HABIB ANSARI 204/205, 2"d Floor, Saniya Complex, Roshan Baug, Bhirvandi - 421302. FORM.2A [Se€ Rogulation 3A.l ENGINEERS'S CERTI FICATE FOR QUALITY ASSURANCE (Site Supervisor's Certifi cate) (To be submitted al ths end of Financial Year) Date: l2-l oblbw To, The STAR RISE Kurla, Kurla, Mumbai Suburban, 400070 Quality Assurance Certificate (Certificate No. ... .. ..............for the v ear enaing2'.Q 2 3 : 2.0.$ Subiect : Cedificate for quality of materials used and quality of Construction and workmanship of the work of SAYBA ORCHID having MahaRERA Registration Number P51800054279 being developed by STAR RISE Sir, wu"H@b have undertaken an assignment of supervision of this real estate project Ansowi Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications. and as per NBC and / or other relevant code of practice. The details of the quality are as follows : '1. Structural Oesign, Stability and Testing Sr. No Pa rameters YesrNo Remarks 1 Whether soil investigations of the site has been Yes conducted before the structural design and soil parameters have been accounled for in the structural desion/drawinos? 2 Whether Structural Engineer has been appointed for Yes Name: Vikas Gokhale the project? License No: STR/G/42 Mobile: 8976072223 E-mail: info@asc.oro.in 3 Whether the inspection registers, site order book Yes and quality control test registers are maintained at th6 site properly and endorsed by the Engineer-in- Charqe? 4 Whether testing facilities to check quality of material No is available at sile? Page 1of3 Sr. No. Parameters Yes/No Remarks 5 Whether the statuary provisions for disaster Yes resistance/earthquake resistant design have been incorporated. specially in case of multlstoreyed construction? 6 Has suitiable cognizance been taken on demarcated Yes flood lines and appropriate precautions taken for protecting fre site from flooding considering local floodinq issues? 2. lnput Materials Sr. No. Parameters Yes/No Remarks 1 Whether the following building materials confirm to Yes relevant IS/BS/NBC Code, or as per lndustry Standards? lf ves, provide details: (a) Cement. concrete and coarse aqqreqate Yes (b) Steel and its allovs Yes (c) Electricalwire. fittinqs and accessories Yes (d) Plumbino and sanitarv fittinos Yes 2 Whether reoular tests of materials and construction Yes products arA beinq done from accredited labs also? lf ves. details of such labs 3 Whether manufacturer test certificate for cement, Yes steel, pipes etc. have been obtained and whether suoDlv records are beino maintained? 4 Whether suitable water is being used for Yes construction? (i) What is the source of water? Yes (ii) Has water been tested and approved by Yes Enoineer-in-Charqe before mnstruction? (iii) Has water been tested subsequently as per Yes reouirement? 3. Quality of Workmanship Sr. No. Parameters YeslNo Remarks 1 Whether works of all the electrical Yes wiring/connectionVlift installationiother electrical installations have been carried out under authorized/registered electrical engineer and whether records of the same has been maintained? 2 Whether all related works of plumbing & sanitary Yes including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized/registered plumbers/sanitary contractors and whether records of the same has been maintained? 3 Whether all the work rs being canied out under Yes supervrsron of experienced and skilled professional? Further, whether the workmanship and quality is satisfactory and up to the mark and the work is within the acceptable and permissible limits of deviations as per relevant Code of Practice? Page 2 of -l Sr. No. Parameters Yes/No Remarks 4 Whether remedial measures are undertaken to Yes prevent dampness and leakages? It yes, provide details 5 Whether safety precautions arB undertaken during Yes construction activities for all tvDe ot workers? 4. Miscellaneous Sr. No. Parameters Y6s/No No 1 Whether third party quality inspection is being No carried out on site during/after completion of the works? It ves, Drovide details. 2 Whether anti-termite treatment has b€en undertaken Yes ,or the soil? Whether fire.fighting arrangements has been Yes undertaken under supervision of fire consultant? 4 Whether proper signages have been installed on Yes site/comDleted buildinq as per requirement? 5 Whether precautions are underlaken to avoid air Yes Dollution durino construction? Please specity 6 Whether records of all test reportdresults har/€ been Yes property kept in the prescribed formats and whether th€ same are available at sita for viewing by allottees and to be handed over to the association of allottees? 7 Whether all relevant records including sanctioned Yes building plans, utility drawings, various test reporlgresults have been properly kept in the prescribed lormats to be handed over to the association of allotlees? 8 Any innovativs/cost effectiv€y'grsen technology has No been used for improving quality/energy effciency? Ploase sDecifv. Yours Faithfully Signature of Eng Supervisor) Nama: Habib Ansari Qualification (Not l€ss than graduale) License No. (if any): A'/150/SS-lll phoneNo: g\logLkg,}8 ptace: fD u,m bdu. Agreed accepted Signatu Promoter Name: STAR RISE oate:116\7Ay1 Page 3 ot 3