RASII( P HtilGoo r0irJAt R HINGoo sA rRRIflIGOO 8.ARCH, 6 ARCII, M, ARCH, (U. S. A,) FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE R/1905/2025lRera 8 04.04.2025 To Pranav Construc tions Limited, (Formerly known as Pranav Constructions Private Limited) 1001, 10th Floor, DLH Park, S. V. Road Near MTNL, Goregaon West Mumbai - 400062 Subject Certificate of Percentage of Completion of Construction Work of "Samrat CHSL" having MAHARERA Registration Number P51800053827 being developed by Pranav Constructions Limited. Sir, 1/ We M/s. Rasik P. Hingoo Associates have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of "Samrat CHSL" having MAHARERA Registration Number P51800053827 being developed by Pranav Constructions Limited. Based on Site Inspection, with respect to l-ayout / each of the Buildingr/Wing of the aforesaid Real Estate Projec! I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MAHARERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. 2. Table A Building /Wing Number (to be prepared separately for each - Building/ Wing of the Project) Sr. No Tasks /Activity Percentage of work done 1. Excavation 907o 2. 0 number of Basement(s) and 1 no. of Plinth and pit 95% parking 3. 0 number of Podiums NA 4. Stilt Floor 1.00% 5. 16 number of Slabs of Super Structure 80 6. Intemal walls, Intemal Plaster, Floorings 30% within Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 0'/. Electrical Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor 60% level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and extemal plaster, elevation, completion of terraces with waterproofing of the Building/ Wing, 10. lnstallation of lifts, water pumps, Fire Fighting 0% Fiftings and Equipment as per CFO NOC, Electrical Fiftings to Common Areag electro, mechanical equipment, Compliance to conditions of environment/CRz NOC, Finishing to entrance lobby / s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate ..J -:3:. TABLE-B Internal & External Development Works in Respect of the enfue Registered Phase Sr. Common areas and Facilities, Amenities Proposed Percentage Details No. (Yur/ of Work No) done 1 Intemal Roads & Footpaths No NA 2 Water Supplv Yes 0% Sewerage (chamber, lines, Septic Tank, STP) Yes 0ok 4 Storm Water Drains Yes 0y" 5 Landscaping & Tree Planting Yes 07. 6 Street Lighting No NA 7 Community Buildings No NA 8 Treahnent and disposal of sewage and No NA sullage water o Solid Waste management & Disposal No NA 10 Water conservation, Rain water harvesting Yes 0% 11 Energy Management No NA 72 Fire protection and fire safety requirements Yes o% 13 Electrical meter room, sub-statior! receiving Yes o% station 74 Others (Option to Add more) 15 Aggregate Area of Recreational open Space Yours faithfully, Rasik , ,; sHingoo ffiEIi RASIK P. HINGOO CAr/84/8385 d acc For PRANAV CON -CIs Manag ABID< D={[N!@ O @ AB€ ARCHTT€CTURE URBAN E,€SIGN INT€RIOR DESIGN CONSTRUCTION MANAG€MENT O @OATEB oFFICE: 106, PAGRAV FIRST FLOOR. NEXT TO PATKAR CoLLEGE. S.V ROAO. GOREGAON (w), MUMBAI - 400'104. TEL-:91-22-2a7246O4,2a726184. TELEFAX 91'22-2a765629, EMAIL: hingooarch{acls@yahoo.com. WEBSITET wrw.hingooarchitects.com .1, .1 u