VB+/ \ vlvek bhosa le asso ciate s architects+ Interior designe rs 'FORM 1' ARCHITECT'S CERTIFICATE 5th March, 2025 To, M/s. Makwise Homes UP B / 902, Lords CHS. Ltd. Plot no. 35 /35A, Sector 15, CBD Belapur, Navi Mumbai 400 614 Subject: Certificate of Percentage of Completion of Construction Work of "Anuvidnyan Nagar Co. Op. Housing Society Ltd." Composite Building, comprising of Two Wings 'A'&'B' on Plot bearing Survey No. 141 (Pt), CTS No. 178(pt), 179 (pt.), 174 (pt.), Village Mankhurd, Near Datta Mandir, Agarwadi, M/East Ward, Mankhurd, Mumbai- 400088.Demarcated by its boundaries, (latitude and longitude of the end points of plot) 19°02'53.71"N,72°SS'31.48"Eto the East (18.30 Mt. Wide Agarwadi Rd.),19°02'55.42"N,72°55'31.93"Eto the North (Railway Boundary),19°02'56.62"N,72°SS'31.0S"Eto the West (Nalla side), 19°02'54.47"N,72°55'29.67"Eto the South (Prop. D.P. Rd.)of Division Konkan, village Mankhurd ,Taluka Kurla District Mumbai Suburban, PIN400088, Admeasuring Plot area 3631.70 Sq. Mt. having MahaRERA Registration Number: P51800053906, Being developed by M/s. Makwise Homes LLP Sir, I Architect Vivek Bhosale of M/s. Vivek Bhosale Associates have undertaken assignment as Architect for certifying Percentage of Completion of Construction Work of Building, comprising of Two Wings 'A'&'B' on Plot bearing Survey No. 141 (Pt), CTS No. 178(pt), 179 (pt.), 174 (pt.), Village Mankhurd, Near Datta Mandir, Agarwadi, M/East Ward, Mankhurd, Mumbai- 400088. Admeasuring Plot area 3631.70 Sq. Mt., being developed by M/s. Makwise Homes UP 1. Following Technical Professionals are appointed by Promoter: (i) Ar. Vivek Bhosale of M/s. Vivek Bhosale Associates as the Architects (ii) Er. Samarth P. Agarwal of M/s. Adharshila Consultants as the Structural Consultant. (iii) Er. Kanhaiya Yadav, M/s. KY MEP Consultants as the MEP Consultant. (Iv) Er. Sachin S. Yadav as the Site Supervisor Based on Site Inspection, with respect to each of the Wing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the Wings of the Real Estate Project is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. 1 A, on. DAMJ/ SADAN, A. 5. GAWDE MAnG, RA/GAD CHOWK, GHATKOPAR (E), MUMBAI 400077, (OFF.)~ 91 99306 39636, (Din) +91 9870199673, EMAIL· vbnrrlJ@qmall.com. v!m.:.ili!..rllo@qmail.com WEB SITE www.vbao VB+/\ vlvek bhosale associates architects+ Interior designers TABLE-A (For Wing "A") Sr. No. Tasks / Activity Percentage of Work done (1) (2) (3) 1 Excavation 100% 2 Basement {Pit Parking) 100% 3 Plinth 100% 4 Podium Nil 5 Stilt Floor 100% 6 Fifteen (15) Number of Slabs of Super Structure 21% {3rd Floor Slab Completed) 7 Internal Walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises. 8 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises 9 Staircases, lifts Wells and Lobbies at each Floor level 0% connecting Staircases and lifts, Overhead and Underground Water Tanks 10 The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing. 11 Installation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate 1 A, OIi. DAMJ/ SADAN, A. S. GAWDE MARG, RA/GAD CHOWK, GHATKOPAR (E), MUMBAI 400077, (OFF.)+919930639636, (DIR) +91 9870199673, EMAIL: ybgrch@gmail.com, vba.sturl/o@gmgll.com WEB SITE: www.vbaarchitects.in VB+/\ vlvek bhosale associates architects+ Interior designers TABLE-A (For Wing "B") Sr. No. Tasks/ Activity Percentage of Work done (1) (2) (3) 1 Excavation 100% 2 Basement (Pit Parking) 100% 3 Plinth 100% 4 Podium NIL 5 Stilt Floor 100% 6 Fifteen (15} Number of Slabs of Super Structure 21% (3rd Floor Slab Completed) 7 Internal Walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises. 8 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises 9 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts, Overhead and Underground Water Tanks 10 The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing. 11 Installation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation/ Completion Certificate 1 A, OR. DAMJ/ SADAN, A. S. GAWO[ MARG, RA/GAO CHO WK, GHA TKO PAR {E), MUMBAI 4 {OFF.)+91 99306 39636, (DIR) +91 9870199673, EMAIL. vharch@qmnil.rom, vbn.styd1o@qmoil.com WEB SITE· 1 VB+/\ vlvek bhosale associates architects+ Interior designers TABLE-8 Internal and External Development Works in respect of the entire Project Sr.No. Common Areas and Facilities Proposed Percentage Details Amenities Yes/No Work Done (1) (2) (3) (4) (S) 1 Internal Road & Foot Paths NO 0% NIL 2 Water Supply YES 0% Connection to be Taken From MCGM 3 Sewerage (chamber, lines, YES 0% Only Internal Sewerage Septic Tank, STP). Line to be laid - 4 Storm Water Drains YES 0% Internal Strom Water drain to be made 5 Landscape/ Tree Planting. YES 0% Tree Planting As per Requirement of MCGM 6 Street Lighting NO 0% NIL 7 Community Buildings NO 0% NIL 8 Treatment and disposal of NO 0% NIL sewage and sullage water. - 9 Solid Waste management & YES 0% NIL Disposal 10 Water Conservation, Rain YES 0% NIL Water Harvesting 11 Energy management NO 0% NIL 12 Fire protection and YES 0% As Per Requirement of fire safety requirements Chief Fire Officer 13 Electrical Meter Room, Yes 0% Only Electrical Meter Substation, Receiving Station Room 14 Other Option &More NO - NO NIL Yours Truly, __ '.¾{·,'i- HO~ i~~~ ::=~-- VIVEK RAGHUNATH _,..... ___ Dinesh Digitally signed ----- -- ,___ • :<' BHOSALE by Dinesh Tulshi Tulshi Ram Purohit Vivek Bhosale: Architect COA Regd. No. CA/2007/39636 * ~ , "1-41!/ M\l~'Q Ram Date: 2025.03.07 16:13:45 +05'30' For, M/s. VIVEK BHOSALE ASSOCIATES Purohit Agreed and Accepted by Mr. Dinesh R. Purohlt (Promoter/ Developer) For, M/s. Makwise Homes LLP 1 A, DR. DAMJI SADAN, A. S. GAWDE MARG, RA/GAD CHOWK, GHATKOPAR {E), MUMBAI 400077, {OFF.}+91 99306 39636, {DIR) +91 9870199673, EMAIL: vbarch@gmqil.com. vba.studlo@qmail.com WEB SITE: www.vbaorchitects.in