RAjENdRA V. Joshi CONSULTING ENGINEER Cell :9819379954 E-mail :rajendra_jsh@yahoo.com BMC Licence No. J/131/SS-I Address : 8/2, Sadguru Seva Sadan, Rajaji Road, Ramnagar, Dombivli (East) 421201. FORM-2A [See Regulation 3A.] ENGINEERS'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at the end of Financial Year) To, Date: 23-05-2025 The Godrej Properties Limited Vikhroli, Kurla, MumbaiSuburban, 400079 Quality Assurance Certificate (Certificate No. 04 for the Year Ending March 2025) Subject: Certificate for quality of materials used and quality of Construction and workmanship of the work of Godrej Sky Terraces having MahaRERA Registration Number P51800053882 being developed by Godrej Properties Limited Sir, VWe Rajendra VJoshi have undertaken an assignment of supervision of this real estate project Our Responsibility Tocarry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing andapplicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows: 1.Structural Design, Stability and Testing Sr. No. Parameters Yes/No Remarks 1 Whether soil investigations of the site has been Yes conducted before the structural design and soil parameters have been accounted for in the structural design/drawings? 2 Whether Structural Engineer has been appointed for Yes Name: Majid Hashmi the project? License No: STRWI219 |Mobile: 9505888871 E-mail: Whether the inspection registers, site order book majid.hashmi@kmhengineering.com Yes Concrete Pouring sheet maintained at and quality control test registers are maintained at site the site properly and endorsed by the ngineer-in Charge? |Whether testing facilities to check quality of material Yes CTM for Concrete Testing available at |isavailable at site? Site BMC Building S°pervisor Licence No. J/131/SS-I(Grade-I) R. V. JOSHI Sr. No. Parameters Yes/No Remarks Whether the statuary provisions for disaster Yes resistancelearthquake resistant design have been incorporated, specially in case of multi-storeyed construction? 6 Has suitabBe cognizance been taken on demarcated Yes |flood lines and appropriate precautions taken for protecting the site from flooding considering local |flooding issues? 2. Input Materials Sr. No. Parameters Yes/No Remarks |Whether the following building materials confim to Yes relevant lIS/BSINBC Code, or as per Industry |Standards? If yes, provide details: (a)Cement, concrete arnd coarse aggregate Yes (b) Steel and its alloys Yes (c) Electrical wire, fitings and accessories Yes (d) Plumbing and sanitary fittings Yes 2 Whether regular tests of materials and construction Yes Building construction materials are being products are being done from accredited labs also? tested at NABL accredited labs like |Ifyes, details of such labs Bureau eritas, GVM Test House, Spectro, Durocrete, etc. Whether manufacturer test certificate for cement, Yes steel, pipes etc. have been obtained and whether |supply records are being maintained? 4 |Whether suitable water is being used for Yes construction? O What is the source of water? Yes Ground water tested as per IS 456:2016 for construction water. (ii) Has water been tested and approved by Yes Engineer-in-Charge before construction? (Gü) Has water been tested subsequently as per Yes requirement? 3.Quality of Workmanshlp Sr. No. Parameters Yes/No Remarks Whether works of all the electrical Yes Activity Yet to Start, but considered in wiring/connections/Mift installation/other electrical Design installations have been carried out under authorized/registered electricalengineer and whether records of the same has been maintained? 2 Whether all related works of plumbing &sanitary Yes Activity Yet to Start, but considered in |including installation of water supply systems, Design |drainage systens, sewage systerms, sinks, toilets etc. have been carried out under |authorized/registered plunbers/sanitary contractors and whether records of the same has been maintained? 3 Whether all the work is being carried out under Yes supervision of experienced and skilled professional? Further, whether the workmanship and quality is BMC Building S°pervisor Licence No. satisfactory and up to the mark and the work is within the acceptable and permissible limits of J131/SS- (Grade-1) deviations as per relevant Code of Practice? R. V. JOSHI Sr. No. Parameters Yes/No Remarks 4 Whether remedial measures are undertaken to Yes Active waterproofing in being done from prevent dampness and leakages? lf yes, provide positive side with materials tested and details approved at third-party labs. 5 Whether safety precautions are undertaken during Yes construction activities for all type of workers? 4. Miscellaneous Sr. No. Parameters Yes/No No Whether third party quality inspection is being Yes Quarterty third-party quality audits by carried out on site during/after completion of the Bureau Veritas. |works? If yes, provide details. 2 Whether ant-termite treatment has been undertaken Yes Activity yet to start, but considered in for the soil? Design Whether fire-fighting arrangements has been Yes Activity yet to start, but considered in undertaken under supervision of fire consultant? |Design 4 |Whether proper signages have been installed on Yes Activity yet to start, but considered in |sitelcompletèd building as per requirement? Design 5 |Whether precautions are undertaken to avoid air Yes Smog guns, protective nets, metal pollution during construction? Please specify. barricades, AQl monitoring machines, etc. are beingused to control air pollution. 6 Whether records of all test reports/results have been Yes properly kept in the prescribed fommats and whether the sarme are available at site for viewing by allottees and tobe handed over to the association of allottees? 7 Whether allrelevant records including sanctioned Yes building plans, utility drawings, various test reports/results have been properly kept in the prescribed formats to be handed over to the association of allottees? |Any innovativelcost effectivelgreen technology has Yes Solar povwer energ efficient HVAC been used for improving quality/energy eficiency? |systems, energy efficient lighting, localy Please specify. sourced building materials, etc. Yours Faithfuly Signature of Engineer (Site Supervisor) Name: Rajendra Joshi License No. (if any): J/131/SS-1 Phone No: 9819379954 Place: Mumbai Agreed and accepted by BMC Buikding Supervisor Licence No. J/131/SS-I (Grade-l) R. V. JOSHI Signature of Promoter Name: Godrej Properties Limited Date: