VB+/\ vlvek bhosale associates architects+ Interior designers 'FORM 1' ARCHITECT'S CERTIFICATE 081"July,2025 To, M/s. Makwise Homes LlP B/ 902, Lords CHS. Ltd. Plot no. 35 /35A, Sector 15, CBD Belapur, Navi Mumbai 400 614 Subject: Certificate of Percentage of Completion of Construction Work of •Anuvidnyan Nagar Co. Op. Housing Society Ltd." Composite Building, comprising of Two Wings 'A'&'B'on Plot bearing Survey No. 141 (Pt), CTS No. 178(pt), 179 (pt.), 174 (pt.), Village Mankhurd, Near Datta Mandir, Agarwadi, M/East Ward, Mankhurd, Mumbai- 400088.Demarcated by its boundaries, (latitude and longitude of the end points of plot) 19°o2'53.71"N,72°SS'31.48"Eto the East (18.30 Mt. Wide Agarwadi Rd.),19°02'55.42"N,72°SS'31.93"Eto theNorth (Railway Boundary),19°02'56.62"N,72°SS'31.0S"Eto the West (Nallaside), 19°o2'54.47"N,n°SS'29.67"Eto the South (Prop. D.P. Rd.)of Division Konkan, villageMankhurd ,Taluka Kurla District MumbaiSuburban, PIN400088, Admeasuring Plot area 3631.70 Sq. Mt.having MahaRERA Registration Number : P51800053906, Being developed byM/s. Makwise Homes LLP Sir, I Architect Vivek Bhosale of M/s. Vivek Bhosale Assoclateshave undertaken assignment as Architect for certifying Percentage of Completion of Construction Work of Building, comprising of Two Wings 'A'&'B' on Plot bearing Survey No. 141 (Pt), CTS No. 178(pt), 179 (pt.), 174 (pt.), Village Mankhurd, Near Datta Mandir, Agarwadi, M/East Ward, Mankhurd, Mumbai- 400088. Admeasuring Plot area 3631.70 Sq. Mt., being developed byM/s. Makwise Homes LlP 1. Following Technical Professionals are appointed by Promoter : {I) Ar.Vivek Bhosale of M/s. Vlvek Bhosale Assoclatesas the Architects (II) Er. Samarth P. Agarwal of M/s. Adharshlla consultants as the Structural Consultant. {Ill) Er. Kanhalya Yadav, M/s. KY MEP Consultants as the MEP Consultant. {Iv) Er. Sachln s. Yadavas the Site Supervisor Based on Site Inspection, with respect to each of the Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the Wings of the Real Estate Project Is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. 1 A, DR. DAMJ/ SADAN, A. S. GAWDE MARG, RA/GAD CHOWK, GHATKOPAR (E), MUMBAI 400077, (OFF.)+91 99306 39636, {DIR} +91 9870199673, EMAIL: vbarch@qmoil.com, vbo.studio@qmoll.com WEB SITE: www.vboorchltects.in VB+/\ vlvek bhosale associates architects+ Interior designers TABLE-A (For Wing "An) Sr. No. Tasks / Activity Percentage of Work done (1) (2) (3) 1 Excavation 100% 2 Basement (Pit Parking) 100% 3 Plinth 100% 4 Podium NIL 5 Stilt Floor 100% 6 Fifteen (15) Number of Slabs of Super Structure 56%(8th floor Slab Completed) 7 Internal Walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises. 8 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises 9 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts,Overhead and Underground Water Tanks 10 The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing. 11 Installation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation/ Completion Certificate 1 A, DR. 0AMJI SADAN, A. S. GAWDE MARG, RA/GAD CH0WK, GHATK0PAR {E), MUMBAI 400077, {0FF.)+919930639636, {DIR} +91 9870199673, EMAIL: vborch@qmoll.com, vbo.studio@qmoil.com WEB SITE: www.vboorchltects.in _J VB+/\ vlvek bhosale associates architects+ Interior designers TABLE-A (For Wing "B") Sr. No. Tasks / Activity Percentage of Work done (1) (2) (3) 1 Excavation 100% 2 Basement (Pit Parking) 100% 3 Plinth 100% 4 Podium NIL 5 Stilt Floor 100% 6 Fifteen (15) Number of Slabs of Super Structure 56%(8th floor Slab Completed) 7 Internal Walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises. 8 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises 9 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts,Overhead and Underground Water Tanks The external plumbing and external plaster, 10 elevation, completion of terraces with waterproofing of the Building/Wing. °" Installation of lifts, water pumps, Fire Fighting 11 Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical °" equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate l A, DR. DAMJI SADAN, A. S. GAWDE MARG, RA/GAD CHOWK, GHATKOPAR (E), MUMBAI 400077, (OFF.)+91 99306 39636, {DIR) +919870199673, EMAIL: vborch@gmail.com, vba.studio@qmail.com WEB SITE: www.vboarchitects.in VB+A vlvek bhosale associat es architects+ Interior designers TABLE-8 Internal and External Development Works In respect of the entire Project Sr.No. Common Areas and Proposed Percentage Details Facilities Amenities Yes/No Work Done (1) (2) (3) (4) (5) 1 Internal Road & Foot Paths NO 0% NIL 2 Water Supply YES 0% Connection to be Taken From MCGM 3 Sewerage (chamber, YES 0% Only Internal Sewerage lines,SepticTank,STP). Line to be laid - 4 Storm Water Drains YES 0% Internal Strom Water drain to be made 5 Landscape/ Tree Planting. YES 0% Tree Planting As per Requirement of MCGM 6 Street Lighting NO 0% NIL 7 Community Buildings NO 0% NIL 8 Treatment and disposal of NO 0% NIL sewage and sullage water. 9 Solid Waste management & YES 0% Nil Disposal 10 Water Conservation, Rain YES 0% NIL Water Harvesting 11 Energy management NO 0% NIL 12 Fire protection and YES 0% AsPer Requirement of fire safety requirements Chief Fire Officer 13 Electrical Meter Room, Yes 0% Only Electrical Meter Substation, Receiving Room Station 14 Other Option &More NO NO NIL ~-,,S:::: ... Yours Truly, ~\':>~~VAi~ ~~ ~ -...........-- - VIVEK .................. ........~·- ~I ~l~ u:a RAGHUNATH ............................. .,._ ..,... ... _, /cJ \~ BHOSALE +'\:._)0,- ,* _ Vlvek Bhosale: Architect COA Regct No. CA/2007/396'36 o<:o\O ,, ~v, MUii~~ For, M/s. VIVEK BHOSALE ASSOCIATES Agreed and Accepted by Mr. Dlnesh R. Purohit (Promoter/ Developer) For, M/s.Makwlse Homes LLP 1 A, DR. DAMJI SADAN, A. S. GAWDE MARG, RA/GAD CHOWK, GHATKOPAR (E), MUMBAI 400077, (OFF.)+91 99306 39636, (DIR} +91 9870199673, EMAIL: vbarch@gmall.com, vba.stud/o@qmail.com WEB SITE: www.vbaardlitects.in