xlruec* fl'&i!". l1Arrh L{ ar,.t} ,U5r,f &,! t {qil j1._,5l\; ARCHITECTS FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE R/7905/2026/Rera13 22.07.2026. To Pranav Cons tructions Limited, (Formerly known as Pranav Constructions Private Limited) 1001, 10th Floor, DLH Park, S.V. Road Near MTNL, Goregaon West Mumbai - 400062 Subjech Certificate of Percentage of Completion of Conshuction Work of " Samrat CHSL' having MAHARERA Registration Number P5180005 3827 being developed by Pranav Constructions Limited. Sir, I/ We M/s. Rasik P. Hingoo Associates have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work. of "Samrat CHSL" having MAHARERA Registration Number P51,800053827 being developed by Pranav Constructions Limited. Based.on Site lnspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Projec! I certify that as on the date of this certificate, the Percentage of Work done for each of the buitding/Wingof the Real Estate Project under MAHARERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of.the entire phase is detailed in Table B. ..2. Table A Building /W^gNumber _ (to be prepared separately for each Building/Wing of the Project) Sr. No Tasks/Activity Percentage of work done L. Excavation 98% 2. 0 number of Basement(s) and L no. of Plinth and pit 95% parking 3. 0 number of Podiums 90% 4. Stilt Floor 100Yo 5. 13 nos of Slabs of Super Structure 100% 6. lnternal walls, Internal Plaster, Floorings 80% within Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 0% Electrical Fittings within the Flat/Premises 8. Staircases, Lifts Wells and Lobbies at each Floor 85% level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, 75% elevation, completion of terraces with waterproofing of the Building/Wing, L0. Installation of lifts, water Pumps, Fire Fighting 40% Fittings and Equipment as per CFO NOC, Electrical Fittings to Cornmon Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby /s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate ..3.. TABLE-B Internal & External Development Works in Respect of the entire Registered Phase Sr Common areas and Facilities, Amenities Proposed Percentage Details No. (Yes/ of Work No) done L Internal Roads & Footpaths No NA 2 Water Supply Yes 0% J Sewerage (chamber, lines, Septic Tank, STP) Yes 70% 4 Storm Water Drains Yes s% 5 Landscaping & Tree Planting Yes 0% 6 Street Lighting No NA 7 Community Buildings No NA 8 Treatment and disposal of sewage and No NA sullage water 9 Solid Waste management & Disposal Yes 10 Water conservation, Rain water harvesting Yes 0% 11 Energy Management No NA 72 Fire protection and fire safety requirements Yes 70% 73 Electrical meter room, sub-station, receiving Yes 5% station 14 Others (Option to Add more) Yes 0% 15 Aggregate Area of Recreational open Space Yes 0% Yours faithfully, RASIK PRABHUDA [i1ffi;,11t*** S HINGOO :,::is.f;#tr#ffi" RASIK P. HINGOO cA/84l838s FoT PRANAV C S LIMITED P."naT6.,Trhu, Managing Director MASIK P Otsrglr H[NG ARCHT?tcruRt I UREAN 0 0 ASS@GIATES I tHTtRtoR DEStGil I CONST*UCTTON il!&lilA6EMIHr t$* compliance@hingcoarchitects.com E +91-9930325775 I +91 A2-28724&4 * nrww.hingooa*chltects.com I 106, Pagriw Building Swami Vlvet