VB+/\ vlvek bhosale associates architects+ Interior designers 'FORM 1' ARCHITECT'S CERTIFICATE 11th ,0ctober ,2025 To, M/s. Makwlse Homes LLP B / 902, Lords CHS. Ltd. Plot no. 35 /35A, Sector 15, CBD Belapur, Navi Mumbai 400 614 Subject: Certificate of Percentage of Completion of Construction Work of "Anuvidnyan Nagar Co. Op. Housing Society Ltd." Composite Building, comprising of Two Wings 'A'&'B'on Plot bearing Survey No. 141 (Pt), CTS No. 178(pt), 179 (pt.), 174 (pt.), Village Mankhurd, Near Datta Mandir, Agarwadi, M/East Ward, Mankhurd, Mumbai- 400088.Demarcated by its boundaries, (latitude and longitude of the end points of plot) 19°0Z'S3.71•N,72°SS'31.4r'Eto the East (18.30 Mt. Wide Agarwadi Rd.),19°0Z'SS.42•N772°55'31.93•Eto theNorth (Railway Boundary),19°02'56.62"N,72°SS'31.0S"Eto the West (Nallaside), 19°02'54A7"N,72°s5'29.67"Eto the South (Prop. D.P. Rd.)of Division Konkan, villageMankhurd ,Taluka Kurla District MumbaiSuburban, PIN400088, Admeasuring Plot area 3631.70 Sq. Mt.having MahaRERA Registration Number: PS1800053906, Being developed byM/s. Makwlse Homes LLP Sir, I Architect Vlvek Bhosale of M/s. Vlvek Bhosale Associateshave undertaken assignment as Architect for certifying Percentage of Completion of Construction Work of Building, comprising of Two Wings 'A'&'B' on Plot bearing Survey No. 141 (Pt), CTS No. 178(pt), 179 (pt.), 174 (pt.), Village Mankhurd, Near Datta Mandir, Agarwadi, M/East Ward, Mankhurd, Mumbai- 400088. Admeasuring Plot area 3631.70 Sq. Mt., being developed byM/s. Makwise Homes LLP 1. Followin1 Technical Professionals are appointed by Promoter: (I} Ar.Vlvek Bhosale of M/s. Vlvek Bhosale Associatesas the Architects (II} Er. Samarth P. Agarwal of M/s. Adharshlla Consultants as the Structural Consultant. (Ill} Er. Kanhalya Vaclav, M/s. KY MEP Consultants as the MEP Consultant. (Iv} Er. Sachln S. Yadavas the Site Supervisor Based on Site, Inspection, with respect to each of the Wing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the Wings of the Real Estate Project is as per table A herein below. The percentage of the work ex ed with respect to each of the activity of the entire phase is detailed in Table B. ~,sE Ho"1. ~ ~ ~ ~ ,~' .- i- 1 A, DR. DAMJI SADAN, A. S. GAWDE MARG, RA/GAD CHOW#(, GHATKOPAR (E), MUMBAI 400077, (OFF.}+9199306 39636, (DIR} +919870199673, EMAIL: vbarch@qmail.com1 vba.studfo@amafl.com WEB SITE: www.vba~1l',l:.t.~ VB+A vlvek bhosale associa tes architec ts+ Interior designers TABLE-A (For Wing "A•) Sr. No. Tasks/ Activity Percentage of Work done (1) (2) (3) 1 Excavation 100% 2 Basement (Pit Parking} 100% 3 Plinth 100% 4 Podium NIL 5 Stilt Floor 100% 6 Fifteen (15) Number of Slabs of Super Structure 77%(11thfloor Slab Completed) 7 Internal Walls, Internal Plaster, Floorings within 0% Flats/Premises; Doors and Windows to each of the Flat/Premises. 