‘FORM 1’ ARCHITECT’S CERTIFICATE (As on 31/12/2023) Date 06.03.2024 To, M/s. Makwise Homes LLP B / 902, Lords CHS. Ltd. Plot no. 35 /35A, Sector 15, CBD Belapur, Navi Mumbai 400 614 Subject: Certificate of Percentage of Completion of Construction Work of “Anuvidnyan Nagar Co. Op. Housing Society Ltd.” Composite Building, comprising of Two Wings ‘A’ & ‘B’ on Plot bearing Survey No. 141 (Pt), CTS No. 178(pt), 179 (pt.), 174 (pt.), Village Mankhurd, Near Datta Mandir, Agarwadi, M/East Ward, Mankhurd, Mumbai‐ 400088. Demarcated by its boundaries, (latitude and longitude of the end points of plot) 190 02’53.71”N, 720 55’31.48”E to the East (18.30 Mt. Wide Agarwadi Rd.), 190 02’55.42”N, 720 55’31.93”E to the North (Railway Boundary), 190 02’56.62”N, 720 55’31.05”E to the West (Nalla side), 190 02’54.47”N, 720 55’29.67”E to the South (Prop. D.P. Rd.) of Division Konkan, village Mankhurd ,Taluka Chembur, District Mumbai Suburban, PIN 400088, Admeasuring Plot area 3631.70 Sq. Mt. having MahaRERA Registration Number : P51800053906, Being developed by M/s. Makwise Homes LLP Sir, I Architect Vivek Bhosale of M/s. Vivek Bhosale Associates have undertaken assignment as Architect for certifying Percentage of Completion of Construction Work of Building, comprising of Two Wings ‘A’ & ‘B’ on Plot bearing Survey No. 141 (Pt), CTS No. 178(pt), 179 (pt.), 174 (pt.), Village Mankhurd, Near Datta Mandir, Agarwadi, M/East Ward, Mankhurd, Mumbai‐ 400088. Admeasuring Plot area 3631.70 Sq. Mt., being developed by M/s. Makwise Homes LLP 1. Following Technical Professionals are appointed by Promoter : (i) Ar. Vivek Bhosale of M/s. Vivek Bhosale Associates as the Architects (ii) Er. Samarth P. Agarwal of M/s. Adharshila Consultants as the Structural Consultant. (iii) Er. Kanhaiya Yadav, M/s. KY MEP Consultants as the MEP Consultant. (iv) Er. Sachin S. Yadav as the Site Supervisor Based on Site Inspection, with respect to each of the Wing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the Wings of the Real Estate Project is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. 1 A, DR. DAMJI SADAN, A. S. GAWDE MARG, RAIGAD CHOWK, GHATKOPAR (E), MUMBAI 400077, (OFF.)+91 99306 39636, (DIR) +91 98701 99673, EMAIL: vbarch@gmail.com, vba.studio@gmail.com WEB SITE: www.vbaarchitects.in TABLE‐A (For Wing “A”) Sr. No. Tasks / Activity Percentage of Work done (1) (2) (3) 1 Excavation 50 % 2 Basement 0% 3 Plinth 0% 4 Podium NIL 5 Stilt Floor 0% 6 Twenty First (21st) Number of Slabs of Super 0% Structure 7 Internal Walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises. 8 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises 9 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts, Overhead and Underground Water Tanks 10 The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing. 11 Installation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate 1 A, DR. DAMJI SADAN, A. S. GAWDE MARG, RAIGAD CHOWK, GHATKOPAR (E), MUMBAI 400077, (OFF.)+91 99306 39636, (DIR) +91 98701 99673, EMAIL: vbarch@gmail.com, vba.studio@gmail.com WEB SITE: www.vbaarchitects.in TABLE‐A (For Wing “B”) Sr. No. Tasks / Activity Percentage of Work done (1) (2) (3) 1 Excavation 0% 2 Basement 0% 3 Plinth 0% 4 Podium NIL 5 Stilt Floor 0% 6 Fifteen (15) Number of Slabs of Super Structure 0% 7 Internal Walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises. 8 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises 9 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts, Overhead and Underground Water Tanks 10 The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing. 11 Installation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate 1 A, DR. DAMJI SADAN, A. S. GAWDE MARG, RAIGAD CHOWK, GHATKOPAR (E), MUMBAI 400077, (OFF.)+91 99306 39636, (DIR) +91 98701 99673, EMAIL: vbarch@gmail.com, vba.studio@gmail.com WEB SITE: www.vbaarchitects.in TABLE‐B Internal and External Development Works in respect of the entire Project Sr. Common Areas and Facilities Proposed Percentage Details No. Amenities Yes/No Work Done (1) (2) (3) (4) (5) 1 Internal Road & Foot Paths NO 0% NIL 2 Water Supply YES 0% Connection to be Taken From MCGM 3 Sewerage (chamber, lines, YES 0% Only Internal Sewerage Septic Tank, STP). ‐ Line to be laid 4 Storm Water Drains YES 0% Internal Strom Water drain to be made 5 Landscape / Tree Planting. YES 0% Tree Planting As per Requirement of MCGM 6 Street Lighting NO 0% NIL 7 Community Buildings NO 0% NIL 8 Treatment and disposal of NO 0% NIL sewage and sullage water. ‐ 9 Solid Waste management & YES 0% NIL Disposal 10 Water Conservation, Rain YES 0% NIL Water Harvesting 11 Energy management NO 0% NIL 12 Fire protection and YES 0% As Per Requirement of fire safety requirements Chief Fire Officer 13 Electrical Meter Room, Yes 0% Only Electrical Meter Substation, Receiving Station Room 14 Other Option & More NO NO NIL Yours Truly, Digitally signed by VIVEK RAGHUNATH BHOSALE VIVEK RAGHUNATH DN: c=IN, o=PERSONAL, title=3242, pseudonym=cb2e3a83dd914e40b3bd0cc8b3a412b2, 2.5.4.20=0478f4ccee1ad0ca121321ba509a2f14a319e5714fa8689 BHOSALE 6e0dbf5097e7eed17, postalCode=400089, st=Maharashtra, serialNumber=451193e9a71631724e05cfee6311bc479d7e54021 5f74f3d071282899de85c02, cn=VIVEK RAGHUNATH BHOSALE Date: 2024.03.11 15:15:57 +05'30' Digitally signed by DINESH TULSHI RAM PUROHIT Ar. Vivek Bhosale: Architect DINESH TULSHI DN: c=IN, o=PERSONAL, title=3285, pseudonym=aee4aa575690448c8c449488bc455e65, 2.5.4.20=bd271b63b384346444ef30e0acb118140177673e00f da68038c50a7669ff8726, postalCode=410210, RAM PUROHIT st=Maharashtra, COA Regd. No. CA/2007/39636 serialNumber=bf3bbc2d774568bcfe105550efc1f8291102dd6 2e1e1ee93be525a0371ef4258, cn=DINESH TULSHI RAM PUROHIT For, M/s. VIVEK BHOSALE ASSOCIATES Date: 2024.03.11 15:17:27 +05'30' Agreed and Accepted by Mr. Dinesh R. Purohit (Promoter / Developer) For, M/s. Makwise Homes LLP 1 A, DR. DAMJI SADAN, A. S. GAWDE MARG, RAIGAD CHOWK, GHATKOPAR (E), MUMBAI 400077, (OFF.)+91 99306 39636, (DIR) +91 98701 99673, EMAIL: vbarch@gmail.com, vba.studio@gmail.com WEB SITE: www.vbaarchitects.in