HINGOO Rasik P Hingoo Kinjal R Hingoo Samir R Hingoo Nirav R Hingoo BA,6 RA(n lfAr(h (USA) M.S CMr IUSA) ARCHITECTS 50+ yea6 of Architedurdl Excelleoce FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE R/1905/2026/F.eru12 11..04.2026. To Pranav Constructions Limited, (Formerly known as Pranav Constructions Private Limited) 1001, 10s Floor, DLH Park, S. V. Road Near MTNL, Goregaon West Mumbai - 400062 Subiect Certificate of Percentage of Completion of Construction Work of " Samlat CHSL" having MAHARERA Registration Number P51800053827 being developed by Pranav Constructions Limited. Sir, I/ We M/ s. Rasik P. Hingoo Associates have undertaken assignment as Architect / Licensed Surveyor of certifying Percentage of Completion of Construction Work of "samrat CHSL" having MAHARERA Registration Number P51800053827 being developed by Pranav Constructions Limited. Based on Site Inspection, with respect to Layout f each of the Building/Wing of the aforesaid Real Estate Projec! I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MAHARERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. ..2.. Table A Building / Wing Number _ (to be prepared separately for each Building/Wing of the Project) Sr. No Tasks/Activity Percentage of work done 1. Excavation 90y. , 0 number of Basement(s) and 1 no. of Plinth and pit 957o parking 3. 0 number of Podiums NA 4. Stilt Floor 1007o 5. 13 nos of Slabs of Super Structure 100% 6. Internal wall+ Internal Plaster, Floorings 65% within Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 07o Electrical Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor 8O7o level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9. The external plumbing and external plaster, 55v, elevatiorl completion of terraces with waterproofing of the Building/ Wing, 10. Irstallation of lifts, water pumps, Fire Fighting 15% Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRz NOC, Finishing to entrance lobby / s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate J. -:3:- TABLE-B the entire Registered Internal & External Development Works in Respect of Phase Proposed Percentage Details Sr. Common areas and Facilities, Amenities (Yes/ of Work No. No) done ths No NA 1 Internal Roads & Foo Yes 0% 2 Water SupplY Yes 0% 3 S"*".ug" (chamber,lines, Septic Tank, STP) Yes 07o 4 Storm Water Drains Yes 0% 5 Landsca 1n & Tree Plan No NA 6 Street Li tin No NA 7 Communi Buildin NA 8 Treatment and disPosal of sewage and No sulla water No NA 9 Solid Waste mana ment & Yes 0% 10 Water conservation, Rain water harvesting ent No NA 11 on and hr e safety r equlre mentS Yes 0% 12 F lre pr o tecti Yes 0% 13 Electrical meter room, sub-station, rec ervlng station tion to Add more Yes oy. 1.4 Others te Area of Recreational S Yes 0% 15 A e Yours faithfullY, RASIK PRABHUDAffi:: S HTNGOO =::i;;r- RASIKP. HINGOO cN84/838s A e and e d FoT PRANAV CONSTRU LIMITED c oo r Mumbai Kiran Ashar Managing Director t o ASIKI P HING@@ ARCHITECTURE l lNrrRlot URBAN DES|6 oEslGN I SS @GIATES CON'TRUCNON MANAGEUENT a!. complhnce@hlnSooardlhects'€om r': +91-9930325'5 | +91-22-2A724&4 S w\.$rr.hintooardtheds"€om Goretaon w€sq Mumbal - 4OO104 I tOe, eagrav BulldinB $vaml vlvekarEnda Road' Next to Patkar Collete,