FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE R/1905/2025/Rera 9 28.07.2025 To Pranav Constructions Limited, (Formerly known as Pranav Constructions Private Limited) 1001, 10th Floor, DLH Park, S. V. Road Near MTNL, Goregaon West Mumbai – 400062 Subject: Certificate of Percentage of Completion of Construction Work of “Samrat CHSL” having MAHARERA R eg ist r at io n Numbe r P51800053827 being developed by Pranav Constructions Limited. Sir, I/ We M/s. Rasik P. Hingoo Associates have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of “Samrat CHSL” having MAHARERA Registration Number P51800053827 being developed by Pranav Constructions Limited. Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MAHARERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. ..2.. -:2:- Table A Building /Wing Number _ (to be prepared separately for each Building/Wing of the Project) Sr. No Tasks /Activity Percentage of work done 1. Excavation 90% 2. 0 number of Basement(s) and 1 no. of Plinth and pit 95% parking 3. 0 number of Podiums NA 4. Stilt Floor 100% 5. 16 nos of Slabs of Super Structure 80% 6. Internal walls, Internal Plaster, Floorings 40% within Flats/Premises, Doors and Windows to each of the Flat/Premises 7. Sanitary Fittings within the Flat/Premises, 0% Electrical Fittings within the Flat/Premises 8. Staircases, Lifts Wells and Lobbies at each Floor 60% level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9. The external plumbing and external plaster, 5% elevation, completion of terraces with waterproofing of the Building/Wing, 10. Installation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate ..3.. -:3:- TABLE-B Internal & External Development Works in Respect of the entire Registered Phase Sr. Common areas and Facilities, Amenities Proposed Percentage Details No. (Yes/ of Work No) done 1 Internal Roads & Footpaths No -- NA 2 Water Supply Yes 0% -- 3 Sewerage (chamber, lines, Septic Tank, STP) Yes 0% -- 4 Storm Water Drains Yes 0% -- 5 Landscaping & Tree Planting Yes 0% -- 6 Street Lighting No -- NA 7 Community Buildings No -- NA 8 Treatment and disposal of sewage and No -- NA sullage water 9 Solid Waste management & Disposal No - NA 10 Water conservation, Rain water harvesting Yes 0% -- 11 Energy Management No -- NA 12 Fire protection and fire safety requirements Yes 0% -- 13 Electrical meter room, sub-station, receiving Yes 0% -- station 14 Others (Option to Add more) - - -- 15 Aggregate Area of Recreational open Space - - -- Yours faithfully, Rasik Digitally signed by Rasik Prabhudas Hingoo DN: c=IN, o=Personal, title=4209, pseudonym=FA08880A556CF5E64AD6C616C 4D5B977B2A050BE, Prabhudas 2.5.4.20=a752684f3f32c1590778bc1a21deb1d 8855169331130dab2ad4d5a2fc97cbdca, postalCode=400104, st=Maharashtra, serialNumber=9AE235D56A09CE35CFEBB5CF Hingoo F0EEFF2FB92A669F77E3D7792A0890A476667 FA7, cn=Rasik Prabhudas Hingoo Date: 2025.07.28 10:28:52 +05'30' RASIK P. HINGOO CA/84/8385 Agreed and accepted by: For PRANAV CONSTRUCTIONS LIMITED Pranav Kiran Ashar Managing Director