D{[NG@@ RASIK P HINGOO KINJAL R HINGOO SAMIR R HINGOO NIRAV R HINGOO B.ARCH. B.ARCH. M.ARCH. (U. S.A.) M. S.CrVrL (U. S. A.) FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE R/'1905/2024/Rera2 30.0L.2024 To Pranav Constructions Private Limited L00L,10th Floor, DLH Park, S. V. Road Near MTNL, Goregaon West Mumbai - 400062 Sir, Subject: Certificate of Percentage of Completion of Construction Work of "Redevelopment of Samrat CHSL" having MAHARERA Registration Number P51800053827 being developed by Pranav Constructions Private Limited. Sir, I/ We M/s. Rasik P. Hingoo Associates have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of "Redevelopment of Samrat CHSL" having MAHARERA Registration Number P51800053827 being developed by Pranav Constructions Private Limited. Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MAHARERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. .2. .^. Table A Building /Wing Number _ (to be prepared separately for each Building/Wing of the Project) Sr. No Tasks/Activity Percentage of work done 1. Excavation 35% 2. 0 number of Basement(s) and 1 no. of Plinth and pit 0Yo parking 3. 0 number of Podiums NA 4. Stilt Floor 0% 5. 13 number of Slabs of Super Structure 0% 6. Internal walls, Internal Plaster, Floorings 0% within Flats/Premises, Doors and Windows to each of the Flat/Premises 7. Sanitary Fittings within the Flat/Premises, 0% Electrical Fittings within the Flat/Premises 8. Staircases, Lifts Wells and Lobbies at each Floor 0% level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9. The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/ Wing, 10. Installation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby /s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate ..3.. -.?._ TABTE-B Internal & External Development Works in Respect of the entire Registered Phase Sr. Common areas and Facilities, Amenities Proposed Percentage Details No (Yes/ of Work No) done 1 Internal Roads & Footpaths No NA 2 Water Supply Yes 0% J Sewarage (chamber, lines, Septic Tank, Yes 0% srP) 4 Storm Water Drains Yes 0% 5 Landscaping & Tree Planting Yes 0% 6 Street Lighting No NA 7 Community Buildings No NA 8 Treatment and disposal of sewage and No NA sullage water 9 Solid Waste management & Disposal No NA 10 Water conservation, Rain water harvesting Yes 0% 11 Energy Management No NA 12 Fire protection and fire safety requirements Yes 0% 13 Electrical meter room, sub-station, receiving Yes 0% station 1.4 Others (Option to Add more) 15 Aggregate Area of Recreational open Space Yours faithfully, Rasik Prabhudas Hingoo RASIK P. HINGOO cA/84/838s FoT PRANAV CONSTRU &l-c-L RAS [ [< ARCHIT€CTUR€ E D{[N!@ O @ ASS URBAN O€sIGN INT€RIOR D€SIGN CON5TRUCTION MANAG€M€NT (f @IATES OFFICE: 106, PAGRAV FIRST FLOOR, NEXT TO PATKAR COLLEGE. S.V. ROAD, GOREGAON (W). MUMBAI - 400104 TEL.:91-22-28724604.28726184, TELEFAX: 91-22-28765629. EMAIL: hingooarchitects@yahoo.com, WEBSITE; www hingooarchitects.com