HABIB ANSARI 2041205,2n't lrloor. Sanil a Complex. Roshan llaug. Ilhiwandi - 421302 FORfrl-2A lse€ R6gulation 3A.l ENGINEERS'S CERTIFICATE FOR QUALITY ASSURANCE (Site SupeNiso/s Certificate) (To b€ submitt€d at the end of Financial Year) orn t>\o6ltotd To, The STAR RISE Kurla, Kurla, Mumbai Suburban, 400070 Quality Assuranc€ Certificate (Certmcate No. ..-.......... ......forthe Year Ending ZIL\, )a.6 Subiect : Certiricate for quality ot materials used and quality of Construction and workmanship of the work of SAYBA ORCHID having MahaRERA Registation Number P518fi,054279 being developed by STAR RISE Sir. me .Ha$.:tL have undeftaken an assignment of supervision of this real estate prcject Anrc,.n i Our Re3ponsibility To carry out the work in accordance with the development permission and as per tho approved plan, to submit certificate ot supervision of work, to carry out material testing in-situ or in an aulhorizad laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant cods of practica. The details of the quality are as tollows : 1. Structural Design, Stability and Terting Sr. No. Parameters Yes/No Remarks 1 Whether soil investigations of the sile has been Yes conducted before the sbuctural design and soil parameters have been accounted for in the structural desion/drawinos? 2 Whether Structural Engineer has been appointed for Yes Name: Vikas Gokhale the project? License No: STR/G/42 Mobtle. 8976072223 E-mail: info@asc.oro.in 3 Whether the inspection registers, site order book Yes and quality control test registers are maintained at th6 site properly and endorssd by the Engineerjn- Charoe? 4 Whether testing facilities to check quality of material No is available at site? Page l of .1 Sr. No. I Parameters Yes,lNo Remarks Whether the statuary provisions for disaster Yes resistance/earlhquake resistant design have been incorporated. specially in case of multi-storeyed construction? 6 Has suitable cognizance been taken on demarcated Yes flood lines and appmpriate precautions taken for protecting the site from flooding considering local floodinq issues? 2. lnput Materials Sr. No. Parameters Yes/No Remarks 1 Whether the following building materials confirm to Yes relevant IS/BS/NBC Code, or as per lndustry Standards? lf ves. Drovide datails: (a) Cement. concrete and coarse aoqreoat€ Yes (b) Steel and its allovs Yes (c) Eleclricalwire. fittinqs and accessories Yes (d) Plumbino and sanitarv fittinos Yes 2 Whelher reoular tests of materials and construction Yes products ar; being done lrom accredited labs also? lf yes, details of such labs 3 Whether manufacturer test certificate for cement, Yes steel, pipes etc. have been obtained and whether suDDlv records are beinq maintained? 4 Whether suitable water is being used for Yes construction? (i) What is the source of watea Yes (ii) Has water been tested and approved by Yes Enoineer-in-Charqe before construction? (iii) Has water been lested subsequently as per Yes reouirement? 3. Quality of Workmanship Sr. No. I Parameters YesJNo Remarks 1 Wh€ther works of all the electrical Yes winng/connections/lifr installation/other electrical installations have been carried out under authorized/registered electrical engineer and whether records of the same has been maintained? 2 Whether all related works of plumbing & sanitary Yes including installation ot water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized/registered plumbers/sanita ry contractors and whether records of the same has been maintained? 3 Whether all the work is being canied out under Yes supeNision of experienced and skilled protessional? Further, whether the workmanship and quality is satisfactory and up to the mark and ttre work is within the acceptable and permissible limits of deviations as per relevant Code of Practice? Page 2 of3 Sr. No. Pa rameters Yes/No Remarks 4 Whether remedial measures are undertaken to Yes prevent dampness and leakages? It yes. provide details 5 Whether safety precautions are undertaken during Yes construction activities for all WDe of workers? 4. Miscellaneous Sr. No. Paramet6rs Yes/No No 1 Whether lhird party quality inspection is being No carried out on site during/atter completion of the works? lf ves. Drovi{re details. 2 Whether anti-termite trealment has been undedaken Yes for the soil? 3 Whether fire.fighting arrangements has been Yes undertaken under supervision of fire consultant? 4 Whether proper signages have been installed on Yes site/comDleted buildirq as per requirement? Whether precautions are underlakan to avoid air Yes Dollution durino consf uction? Please sD€cifv. 6 Whether records ot alltest reportgresults have been Yes properD kept in the prescribed lormats and whether the same are available at site for viewing by allottees and to be handed over to the association of allottees? 7 Whether all relevant records including sanctioned Yes building plans, utility drarvings, various test reporlJresults have b€en properly kept in the prescribed tormats to be handed over to the association of allotlees? 8 Any innovative/cost effective/green technology has No been used tor improving quality/energy effciency? Please sDecifv. Yours E ly si9 Engineer (Site Supervisor) Name: Habib Ansari Qualification (Not l€ss than graduale) Liceme No. (if any): 4r'150/Ss{ll PhoneNo: L71ogL4t+< Place: rhqmbaj d accepted Sign ofP Name: STAR RISE o"t ,t>l<o,t6 Page 3 of3