t HINGSO Rasik P Hingoo R rdl Samir R HinSoo u' rdt rusA) M.5 Civil(UtA) Fts: ARCHITECTS FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE R/19O5/2025/Reralo 18.10.2025 To Pranav Constructions Limited, (Formerly known as Pranav Constructions Private Limited) 1001, 10th Floor, DLH Park, S. V. Road Near MTNL, Goregaon West Mumbai- 4fiX)62 Subject Certificate of Percentage of Completion of Construction Work of "samrat CHSL" having MAHARERA Registration Number P51800053827 being developed by Pranav Constructions Lirnited' Sir, l/ We M/l Rasik P. Hingoo Associates have undertaken assignment as Architect / Licensed Surveyot of certifying Percentage of Completion of Construction Work of "samrat CHSL" having MAHARERA Registration Number P51800053827 being developed by Pranav Constructions Limited. Based on Site Inspection, with resPect to Layott / each of the Building/Wing of the aforesaid Real Estate Prolect, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the ReaI Estate Project under MAHARERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. 2. Table A Building /Wing Number _ (to be prepared separately for each Building/ Wing of the Project) Sr. No Tasks/Activity Percentage of work done 1. Excavation 90% , 0 number of Basement(s) and 1 no. of Plinth and pit 95% parking J. 0 number of Podiums NA 4. Stilt Floor 100% 5. 16 nos of Slabs of Super Structure 100% 6, Intemal walls, Intemal Plaster, Floorings 50% within Flats/Premises, Doors and Windows to each of the Flat/Premises 7. Sanitary Fittings within the Flat/Premises, 07o Electrical littings within the Flat/Premises 8. Staircases, Lifts Wells and Lobbies at each Floor 70"/. level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, 5% elevatiorL completion of terraces with waterproofing of the Building/ Wing, 10. lnstallation of Iifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CIO NOC, Electrical Fittings to Comrron Areas, electro, mechanical equipment, Compliance to conditions of environment/CRz NOC, Finishing to entrance lobby / s, plinth protectio& paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate J. -:3:- TABLE-B Internal & External Development Works in Respect of the entire Registered Phase Sr. Common areas and Facilities, Amenities Proposed Percentage Details No. (Yes/ of Work No) done 1 Intemal Roads & Footpaths No NA 2 Water Supply Yes 0% 3 Sewerage (chamber, lines, Septic Tank, STP) Yes 0y, 4 Storm Water Drains Yes o% 5 Landscaping & Tree Planting Yes 0% 6 Street Lighting No NA 7 Community Buildings No NA 8 Treatrnent and disposal of sewage and No NA sullage water 9 So lid Waste management & Disposal No NA 10 Water conservatiory Rain water harvesting Yes 0% 11 Energy Management No NA 12 Fire protection and fue safety requirements Yes 0% 13 Electrical meter room, sub-station, receiving Yes 0v, station 1.4 Others (Option to Add more) 15 Aggregate Area of Recreational open Space Yours faithfully, Rasik =EH; Prabhuda l=l s Hingoo S-+'F,S*" RASIKP.HINGOO cA/8ry838s d For PRANAV CONS !.0.r-\ umbal RASIK P HING@@ ASS@GIATES ARCHITTCTU RT URBAN DESIGTTI I IT,IITRIOR DI5I6N I CONSTRUCIIO MANAGfMINT ia compli.nc.@hintooarciteds.com tl +91-9A.:['123775 | *1-22-2872ry * wwB.l$o8@ardrit€(6.com 9 tOO, fryav &rildrry grani \rtvell.n da Road. tkxt to pixt r Co cte. Gor€taon W€s4 Mumbai - 400104