VB+/\ vlvek bhosale associates architects+ Interior designers 'FORM 1' ARCHITECT'S CERTIFICATE 3rd, October, 2024 To, M/s. Makwise Homes LLP B / 902, Lords CHS. Ltd. Plot no. 35 /35A, Sector 15, CBD Belapur, Navi Mumbai 400 614 Subject:Certificate of Percentage of Completion of Construction Work of "Anuvidnyan Nagar Co. Op. Housing Society Ltd." Composite Building, comprising of Two Wings 'A'&'B'on Plot bearing Survey No. 141 (Pt), CTS No. 178(pt), 179 (pt.), 174 (pt.), Village Mankhurd, Near Datta Mandir, Agarwadi, M/East Ward, Mankhurd, Mumbai- 400088.Demarcated by its boundaries, (latitude and longitude of the end points of plot) 19°02'53.71"N,72°SS'31.48"Eto the East (18.30 Mt. Wide Agarwadi Rd.),19°02'55.42"N,72°SS'31.93"Eto theNorth (Railway Boundary),19°02'56.62"N,72°SS'31.0S"Eto the West (Nallaside), 19°02'54.47"N,72°SS'29.67"Eto the South (Prop. D.P. Rd.)of Division Konkan, villageMankhurd ,Taluka Kurla District MumbaiSuburban, PIN400088, Admeasuring Plot area 3631.70 Sq. Mt.having MahaRERA Registration Number : P51800053906, Being developed byM/s. Makwise Homes LLP Sir, I Architect Vivek Bhosale of M/s. Vivek Bhosale Associateshave undertaken assignment as Architect for certifying Percentage of Completion of Construction Work of Building, comprising of Two Wings 'A'&'B' on Plot bearing Survey No. 141 (Pt), CTS No. 178(pt), 179 (pt.), 174 (pt.), Village Mankhurd, Near Datta Mandir, Agarwadi, M/East Ward, Mankhurd, Mumbai- 400088. Admeasuring Plot area 3631.70 Sq. Mt., being developed byM/s. Makwise Homes LLP 1. Following Technical Professionals are appointed by Promoter: (i) Ar.Vivek Bhosale of M/s. Vivek Bhosale Associatesas the Architects (ii) Er. Samarth P. Agarwal of M/s. Adharshlla Consultants as the Structural Consultant. (iii) Er. Kanhaiya Yadav, M/s. KY MEP Consultants as the MEP Consultant. (iv) Er. Sachin S. Yadavas the Site Supervisor Based on Site Inspection, with respect to each of the Wing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the Wings of the Real Estate Project is as per table A herein below. The percentage of the work exe.B11tetl~ with respect to each of the activity of the entire phase is detailed in Table B. ~,st ,.,,~~ ~ ~~)~ I ,_ :1 1 A, DR. DAMJI SADAN, A. S. GAWDE MARG, RA/GAD CHOWK, GHATKOPAR (E}, MUMBAI 400077, ~'.s:// (OFF.}+9199306 39636, {DIR} +919870199673, EMAIL: vbarch@qmall.com, vba.studio@qmail.com WEB SITE: www.vbaarch, ~~~ -~ VB+/\ vlvek bhosale associates architects+ Interior designers TABLE-A (For Wing "A") Sr. No. Tasks/ Activity Percentage of Work done (1) (2) (3) 1 Excavation 100% 2 Basement (Pit Parking) 100% 3 Plinth 100% 4 Podium NIL 5 Stilt Floor 0% 6 Fifteen (15) Number of Slabs of Super Structure 0% 7 Internal Walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises. 8 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises 9 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts,Overhead and Underground Water Tanks 10 The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing. 11 Installation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate -=-- 1 A, OR. DAMJI SADAN, A. S. GA WOE MARG, RA/GAD CHO WK, GHATKOPAR (E), MUMBAI 400077, (OFF.}+91 99306 39636, (DIR) +91 9870199673, EMAIL: vbarch@qmail.com. vba.studio@gmail.com WEB SITE: www.vbaarchltects.in VB+/\ vlvek bhosale associa tes architects+ Interior designers TABLE-A (For Wing "B") Sr. No. Tasks/ Activity Percentage of Work done (1) (2) (3) 1 Excavation 100% 2 Basement (Pit Parking) 100% 3 Plinth 100% 4 Podium NIL 5 Stilt Floor 0% 6 Fifteen (15) Number of Slabs of Super Structure 0% 7 Internal Walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises. 8 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises 9 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts, Overhead and Underground Water Tanks 10 The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing. 11 Installation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and --- all other requirements as may be required to obtain ST-- HJ, Oc upatlon / Completion Certificate 1,~~ I -\ ·:·~ q:: ' ::I ·~jv ,. J '1 1 A, DR. DAMJI SADAN, A. S. GAWDE MARG, RA/GAD CHOWK, GHATKOPAR (E), MUMBAI 400077, ~=~.1,' ~ ,.,,,,,, ··-X" (OFF.)+919930639636 , (DIR) +91 9870199673, EMAIL: vbarch@qmail.com, vba.studio@qmail.com WEB SITE: www.vbaarchiteets.in VB+ /\ vlve k bho sale ass oci ate s architects+ Inter ior desig ners TABLE-B Internal and External Develop ment Works in respect of the entire Project Proposed Percentage Details Sr.No. Common Areas and Facilities Amenities Yes/No Work Done (3) (4) (5) (1) (2) NO 0% NIL 1 Internal Road & Foot Paths YES 0% Connection to be 2 Water Supply Taken From MCGM YES 0% Only Internal Sewerage 3 Sewerage (chamber, Line to be laid lines,SepticTank,STP). - YES 0% Internal Strom Water 4 Storm Water Drains drain to be made YES 0% Tree Planting As per 5 Landsc ape/ Tree Planting. Require ment of MCGM Street Lighting NO 0% NIL 6 Commu nity Buildings NO 0% NIL 7 8 Treatm ent and disposal of NO 0% NIL sewage and sullage water. - 9 Solid Waste manage ment & YES 0% NIL Disposal 10 Water Conservation, Rain YES 0% NIL Water Harvesting 11 Energy manage ment NO 0% NIL 12 Fire protecti on and YES 0% AsPer Require ment of fire safety requirem ents Chief Fire Officer 13 Electrical Meter Room, Yes 0% Only Electrical Meter Substation, Receiving Station Room 14 Other Option &More NO NO NIL Yours Truly, hosale: Architect COA R gd. No. CA/2007/39636 For M/s. VIVEK BHOSALE ASSOCIATES Agreed and Accepte d by Mr. Dinesh R. Purohit (Promoter/ Developer) For, M/s.Makwise Homes LLP MUMBAI 400077, 1 A, DR. DAMJ/ SADAN, A. S. GAWDE MARG, RA/GAD CHOWK, GHATKOPAR (E), 3, EMAIL: vbarch@q mail.com. vba.studio @qmail.co m WEB SITE: www.vbaarchitects.in (OFF.)+91 99306 39636, (DIR) +91 987019967