8 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises 9 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts,Overhead and Underground Water Tanks 10 The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing. 11 Installation of lifts, water pumps, Fire flahting Fittings and Equipment as per CFO NOC, Electrical °" fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Bullding/Win1, Compound Wall and all other requirements as may be required to obtain - Occupation / Completion Certificate ~ HO~ 1/~"J 'tv'j ~ ~ ~ ~I jj~II : * ~~ 1 A, DR. DAMJI SADAN, A S. GA WOE MARG, RA/GAD CHOWK, GHATKOPAR (E), MUMBAI 400077, (OFF.)+9199306 39636, (DIR} +91 9870199573, EMAIL: vbqrch@amqil.com. yba.stuq,io@gmofl.com WEB SITE: www.vbaarchitects.in VB+A vlvek bhosale associa tes architec ts+ Interior designers TABLE-A (For Wing "B") Sr. No. Tasks/ Activity Percentage of Work done (1) (2) (3) 1 Excavation 100% 2 Basement (Pit Parking) 100% 3 Plinth 100% 4 Pot.lium NIL 5 Stilt Floor 100% 6 Fifteen (15) Number of Slabs of Super Structure n%(11thfloor Slab Completed) 7 Internal Walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises. 8 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittin1s within the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor level 9 connecting Staircases and Lifts ,Overhead and Underground Water Tanks °" 10 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing. °" Installation of lifts, water pumps, Fire Fighting 11 Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical °" equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain ,st Hoitt Occupation / Completion Certificate t ~~ ·...r .J' r- ~l~'f~:~U ~ *1,""v, ~ r,rnt~~ ~* 1 A, DR. DAMJI SADAN, A S. GAWDE MARG, RA/GAD CHOW/(, GHATKOPAR (E), MUMBAI 400077, (OFF.}+9199306 39636, (DIR} +919870199673, EMAIL: vbqrch@amo/1,com. vba.studlo@qmall.com WEB SITE: www.vbaarchitects.in l ( I VB+A vlve k bho sal e as so cia tes arc hit ec ts+ Inte rior desi gne rs TABLE-B Internal and External Developmen t Works In respect of the entire Project Proposed Percentage Details Sr.No. Common Areas and Fadlltles Amenities Yes/No Work Done (4) (5) (1) (2) . (3) NO 0% NIL 1 Intern al Road & Foot Paths YES 0% Connection to be Taken 2 Water Supply From MCGM YES 0% Only Intern al Sewerage 3 Sewerage (chamber, Line to be laid lines,Septic Tank,STP). - YES 00-' Intern al Strom Water 4 Storm Water Drains drain to be made YES 0% Tree Planting As per 5 Landscape / Tree Planting. Requirement of MCGM NO 0% NIL 6 Street Lighting NO 0% NIL 7 Comm unity Buildings NO 0% NIL 8 Treatm ent and disposal of sewage and sullage water. 9 Solid Waste management & YES 0% NIL Disposal 10 Water Conservation, Rain YES 0% NIL Water Harvesting Energy management NO 0% NIL 11 12 Fire protec tion and YES 0% As Per Requirement of fire safety requirements Chief Fire Office r 13 Electrical Meter Room, Yes 0% Only Electrical Meter Substation, Receiving Room Station 14 Other Option &More NO NO NIL Yours Truly, i.µ /,1 ,~~ Vlvek Bhosale: Architect CO\ Recd. No. CA/11XJ7/39636 For, M/s. VIV£I( BHOSALE ASSOCIATES Aareed 1nd Accepted by Mr. Dlnesh R. Purohlt (Promotar / Developer) For, M/s.M1kwlse Homes LLP GHATKOPAR (E), MUMBAI 400077, 1 A, DR. DAMJ/ SADAN, A. S. GA WOE MARG, RA/GAD CHOWK, 91993 EMAIL: vbarch@amaJl.com. vba.stydlo@qmail.com WEB SITE: www.vbaarchitects.in (OFF.)+ 06 39636, (DIR} +919870199673,