Date : 03/10/2023 ARCHITECT'S /L.S. CERTIFICATE To, M/s. Gyan S.P. Developers L.L.P. 1 to 4, Shukla Bhavan, Mumbadevi Road, Tambakta, Mumbai : 400003. Subject: Certificate of Percentage of Completion of Construction Work of Sale Building no. 2 of the Project situated on the Plot bearing CTS No. 45 (Pt.), 48 and 48/1 to 37 of Village Majas Part 1, demarcated by its boundaries (latitude and longitude of the end points) 19 08 26.12N 72 51 05.94E, 19 08 31.07N 72 51 06.38E, 19 08 24.71N 72 51 07.43E, 19 08 25.75N 72 51 07.78E, 19 08 27.99N 72 51 08.50E, 19 08 26.92N 72 51 09.18E, 19 08 23.95N 72 51 09.25E, 19 08 26.08N 72 51 09.52E, 19 08 24.74N 72 51 09.66E of Village Majas Part 1, Taluka – Andheri, at Bandrekar wadi, Jogeshwari (East), Mumbai 400060 admeasuring 12041.50 sq. mts. area being developed by M/s. Gyan S.P. Developers L.L.P. Sir, I Shri. Rohit Dhiraj Patil have undertaken assignment as Licensed Surveyor of certifying Percentage of Completion of Construction Work of the Sale Building no. 2 of the Project, situated on the plot bearing CTS No. 45 (Pt.), 48 and 48/1 to 37 of Village Majas Part 1, Taluka – Andheri, at Bandrekar wadi, Jogeshwari (East), Mumbai:- 400060 admeasuring 12041.50 sq. mts. area being developed by M/s. Gyan S.P. Developers L.L.P. 1. Following technical professionals are appointed by Owner / Promoter: (i) Shri. Rohit Dhiraj Patil as License Surveyor of M/s. Architectural Concept. (ii) Shri. Achyut N. Watve as Structural Consultant. (iii) Mr. Randhir K. Bhilare as MEP consultant. (iv) Mr. Rahul B. Torne as License Plumber. (v) Shri. Kishor A. Patil as Site Supervisor. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number ______________________ under Maha RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Sale Building no. 2 Sr. Task / Activity Percentage No. of work done 1 Excavation 00% 2 Plinth 00% 3 00 number of Basement/Podiums NA 4 01 number of Stilt Floor 00% 5 23 number of Slabs of Super Structure 00% 6 Internal walls, Internal Plaster, Floorings within 00% Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 00% Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 00% connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, 00% completion of terraces with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Electrical fittings to 00% Common Areas, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B for Sale Building no. 2 Internal & External Development Works in Respect of the entire Registered Phase Sr. Common areas Proposed Percentage of Details No. and Facilities, (Yes/No) Work done Amenities 1 Internal Roads & YES 00% Foothpaths 2 Water Supply YES 00% 3 Sewerage (chamber, YES 00% lines) 4 Storm Water Drains YES 00% 5 Landscaping & Tree YES 00% Planting 6 Street Lighting NO NA 7 Community Buildings NO NA 8 Treatment and disposal YES 00% of sewage and sullage water 9 Solid Waste management YES 00% & Disposal 10 Water conservation, Rain YES 00% water harvesting 11 Energy management Yes 00% 12 Fire protection and fire Yes 00% safety requirements 13 Electrical meter room, YES 00% 14 Others (Parking Tower) YES 00% Yours Faithfully ROHIT Digitally signed by ROHIT DHIRAJ DHIRAJ PATIL Date: 2023.10.03 PATIL 12:40:48 +05'30' Shri. Rohit Dhiraj Patil (License No. P/0840000456/LS) M/s. Architectural Concept 802, C-2 Wing, Skyline Wealth Space, Oasis Complex, Premier road, Vidyavihar (W), Mumbai 400 086.