wing of the Phase I of the Project, situated on plot bearing CTS No. 638, 638/1 to 12 of Village Pahadi Goregaon West, Plot No. 163 at Jawahar Nagar, Road No. 2, Goregaon West, P/South Ward, Mumbai 400104 admeasuring 688.10 sq. mts. area being developed by M/s. Bali Spaces LLP. 1. Following technical professionals are appointed by Owner / Promoter: - (i) Shri. Ankit U Jain of M/s. AR Design Studio as Architect; (ii) Shri Hiren Tanna as Structural Consultant (iii) Shri. Dinesh H. Mehtaas Site Supervisor Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P51800053916 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. underEaze 2127 & 2128, MahaRERA Zone is as per table Mall, Goregoan A herein Mulundbelow. linkThe percentage Road, Sunderof the work Nagar, executed Malad West. with respect to each of the activity of the entire phase is detailed in Table B. ardesignstudio2017@gmail.com | work@ardesignstudio.co.in https://ardesignstudio.co.in/ +912240169458 / +917738723684 / 85 Table A Building /Wing Number_(to be prepared separately for each Building /Wing of the Project) Sr. Tasks / Activity Percentage of Work No. 1. Excavation 100% 2. Number of Basement(s) and Plinth 90% 3. Number of Podiums 00% 4. Stilt Floor 00% 5. Number of Slabs of Super Structure 00 % 6. Internal walls, Internal Plaster, Floorings within 00% Flats/Premises, Doors and Windows to each of the Flat/Premises 7. Sanitary Fittings within the Flat/Premises, 00% Electrical Fittings within the Flat/Premises 8. Staircases, Lifts Wells and Lobbies at each Floor 00% level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9. The external plumbing and external plaster, 00% elevation, completion of terraces with waterproofing of the Building/Wing 10. Installation of lifts, water pumps, Fire Fighting 10% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other 00%requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Internal & External Development Works in Respect of the entire Registered Phase Sr. Common Area & Proposed Percentage of No Details Facilities, Amenities (Yes/No) completion 1. Internal Road & No 00% - Footpaths 2. Water Supply Yes 00% Will be completed as per consultant Remarks 3. Sewerage Chamber Lines, Yes 25% Will be completed as Septic Tank per consultant Remarks 4. Storm water Drains Yes 00% Will be completed as per Tree NOC 5. Landscape & Tree Yes 00% Will be completed as Planting per Vermiculture Remarks 6. Street Lighting No 00% - 7. Community Building No 00% - 8. Treatment and Disposal No 00% - of Sewerage & Sullage Water 9. Solid Waste Management Yes 00% Will be completed as & Disposal per Vermiculture Remarks 10. Water conservation & Yes 00% Will be completed as Rain water Harvesting per consultant Remarks 11. Energy Management No 00% - 12. Fire Protection & Fire Yes 00% Will be completed as Safety Requirement per fire consultant Remarks 13. Electric Meter room, Yes 00% Will be completed as substation, Receiving per fire consultant Station Remarks 14. Open/Stack Parking Yes 00% As per Consultant parking remark 15. Others (Option To Add 00% - More) Yours Faithfully Agreed and Accepted by Ankit Digitally signed by SUSHANT Digitally signed by SUSHANT VIJAY Uttamchand Ankit Uttamchand Jain Date: 2024.04.22 VIJAY PARMAR Date: 2024.04.23 Jain 16:30:43 +05'30' PARMAR 17:38:54 +05'30' Shri. Ankit U. Jain of M/s. AR Design Studio. Signature of Promoter Lic. No. CA/2014/64556 Name: M/s. Bali Estates LLP. Date: 22/04/2024