VB+A vlvek bhosale associates architects+ Interior designers 'FORM 1' ARCHITECT'S CERTIFICATE . 13• ,April ,2026 To, M/s. Makwise Homes LLP B / 902, Lords CHS. Ltd. Plot no. 35 /35A, Sector 15, CBD Belapur, Navi Mumbai 400 614 Subject: Certificate of Percentage of Completion of Construction Work of "Anuvidnyan Nagar Co. Op. Housing Society Ltd." Composite Building, comprising of Two Wings 'A'&'B' on Plot bearing Survey No. 141 (Pt), CTS No. 178(pt), 179 (pt.), 174 (pt.), Village Mankhurd, Near Datta Mandir, Agarwadi, M/East Ward, Mankhurd, Mumbai- 400088.Demarcated by its boundaries, (latitude and longitude of the end points of plot) 19°02'53.71"N,72°SS'31.48•Eto the East (18.30 Mt. Wide Agarwadi Rd.),19°02'SS.42•N,72°SS'31.93•Eto the North (Railway Boundary),19°02'56.62"N,72°SS'31.0S"Eto the West (Nalla side), 19°02'54.47•N,72°SS'29.67"Eto the South (Prop. D.P. Rd.)of Division Konkan, village Mankhurd ,Taluka Kurla District Mumbai Suburban, PIN400088, Ad measuring Plot area 3631.70 Sq. Mt. having MahaRERA Registration Number : P51800053906, Being developed by M/s. Makwlse Homes LLP Sir, I Architect Vivek Bhosale of M/s. Vivek Bhosale Assodates have undertaken assignment as Architect for certifying Percentage of Completion of Construction Work of Building, comprising of Two Wings 'A'&'B' on Plot bearing Survey No. 141 (Pt), CTS No. 178(pt), 179 (pt.), 174 (pt.), Village Mankhurd, Near Datta Mandir, Agarwadi, M/East Ward, Mankhurd, Mumbai- 400088. Ad measuring Plot area 3631.70 Sq. Mt., being developed by M/s. Makwfse Homes LLP 1. Following Technical Professionals are appointed by Promoter: (I} Ar. Vivek Bhosale of M/s. Vlvek Bhosale Associates as the Architects (II} Er. Samarth P. Agarwal of M/s. Adharshlla Consultants as the Structural Consultant. (Ill} Er. Kanhaiya Vaclav, M/s. KY MEP Consultants as the MEP Consultant. (Iv} Er. Sachln S. Yadav as the Site Supervisor Based on Site Inspection, with respect to each of the Wing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the Wings of the Real Estate Project is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. f. H ,. .,,s 0 ti,_ ~~ ~ l A, DR. DAMJI SADAN, A. S. GAWDE MARG, RAJGAD CHOWK, GHATKOPAR (E), MUMBAI 400077, ~ ,,~, ~ (OFF.)+91 99306 39636, (DIR} +91 9870199673, EMAIL: vb,grch@gmqll,com. vbo.Uudfo@qmgll.com WEB SITE: www.vbaa 4' .1~ ,* ~V/ MU~~~ , I I• I VB+/\ vlvek bhosale associa tes architec ts+ Interior designers TABLE-A (For Wing "A") Sr. No. Tasks/ Activity Percentage of Work done (1) (2) (3) 1 Excavation 100% 2 Basement (Pit Parking) 100% 3 Plinth 100% 4 Podium NIL 5 Stilt Floor 100% 6 Fifteen (15) Number of Slabs of Super Structure 84%(12th floor Slab Completed) 7 Internal Walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises. 8 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises 9 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts, Overhead and Underground Water Tanks 10 The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing. 11 Installation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finish in& to entrance lobby/s, plinth protection, paving of areas appurtenant to Bulldlng/Wlng, Compound Wall and all other requirements as may be required to obtain - Occupation / Completion Certifl~te ,-½"c 1-Jn~ ~~u - {,-~ ,q:- ~ .- ~.~ * 1,, ~ * ""v, r,1u,~~~' 1 A, DR. DAMJI SADAN, AS. GAWDE MARG, RA/GAD CHOWK, GHATKOPAR (E), MUMBAI 400077, (OFF.)+9199306 39636, (DIR) +919870199673, EMAJL: ybqrch@qmqll.com ybg.studlo@gmqll.com WEB SITE.: www.vboarchit~cts.in VB+A vlvek bhos ale ass ocia tes arch itec ts+ Interio r desig ners TABLE-A (For Wing "B") Sr. No. Tasks/ Activity Percentage of Work done (2) (3) (1) 1 Excavation 100% 2 Basement (Pit Parking) 100% 3 Plinth 100% 4 Podium NIL 5 Stilt Floor 100% th "6 Fifteen (15) Number of Slabs of Super Structure 84%(12 floor Slab Completed) 7 Internal Walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises. 8 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises 9 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts ,Overhead and ~ Underground Water Tanks 10 The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing. 11 Installation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Bulldina/Wing, Compound Wall and J~c;tHO A,~ all other requirements as may be required to obtain i1At _~ Occupation / Completion Certificate \ *' •;,,~ la .."+ J "-1v1 MU\ll~~ - 4()0077, 1 A, DR, DAMJI SADAN, A S. GA WDE MARG, RA/GAD CHOWJ<, GHATKOPAR (E), MUMBAI 306 39636, (DIR) +919870199673, EMAJL: vbarch@qm qil.com, vba.studlo@ qmoil.com WEB SITE: www.vbaarchitects.in (OFF.)+9199 I VB+A vlvek bhosale assoc iates archite cts+ Interior designers TABLE-8 Internal and External Development Works In respect of the entire Project Sr.No. Common Areas and Proposed Percentage Details Facilities Amenities Yes/No Work Done (1) (2) (3) (4) (5) 1 Internal Road & Foot Paths NO 0% NIL 2 Water Supply YES ()OA, Connection to be Taken From MCGM 3 Sewerage (chamber, lines, YES 0% Only Internal Sewerage Septic Tank, STP). Line to be laid - 4 Storm Water Drains YES 00/4 Internal Strom Water drain to be made 5 Landscape / Tree Planting. YES 0% Tree Planting As per Requirement of MCGM 6 Street Lighting NO ()OA, NIL 7 Community Buildings NO 0% NIL 8 Treatment and disposal of NO ()OA, NIL sewage and sullage water. 9 Solid Waste management & YES 0% NIL Disposal 10 Water Conservation, Rain YES 0% NIL Water Harvesting 11 Energy management NO 0% NIL 12 Fire protection and YES 0% As Per Requirement of fire safety requirements Chief Fire Officer 13 Electrical Meter Room, Yes 0% Only Electrical Meter Substation, Receiving Room Station 14 Other Option &More NO NO NIL Yours Truly, ~TH ;=k;e;:;-~;; 8HOSAl.E -- Vlvek Bhosale: Architect ~ Regd. No. CA/2007/396'36 For, M/s. VNEK BHOSALE ASSOCIATES Agreed and Accepted by Mr. Dinesh R. Purohft (Promoter/ Developer) For, M/s. Makwlse Homes LLP 1 A, OR. OAMJI SADAN, A. S. GA WOE MARG, RA/GAD CHO WK, GHATKOPAR (E), MUMBAI 400077, (OFF.)+9199306 39636, (DIR} +919870199673, EMAIL: vbgrfh@am,v'f.com. vbq.S{udio@qmoll.com WEB SITE: www.vboorchitects.in